Agreement No. CE5/95
Central-Wan Chai Bypass and
Island Eastern Corridor Link
Project Review Study
ENVIRONMENTAL
IMPACT ASSESSMENT
ENVIRONMENTAL
MONITORING & AUDIT MANUAL
TABLE
OF CONTENTS
1. INTRODUCTION
1.1 Purpose of the Manual
1.2 Project Background
1.3 Environmental Monitoring and Audit Requirements
1.4 Project
Organisation
2. AIR QUALITY
2.1 Introduction
2.2 Air Quality Parameters
2.3 Monitoring Equipment
2.4 Laboratory Measurement / Analysis
2.5 Monitoring Locations
2.6 Baseline Monitoring
2.7 Impact Monitoring of Construction Air Quality Impact
2.8 Environmental Quality Performance Limits
2.9 Event and Action Plan for Construction Air Quality
2.10 Construction Dust Mitigation Measures
2.11 Tunnel Emission
3. NOISE
3.1 Introduction
3.2 Noise Parameters
3.3 Monitoring Equipment
3.4 Baseline Monitoring
3.5 Impact Monitoring of Construction Noise Impact
3.6 Event and Action Plan for Construction Noise
3.7 Noise Mitigation Measures
3.8 Operational Phase Noise Monitoring
4.1 Introduction
4.2 Construction Phase
4.3 Operational Phase
5.1 Introduction
5.2 Waste Control and Mitigation Measures
6.1 Introduction
6.2 Recommended Mitigation Measures under CWB & IECL Project
7.1 Site Inspections
7.2 Compliance with Legal and Contractual Requirements
7.3 Environmental Complaints
8. REPORTING
8.1 General
8.2 Baseline Monitoring Report
8.3 Monthly EM&A Reports
8.4 Quarterly EM&A Summary Reports
8.5 Final EM&A Review Reports
8.6 Data Keeping
8.7 Interim Notifications of Environmental Quality Limit Exceedances
LIST OF TABLES
Table 1.1 Projects that may be Undertaken Simultaneously with
the CWB & IECL Project
Table 1.2 Tunnel Air Quality Guidelines
Table 2.1 Construction Dust Monitoring Locations
Table 2.2 Action / Limit Levels for Air Quality
Table 2.3 Event / Action Plan for Air Quality
Table 3.1 Noise Monitoring Stations during Construction Phase
Table 3.2 Action and Limit Levels for Construction Noise
Table 3.3 Event / Action Plan for Construction Noise
Table 3.4 Noise Monitoring Stations during Operational Noise
LIST OF FIGURES
Figure 1.1 Location and Alignment of the CWB & IECL
Figure 1.2.1 Construction Programme of the CWB & IECL
Figure 1.2.2 Construction Programme of the CWB & IECL
Figure 1.2.3 Construction Programme of the CWB & IECL
Figure 1.3 Project Organisation
Figure 2.1.1 Locations of Representative Air Sensitive Receivers
(Sheet 1 of 2)
Figure 2.1.2 Locations of Representative Air Sensitive Receivers
(Sheet 2 of 2)
Figure 2.2.1 Proposed Air Quality Monitoring Locations (Sheet 1 of
2)
Figure 2.2.2 Proposed Air Quality Monitoring Locations (Sheet 2 of
2)
Figure 3.1.1 Representative Noise Sensitive Receivers (NSRs) (Sheet
1 of 2)
Figure 3.1.2 Representative Noise Sensitive Receivers (NSRs) (Sheet
2 of 2)
Figure 3.2.1 Noise Monitoring Locations during Construction Phase
(Sheet 1 of 2)
Figure 3.2.2 Noise Monitoring Locations during Construction Phase
(Sheet 2 of 2)
Figure 3.3 Noise Monitoring Locations during Operation Phase
LIST OF APPENDICES
Appendix A Implementation Schedule
Appendix B Sample
Data Sheet for Air Quality and Noise Monitoring
Appendix C Sample
Template for the Interim Notification
Appendix D Operation
Stage Traffic Noise Monitoring – Field Survey Record Sheet