Contents
1.1 Purpose of the Manual
1.2 Background
1.3 Environmental Monitoring and Audit
Requirements
1.4 Project Organisation
1.5 Construction Programme
2.1 Air Quality Parameters
2.2 Monitoring Equipment
2.3 Laboratory Measurement / Analysis
2.4 Monitoring Locations
2.5 Baseline Monitoring
2.6 Impact Monitoring
2.7 Event and Action Plan for Air
Quality
2.8 Mitigation Measures
3.1 Noise Parameters
3.2 Monitoring Equipment
3.3 Monitoring Locations
3.4 Baseline Monitoring
3.5 Impact Monitoring
3.6 Event and Action Plan for Noise
3.7 Noise Mitigation Measures
3.8 Operational Phase Noise Monitoring
4.1 Type of Waste
4.2 Mitigation Measures
5.1 Landfill Gas Parameters
5.2 Monitoring Equipment
5.3 Monitoring Locations
5.4 Limit Levels and Action Plan for
Landfill Gas
5.5 Landfill Gas Mitigation Measures
6.
LANDSCAPE AND VISUAL
6.1 Introduction
6.2 Monitoring Details
6.3 Baseline Monitoring
6.4 Event/Action Plan for Landscape and
Visual Works
6.5 Mitigation Measures
7.1 Introduction
7.2 Mitigation Measures
8.1 Site Inspections
8.2 Compliance with Legal and
Contractual Requirements
8.3 Environmental Complaints
9.1 General
9.2 Baseline Monitoring Report
9.3 EM&A Reports
9.4 Data Keeping
9.5 Interim Notifications of
Environmental Quality Limit Exceedances
List
of Tables
Table 2.1 Proposed
Air Quality Monitoring Stations
Table 2.2 Action
/ Limit Levels for Air Quality
Table 2.3 Event
/ Action Plan for Air Quality
Table 3.1 Action
and Limit Levels for Construction Noise
Table 3.2 Event
/ Action Plan for Construction Noise
Table 3.3 Noise Monitoring Stations during Operational Phase for Worst Case Scenario (With Development to the South of Road D1)
Table 3.4 Noise Monitoring Stations during Operational Phase for the Scenario Without Development to the South of Road D1
Table 5.1 Limit
Levels and Action Plan for Landfill Gas
Table 6.1 Monitoring
Programme
Table 6.2 Construction
and Establishment Periods
List
of Figures
Figure 1.1
Project Organisation
Figure 1.2
Tentative Construction Programme
Figure
2.1 Locations of Air Quality
Monitoring Stations during Construction Phase
Figure 3.1
Locations of Noise Monitoring Stations during Construction Phase
Figure C2
Locations of Noise Barriers on At-grade Extended Road P2 and Future
Road P2 (Assessment 1)
Figure C4
Locations of Noise Barriers on Road D1 and D10 Adjacent to Area 65D
(Assessment 1)
Figure C5
Locations of Noise Barriers on Road D1 Adjacent to Areas 65B, C &
D
Figure C6
Locations of Noise Barriers on Road D10 near Area 86
Figure C7
Locations of Noise Barriers on Road D8 and Extended Road P2 (At-grade)
(Assessment 2)
Figure C8
Locations of Noise Barriers on At-grade Extended Road P2 and Future
Road P2 (Assessment 2)
Figure C9
Locations of Noise Barriers on Road D1 Adjacent to Area 67B (Assessment
2)
Figure C10
Locations of Noise Barriers on Road D1 and Road D10 Adjacent to Area
65D (Assessment 2)
Figure C11
Locations of Noise Barriers on Road D8 and Extended Road P2 (Elevated)
(Assessment 1)
Figure C13
Locations of Noise Barriers on Road D8 and Extended Road P2 (Elevated)
(Assessment 2)
Figures C15 – C22 Typical Section of Noise Barrier / Enclosure (C15,
16, 17, 18,
19, 20, 21, 22)
Figure C23
Location of Non-Building Zone
Figure C24
Location of Non-Building Zone
List
of Appendices
Appendix B
Environmental Monitoring Data Recording Sheets (B1,
2, 3)
Appendix C
Implementation Schedules of Mitigation Measures (C1,
2, 3, 4, 5, 6)
Appendix D
Environmental Proformas
Appendix E
Interim Notifications of Environmental Quality Limits Exceedances
Appendix
F Impact Prediction Review
Appendix G Operational Stage Traffic Noise Monitoring – Field Survey Record Sheet
Appendix H Powered Mechanical Equipment (PME) for the Different Construction Tasks