Contents

 

 

1.            INTRODUCTION

 

            1.1            Purpose of the Manual

            1.2            Background   

            1.3            Environmental Monitoring and Audit Requirements  

            1.4            Project Organisation    

            1.5            Construction Programme     

 

2.         AIR QUALITY

 

            2.1            Air Quality Parameters      

            2.2            Monitoring Equipment  

            2.3            Laboratory Measurement / Analysis          

            2.4            Monitoring Locations   

            2.5            Baseline Monitoring    

            2.6            Impact Monitoring      

            2.7            Event and Action Plan for Air Quality 

            2.8            Mitigation Measures   

 

3.         NOISE                       

 

            3.1            Noise Parameters      

            3.2            Monitoring Equipment  

            3.3            Monitoring Locations   

            3.4            Baseline Monitoring    

            3.5            Impact Monitoring      

            3.6            Event and Action Plan for Noise         

            3.7            Noise Mitigation Measures        

            3.8            Operational Phase Noise Monitoring      

 

4.            WASTE MANAGEMENT

 

            4.1            Type of Waste 

            4.2            Mitigation Measures   

 

5.            LANDFILL GAS MONITORING

 

            5.1            Landfill Gas Parameters           

            5.2            Monitoring Equipment  

            5.3            Monitoring Locations   

            5.4            Limit Levels and Action Plan for Landfill Gas     

            5.5            Landfill Gas Mitigation Measures        
6.            LANDSCAPE AND VISUAL 

 

            6.1            Introduction    

            6.2            Monitoring Details       

            6.3            Baseline Monitoring    

            6.4            Event/Action Plan for Landscape and Visual Works  

            6.5            Mitigation Measures   

 

7.            WATER QUALITY    

 

            7.1            Introduction    

            7.2            Mitigation Measures   

 

8.         SITE ENVIRONMENTAL AUDIT      

 

            8.1            Site Inspections      

            8.2            Compliance with Legal and Contractual Requirements  

            8.3            Environmental Complaints      

 

9.            REPORTING          

 

            9.1            General

            9.2            Baseline Monitoring Report

            9.3            EM&A Reports           

            9.4            Data Keeping          

            9.5            Interim Notifications of Environmental Quality Limit Exceedances   

 

 


List of Tables

 

Table 2.1            Proposed Air Quality Monitoring Stations           

Table 2.2            Action / Limit Levels for Air Quality      

Table 2.3            Event / Action Plan for Air Quality      

Table 3.1            Action and Limit Levels for Construction Noise  

Table 3.2            Event / Action Plan for Construction Noise  

Table 3.3            Noise Monitoring Stations during Operational Phase for Worst Case Scenario (With Development to the South of Road D1)

Table 3.4            Noise Monitoring Stations during Operational Phase for the Scenario Without Development to the South of Road D1

Table 5.1            Limit Levels and Action Plan for Landfill Gas

Table 6.1            Monitoring Programme

Table 6.2            Construction and Establishment Periods

 


List of Figures

 

Figure 1.1            Project Organisation

Figure 1.2            Tentative Construction Programme

Figure 2.1            Locations of Air Quality Monitoring Stations during Construction Phase

Figure 3.1            Locations of Noise Monitoring Stations during Construction Phase

Figure 3.2            Locations of Noise Monitoring Stations during Operational Phase (Assessment 1: With Development to the South of Road D1)

Figure 3.3            Locations of Noise Monitoring Stations during Operational Phase (Assessment 2: Without Development to the South of Road D1)

Figure C1            Locations of Noise Barriers on Road D8 and Extended Road P2 (At-grade) (Assessment 1)

Figure C2            Locations of Noise Barriers on At-grade Extended Road P2 and Future Road P2 (Assessment 1)

Figure C3            Locations of Noise Barriers on Road D1 Adjacent to Area 67B (Assessment 1)

Figure C4            Locations of Noise Barriers on Road D1 and D10 Adjacent to Area 65D (Assessment 1)

Figure C5            Locations of Noise Barriers on Road D1 Adjacent to Areas 65B, C & D

Figure C6            Locations of Noise Barriers on Road D10 near Area 86

Figure C7            Locations of Noise Barriers on Road D8 and Extended Road P2 (At-grade) (Assessment 2)

Figure C8            Locations of Noise Barriers on At-grade Extended Road P2 and Future Road P2 (Assessment 2)

Figure C9            Locations of Noise Barriers on Road D1 Adjacent to Area 67B (Assessment 2)

Figure C10            Locations of Noise Barriers on Road D1 and Road D10 Adjacent to Area 65D (Assessment 2)

Figure C11            Locations of Noise Barriers on Road D8 and Extended Road P2 (Elevated) (Assessment 1)

Figure C12            Locations of Noise Barriers on Elevated Extended Road P2 and Future Road P2 (Assessment 1)

Figure C13            Locations of Noise Barriers on Road D8 and Extended Road P2 (Elevated) (Assessment 2)

Figure C14            Locations of Noise Barriers on Elevated Extended Road P2 and Future Road P2 (Assessment 2)

Figures C15 – C22            Typical Section of Noise Barrier / Enclosure (C15, 16, 17, 18, 19, 20, 21, 22)

Figure C23            Location of Non-Building Zone

Figure C24            Location of Non-Building Zone

 

 


List of Appendices

 

Appendix A            Site Location Plan

Appendix B            Environmental Monitoring Data Recording Sheets (B1, 2, 3)

Appendix C            Implementation Schedules of Mitigation Measures (C1, 2, 3, 4, 5, 6)

Appendix D            Environmental Proformas

Appendix E            Interim Notifications of Environmental Quality Limits Exceedances

Appendix F            Impact Prediction Review

Appendix G            Operational Stage Traffic Noise Monitoring – Field Survey Record Sheet

Appendix H            Powered Mechanical Equipment (PME) for the Different Construction Tasks