Outlying Island Sewerage Scheme Stage 1 Phase II
Package J ¾ Sok Kwu Wan Sewage Treatment and Disposal Facilities
ENVIRONMENTAL MONITORING & AUDIT MANUAL
Purpose of the Manual
Project Description
Environmental Monitoring and Audit Requirements
Project Organisation
Introduction
Air Quality Parameters
Monitoring Equipment
Laboratory Measurement / Analysis
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Environmental Quality Performance Limits
Event and Action Plan
Mitigation Measures
Introduction
Noise Parameters
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Water Quality Parameters
Monitoring Equipment
Laboratory Measurement / Analysis
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Post-construction Monitoring
Event and Action Plan
Operation Phase Monitoring
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
Site Inspection
Compliance with Legal and Contractual Requirements
Environmental Complaints
General
Baseline Monitoring Report
Monthly EM&A Reports
Post Commissioning Monitoring Reports
Quarterly EM&A Summary Reports
Final EM&A Review Reports
Data Keeping
Interim Notifications of Environmental Quality Limit Exceedances
LIST OF FIGURES
Figure 1.1 General Layout Plan
Figure 1.2 Preliminary Construction Programme
Figure 1.3 Project Organisation
Figure 2.1 Locations of Representative Air Sensitive Receivers
Figure 2.2 Proposed Air Quality Monitoring Locations
Figure 3.1 Locations of Representative Noise Sensitive Receivers
Figure 3.2 Proposed Noise Monitoring Locations
Figure 4.1 Locations of Marine Water Monitoring Stations
Figure 10.1 Complaint Response Procedures
LIST OF APPENDICES
Appendix A Implementation Schedule
Appendix B Sample Data Sheets for Air Quality, Noise and Water Quality Monitoring
Appendix C Sample Template for the Interim Notification
Appendix D Outline of Emergency Response Plan