Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate

TABLE OF CONTENTS

Chapter

Title

 

 

1.

INTRODUCTION

2.

Consideration of Alternstives

3.

Project Description

4.

Air Quality Assessment

5.

Noise

6.

Water Quality Assessment

7.

Marine Ecological Assessment

8.

Risk Assessment

9.

Environmental Monitoring and Audit

10.

Conclusions and Summary of Environmental Outcomes

Annexes

 

 

Annex A

Supplementary Information for Air Quality Impact Assessment

Annex B

Supplementary Information for Noise Impact Assessment

Annex C

Supplementary Information for Marine Ecological Impact Assessment

Annex D 

Implementation Schedule 

Annex E

Bioheating Oil

Annex F

Outline Emergency Response Plan

   
Figure  
   

Figure 2.2a

Site Location Plan of the Biodiesel Plant

Figure 2.2b

Jetty with Vertical Seawall

Figure 2.2c

Piled Deck Jetty Construction (Option2, the Preferred Option)

Figure 3.2a

Site Surrounding Environment

Figure 3.2b

Process Flow Diagram of Proposed Biodiesel Plant

Figure 3.2c

Proposed Layout Plan of the Biodiesel Plant

Figure 3.2d

Verticle Profile of Biodiesel Plant (Page 1 of 2)

Figure 3.2e

Verticle Profile of Biodiesel Plant (Page 2 of 2)

Figure 3.2f

Hong Kong Biodiesel Plant at Tseung Kwan O Industrial Estate - Construction Programme

Figure 4.3a

Locations of Representative Air Sensitive Receivers

Figure 4.5a

Locations of Emission Sources

Figure 4.6a

Isopleths showing Maximum Hourly NO2 Concentrations at 1.5m above ground

Figure 4.6b

Isopleths showing Maximum Hourly NO2 Concentrations at 5m above ground

Figure 4.6c

Isopleths showing Maximum Hourly NO2 Concentrations at 10m above ground

Figure 4.6d

Isopleths showing Maximum Hourly NO2 Concentrations at 20m above ground

Figure 4.6e

Isopleths showing Maximum Hourly NO2 Concentrations at 30m above ground

Figure 4.6f

Isopleths showing Daily Average NO2 Concentrations at 30m above ground

Figure 4.6g

Isopleths showing Annual Average NO2 Concentrations at 30m above ground

Figure 4.6h

Isopleths showing Maximum Hourly NO2 Concentrations at 60m above ground

Figure 4.6i

Isopleths showing Maximum Hourly NO2 Concentrations at 90m above ground

Figure 4.6j

Isopleths showing Maximum Hourly NO2 Concentrations at 120m above ground

Figure 4.6k

Isopleths showing 5-second Odour level at 1.5m above ground

Figure 4.6l

Isopleths showing 5-second Odour level at 5m above ground

Figure 4.6m

Isopleths showing 5-second Odour level at 10m above ground

Figure 4.6n

Isopleths showing 5-second Odour level at 20m above ground

Figure 4.6o

Isopleths showing 5-second Odour level at 30m above ground

Figure 5.3a

The 300m Study Area for Noise Impact Assessment and Representative Noise Sensitive Receivers

Figure 5.3b

Locations of Existing Noise Sensitive Receivers for Assessment (Page 1 of 2)

Figure 5.3c

Locations of Existing Noise Sensitive Receivers for Assessment (Page 2 of 2)

Figure 5.3d

Locations of Planned Noise Sensitive Receivers for Assessment

Figure 6.2a

Junk Bay and Eastern Buffer Water Control Zones

Figure 6.4a

Surrounding Environment within 500m of the Project Site

Figure 7.6a

Location of Rapid Ecological Assessment Transects

Figure 7.6b

Location of Intertidal Survey Transects

Figure 7.7a

Benthic communities of the natural shoreline habitat

Figure 7.7b

Benthic communities of the shallow artificial seawall

Figure 7.7c

Representative photos of intertidal habitats observed within the Study area