Development of a Biodiesel Plant at Tseung Kwan O Industrial Estate
TABLE OF CONTENTS
Chapter
Title
1.
INTRODUCTION
2.
Consideration of Alternstives
3.
Project Description
4.
Air Quality Assessment
5.
Noise
6.
Water Quality Assessment
7.
Marine Ecological Assessment
8.
Risk Assessment
9.
Environmental Monitoring and Audit
10.
Conclusions and Summary of Environmental Outcomes
Annexes
Annex A
Supplementary Information for Air Quality Impact Assessment
Annex B
Supplementary Information for Noise Impact Assessment
Annex C
Supplementary Information for Marine Ecological Impact Assessment
Annex D
Implementation Schedule
Annex E
Bioheating Oil
Annex F
Outline Emergency Response Plan
Figure 2.2a
Site Location Plan of the Biodiesel Plant
Figure 2.2b
Jetty with Vertical Seawall
Figure 2.2c
Piled Deck Jetty Construction (Option2, the Preferred Option)
Figure 3.2a
Site Surrounding Environment
Figure 3.2b
Process Flow Diagram of Proposed Biodiesel Plant
Figure 3.2c
Proposed Layout Plan of the Biodiesel Plant
Figure 3.2d
Verticle Profile of Biodiesel Plant (Page 1 of 2)
Figure 3.2e
Verticle Profile of Biodiesel Plant (Page 2 of 2)
Figure 3.2f
Hong Kong Biodiesel Plant at Tseung Kwan O Industrial Estate - Construction Programme
Figure 4.3a
Locations of Representative Air Sensitive Receivers
Figure 4.5a
Locations of Emission Sources
Figure 4.6a
Isopleths showing Maximum Hourly NO2 Concentrations at 1.5m above ground
Figure 4.6b
Isopleths showing Maximum Hourly NO2 Concentrations at 5m above ground
Figure 4.6c
Isopleths showing Maximum Hourly NO2 Concentrations at 10m above ground
Figure 4.6d
Isopleths showing Maximum Hourly NO2 Concentrations at 20m above ground
Figure 4.6e
Isopleths showing Maximum Hourly NO2 Concentrations at 30m above ground
Figure 4.6f
Isopleths showing Daily Average NO2 Concentrations at 30m above ground
Figure 4.6g
Isopleths showing Annual Average NO2 Concentrations at 30m above ground
Figure 4.6h
Isopleths showing Maximum Hourly NO2 Concentrations at 60m above ground
Figure 4.6i
Isopleths showing Maximum Hourly NO2 Concentrations at 90m above ground
Figure 4.6j
Isopleths showing Maximum Hourly NO2 Concentrations at 120m above ground
Figure 4.6k
Isopleths showing 5-second Odour level at 1.5m above ground
Figure 4.6l
Isopleths showing 5-second Odour level at 5m above ground
Figure 4.6m
Isopleths showing 5-second Odour level at 10m above ground
Figure 4.6n
Isopleths showing 5-second Odour level at 20m above ground
Figure 4.6o
Isopleths showing 5-second Odour level at 30m above ground
Figure 5.3a
The 300m Study Area for Noise Impact Assessment and Representative Noise Sensitive Receivers
Figure 5.3b
Locations of Existing Noise Sensitive Receivers for Assessment (Page 1 of 2)
Figure 5.3c
Locations of Existing Noise Sensitive Receivers for Assessment (Page 2 of 2)
Figure 5.3d
Locations of Planned Noise Sensitive Receivers for Assessment
Figure 6.2a
Junk Bay and Eastern Buffer Water Control Zones
Figure 6.4a
Surrounding Environment within 500m of the Project Site
Figure 7.6a
Location of Rapid Ecological Assessment Transects
Figure 7.6b
Location of Intertidal Survey Transects
Figure 7.7a
Benthic communities of the natural shoreline habitat
Figure 7.7b
Benthic communities of the shallow artificial seawall
Figure 7.7c
Representative photos of intertidal habitats observed within the Study area