1.                  INTRODUCTION                                                                                                  1-1

1.1              Purpose of the Environmental Monitoring and Audit Manual                          1-1

1.2              Project Background                                                                                      1-2

1.3              Project Location and Scope                                                                          1-3

1.4              Project Implementation Programme                                                               1-3

1.5              Mitigation Measures listed in the EIA Report                                                 1-3

1.6              Project Organization                                                                                     1-4

1.7              Approved EIA Report and Environmental Permit                                          1-8

 

2.                  AIR QUALITY                                                                                                        2-1

2.1              Introduction                                                                                                  2-1

2.2              Air Quality Parameters                                                                                  2-1

2.3              Monitoring Equipment                                                                                   2-1

2.4              Laboratory Measurement/Analysis                                                                2-3

2.5              Monitoring Locations                                                                                    2-4

2.6              Baseline Monitoring                                                                                      2-5

2.7              Impact Monitoring                                                                                        2-6

2.8              Event and Action Plan for Air Quality                                                            2-7

2.9              Mitigation Measures                                                                                     2-9

 

3.                  NOISE                                                                                                                    3-1

3.1              Introduction                                                                                                  3-1

3.2              Noise Parameters                                                                                         3-1

3.3              Monitoring Equipment                                                                                   3-1

3.4              Monitoring Locations                                                                                    3-2

3.5              Baseline Monitoring                                                                                      3-3

3.6              Impact Monitoring                                                                                        3-3

3.7              Event and Action Plan for Construction Noise                                               3-4

3.8              Mitigation Measures                                                                                     3-6

 

4.                  WATER QUALITY                                                                                                 4-1

4.1              Introduction                                                                                                  4-1

4.2              Water Quality Parameters                                                                             4-1

4.3              Monitoring Equipment                                                                                   4-2

4.4              Laboratory Measurement/Analysis                                                                4-4

4.5              Monitoring Locations                                                                                    4-6

4.6              Baseline Monitoring                                                                                      4-7

4.7              Impact Monitoring                                                                                        4-8

4.8              Event and Action Plan for Water Quality                                                       4-9

4.9              Water Quality Mitigation Measures                                                             4-12

 

5.                  WASTE MANAGEMENT                                                                                      5-1

5.1              Waste Management Measures during Construction                                        5-1

5.2              Site Audit                                                                                                     5-7

5.3              Waste Management Measures during Operation                                            5-8

 

6.                  ECOLOGY                                                                                                             6-1

6.1              Introduction                                                                                                  6-1

6.2              Monitoring and Audit during Construction Phase                                           6-1

6.3              Event and Action Plans for Ecology during Construction Phase                      6-2

6.4              Monitoring and Audit during Operation Phase                                               6-3

6.5              Ecological Mitigation Measures                                                                     6-4

 

7.                  FISHERIES                                                                                                             7-1

7.1              Introduction                                                                                                  7-1

7.2              Monitoring and Audit                                                                                    7-1

 

8.                  LANDSCAPE AND VISUAL                                                                                 8-1

8.1              Introduction                                                                                                  8-1

8.2              Baseline Monitoring                                                                                      8-1

8.3              Monitoring and Audit                                                                                    8-1

8.4              Event and Action Plan                                                                                   8-2

8.5              Landscape and Visual Impact Mitigation Measures                                        8-3

 

9.                  SITE ENVIRONMENTAL AUDIT                                                                         9-1

9.1              Site Inspection                                                                                              9-1

9.2              Compliance with Legal and Contractual Requirements                                   9-2

9.3              Environmental Complaints                                                                             9-3

 

10.              REPORTING                                                                                                        10-1

10.1          General                                                                                                      10-1

10.2          Documentation                                                                                           10-1

10.3          Baseline Monitoring Report                                                                         10-1

10.4          Monthly EM&A Reports                                                                            10-2

10.5          Quarterly EM&A Summary Reports                                                           10-7

10.6          Final EM&A Review Report                                                                       10-9

10.7          Data Keeping                                                                                           10-11

10.8          Electronic and Real Time Reporting of EM&A Information                        10-11

10.9          Interim Notifications of Environmental Quality Limit Exceedances              10-12

10.10      Sample Templates                                                                                    10-12

 

END OF TEXT

 

 

APPENDICES

 

Appendix A      Project Implementation Schedule

Appendix B      Proforma for EM&A Programme

 

LIST OF TABLES

 

Table 2.1          Air Quality Monitoring Stations

Table 2.2          Air Quality Monitoring Locations, Parameters, Frequency and Duration for Baseline

Table 2.3          Action and Limit Levels for Air Quality

Table 2.4          Event/Action Plan for Air Quality

Table 3.1          Noise Monitoring Stations for Baseline and Construction Monitoring

Table 3.2          Action and Limit Levels for Construction Noise

Table 3.3          Event/Action Plan for Construction Noise Monitoring

Table 3.4          Quiet Powered Mechanical Equipment Recommended for Use during Construction Phase

Table 3.5          Summary of Proposed Construction Noise Mitigation Measures

Table 4.1          Water Quality Parameters

Table 4.2          Proposed Monitoring Locations for Water Quality

Table 4.3          Water Quality Monitoring Locations, Parameter, Frequency and Duration for Baseline

Table 4.4          Locations, Parameters, Frequencies and Durations during Construction Phases

Table 4.5          Action and Limit Levels for Water Quality

Table 4.6          Event and Action Plan for Water Quality

Table 6.1          Event and Action Plan for Ecology during Construction Phase

Table 8.1          Event and Action Plan for Landscape and Visual Impact – Construction Phase

Table 8.2          Summary of Landscape and Visual Mitigation Measures Programming Management

 

 

LIST OF FIGURES

 

Figure 1.1         General Location Plan of the Project

Figure 1.2         General Layout of Hang Hau Tsuen Channel

Figure 1.3         Sections of Hang Hau Tsuen Channel (Sheet 1 of 2)

Figure 1.4         Sections of Hang Hau Tsuen Channel (Sheet 2 of 2)

Figure 1.5         Project Organisation Chart

Figure 2.1         Locations of Proposed Air Quality Monitoring Station and Representative Air Sensitive Receivers

Figure 3.1         Locations of Proposed Noise Monitoring Station and Representative Noise Sensitive Receivers

Figure 4.1         Locations of Proposed Water Quality Monitoring Stations

Figure 9.1         Complaint Response Procedures