CONTENTS
Page
1.1 Purpose of the Environmental Monitoring and Audit Manual 1-1
1.3 Project Location and Scope 1-3
1.4 Project Implementation Programme 1-3
1.5 Mitigation Measures listed in the EIA Report 1-3
1.7 Approved EIA Report and Environmental Permit 1-8
2.1
Introduction 2-1
2.2
Air Quality Parameters 2-1
2.4
Laboratory
Measurement/Analysis 2-3
2.8
Event and Action Plan for
Air Quality 2-7
3.
NOISE 3-1
3.1
Introduction 3-1
3.7
Event and Action Plan for
Construction Noise 3-4
4.1
Introduction 4-1
4.2
Water Quality Parameters 4-1
4.4
Laboratory
Measurement/Analysis 4-4
4.8
Event and Action Plan for
Water Quality 4-9
4.9
Water Quality Mitigation
Measures 4-12
5.1
Waste Management Measures
during Construction 5-1
5.2
Site Audit 5-7
5.3
Waste Management Measures
during Operation 5-8
6.
ECOLOGY 6-1
6.1
Introduction 6-1
6.2
Monitoring and Audit
during Construction Phase 6-1
6.3
Event and Action Plans
for Ecology during Construction Phase 6-2
6.4
Monitoring and Audit
during Operation Phase 6-3
6.5
Ecological Mitigation
Measures 6-4
7.1
Introduction 7-1
8.1
Introduction 8-1
8.5
Landscape and Visual
Impact Mitigation Measures 8-3
9.
SITE ENVIRONMENTAL AUDIT 9-1
9.2
Compliance with Legal and
Contractual Requirements 9-2
9.3
Environmental Complaints 9-3
10.
REPORTING 10-1
10.1
General 10-1
10.2
Documentation 10-1
10.3
Baseline Monitoring
Report 10-1
10.4
Monthly EM&A
Reports 10-2
10.5
Quarterly EM&A
Summary Reports 10-7
10.6
Final EM&A Review
Report 10-9
10.7
Data Keeping 10-11
10.8
Electronic and Real
Time Reporting of EM&A Information 10-11
10.9
Interim Notifications
of Environmental Quality Limit Exceedances 10-12
10.10 Sample Templates 10-12
END OF TEXT
APPENDICES
Appendix A Project Implementation Schedule
Appendix B Proforma for EM&A Programme
LIST OF TABLES
Table 2.1 Air Quality Monitoring Stations
Table 2.2 Air Quality Monitoring Locations, Parameters, Frequency and Duration for Baseline
Table 2.3 Action and Limit Levels for Air Quality
Table 2.4 Event/Action Plan for Air Quality
Table 3.1 Noise Monitoring Stations for Baseline and Construction Monitoring
Table 3.2 Action and Limit Levels for Construction Noise
Table 3.3 Event/Action Plan for Construction Noise Monitoring
Table 3.4 Quiet Powered Mechanical Equipment Recommended for Use during Construction Phase
Table 3.5 Summary of Proposed Construction Noise Mitigation Measures
Table 4.1 Water Quality Parameters
Table 4.2 Proposed Monitoring Locations for Water Quality
Table 4.3 Water Quality Monitoring Locations, Parameter, Frequency and Duration for Baseline
Table 4.4 Locations, Parameters, Frequencies and Durations during Construction Phases
Table 4.5 Action and Limit Levels for Water Quality
Table 4.6 Event and Action Plan for Water Quality
Table 6.1 Event and Action Plan for Ecology during Construction Phase
Table 8.1 Event and Action Plan for Landscape and Visual Impact – Construction Phase
Table 8.2 Summary of Landscape and Visual Mitigation Measures Programming Management
LIST OF FIGURES
Figure 1.1 General Location Plan of the Project
Figure 1.2 General
Layout of Hang Hau Tsuen Channel
Figure 1.3 Sections
of Hang Hau Tsuen Channel (Sheet 1 of 2)
Figure 1.4 Sections
of Hang Hau Tsuen Channel (Sheet 2 of 2)
Figure 1.5 Project
Organisation Chart
Figure 4.1 Locations
of Proposed Water Quality Monitoring Stations