1.         INTRODUCTION

1.1       Background. 1-1

1.2       The Assignment 1-1

1.3       EIA Study Scope. 1-1

1.4       Purpose of this EM&A Manual 1-2

1.5       Project Programme

1.6       Implementation Programme

1.7       Impact Prediction Review Procedures

1.8       Assessing Effectiveness of Environmental Management System, Practices and Procedures

 

1.9       Project Organisation

1.10    Structure of this EM&A Manual 1-6

 

2.         NOISE

2.1       Introduction. 2-1

2.2       Noise Sensitive Receivers. 2-1

2.3       Monitoring Requirements. 2-2

2.4       Mitigation Measures2-7

 

3.         AIR QUALITY

3.1       Introduction

3.2       Air Sensitive Receivers. 3-1

3.3       Mitigation Measures

3.4       Audit Requirements

 

4.         WATER QUALITY

4.1       Introduction

4.2       Water Sensitive Receivers. 4-1

4.3       Monitoring Requirements

4.4       Mitigation Measures.

4.5       Audit Requirements. 4-2

 

5.         WASTE MANAGEMENT IMPLICATION

5.1       Introduction

  5-1

5.2       Mitigation Measures. 5-1

5.3       Audit Requirements. 5-2

 

6.         LANDSCAPE AND VISUA

6.1       Introduction

6.2       Mitigation Measures

6.3       Audit Requirements. 6-1

 

7.         ENVIRONMENTAL AUDIT

7.1       Site Inspection

7.2       Compliance with Statutory and Contractual Requirements

7.3       Environmental Complaints. 7-2

 

8.         REPORTING

8.1       Introduction

8.2       Baseline Monitoring Report

8.3       Monthly EM&A Reports

8.4       Data Keeping

8.5       Interim Notifications of Environmental Exceedances

 

9.         TERMINATION OF EM&A PROGRAMME

 

TABLES

Table 2.1                 Representative Noise Sensitive Receivers

Table 2.2                 Representative Noise Sensitive Receivers Identified for Construction Noise Impact Monitoring

Table 2.3                 Action and Limit (A/L) Levels for Construction Noise Monitoring

Table 2.4                 Event and Action Plan for Construction Noise Monitoring

Table 3.1                 Representative Air Sensitive Receivers

Table 4.1                Water Sensitive Receivers within Eastern Buffer WCZ

 

FIGURES

Figure 1.1               Location of the Site of the EMSD Workshop in Chai Wan

Figure 2.1               Noise Sensitive Receivers Identified within 300m of the Project

Figure 2.2               Locations of Noise Monitoring Station for Construction Phase

Figure 3.1               Locations of Representative Air Sensitive Receivers

Figure 4.1               Water Sensitive Receivers within Eastern Buffer WCZ

 

APPENDICES

Appendix 1.1          Implementation Schedule for Environmental Mitigation Measures

Appendix 1.2          Construction Programme

Appendix 2.1          Template for Noise Monitoring Field Record Sheet

Appendix 7.1          Complaint Handling Procedures

Appendix 8.1          Template for Interim Notifications of Environmental Quality Limits Exceedances