Chapter Title
Tables
Table 2.1:__ Ocean
Park Attendance (2008-2013) from Annual Report
Table 2.2:__ Levels
and Corresponding Major Facilities for the Project
Table 2.3:__ Summary
of Layout and Design of Scheme Options Considered
Table 2.4:__ Summary
of Alternative Construction Methods and Environmental Benefits / Dis-benefits
Table 2.5:__ Summary
of Recommended Option of Construction Methods
Table 2.6:__ Summary
of Construction Programme
Figures
Figure 2.2 Artistic
Impression of the Preferred Scheme –
Front View
Figure 2.3 Artistic
Impression of the Preferred Scheme –
Back View
Figure 2.4 Artistic
Impression of the Indoor Water Park
Figure 2.5 Artistic
Impression of the Outdoor Water Park
Figure 2.6 Proposed
Project Layout Plan of the Preferred Scheme
Figure 2.7 Vertical
Sections of the Preferred Scheme
Figure 2.8 Comparison
of Flamingo Pond in the Original Scheme and the Preferred Scheme
Appendices
Appendix 2.1a Original Scheme developed during the stage
of Technical Feasibility
Appendix 2.1b Current Scheme developed during the course
of EIA study
This section provides a description of the proposed Project, which includes details relating to the need for and environmental benefits of the Project, the Project design and the layout, background information on the consideration of alternatives as well as indicative construction methods and tentative programme details.
Project information presented in this version of the EIA is based on the on-going initial schematic design which is considered as the best available information at the time of writing this EIA.
OPC is a not-for-profit statutory body incorporated in Hong Kong under the Ocean Park Corporation Ordinance enacted in 1987. The Corporation’s principal activity is to manage and control Ocean Park as a public recreational and educational park.
Mission of OPC is to provide all guests with memorable experiences that combine entertainment and education, while inspiring life-long learning and conservation advocacy. The Corporation’s aim is to maintain a healthy financial status, while striving to deliver the highest standards of safety, animal care, products and guest service.
With the opening of the Aqua City and Rainforest in 2011, and the completion of the Thrill Mountain and the Polar Adventure in 2012, OPC’s Repositioning project has fulfilled its role as a distinctive milestone in the development history of the Hong Kong’s home grown theme park. To establish a long term sustainability of Ocean Park beyond 2012, the next step is to evaluate the strategic expansion of the Ocean Park at the TSW with its mission to enhance the attractiveness of Ocean Park as a world class theme park and to provide a “must see” experience for visitors.
The facilities currently residing in TSW area includes Entrance/Exit Building, Aviary, Bird Paradise Pond, Flamingo Pond, Treasure Palace and the Middle Kingdom Restaurant, Public toilets and 11kv Electrical Sub-station. The TSW entrance has been temporarily closed since January 2011, and since then the main entry to the Ocean Park goes through the new main entrance plaza at Wong Chuk Hang.
The Project plans to have a Water Park together with related retail, dining and associated facilities. There are two planned hotel developments, namely Fisherman’s Wharf Hotel and Spa Hotel. However, they are not considered as part of the current Project scheme. Presently there is no programme or any other information available for the hotel developments. A Market and Financial Analysis Report for the Project has been undertaken in May 2011. The analysis recommended the positioning, range of amenities and the optimum size of the Project. TFS for the proposed Project including a conceptual design was completed in June 2012 and project information outline was also prepared in March 2013.
The Project intends to be a standalone destination while enhancing the additional attendance to the Ocean Park. It will also serve as a “second gate” to the successful Ocean Park and draw visitation from both tourists and local resident market.
The key objectives of the Project are to:
§
Create a unique, world-class destination in aquatic leisure and entertainment
in the subtropical city of Hong Kong
§
Establish a long term sustainability of the Ocean Park and enhance the attraction
to tourists as well as local residents
§
Provide aquatic leisure with an indoor section housing the Winter Park
and an outdoor Summer Park. The two areas will be operated as one gate, with
the Summer Park used predominately during the warmer months while the Winter
Park can operate all year round
§ Incorporate environmental and sustainability measures throughout the entire life cycle of the development stages including planning, design, construction, operation and maintenance
The TSW development area, i.e. the Project area, is located to the south-western side of Brick Hill facing the Aberdeen Channel. The Project area comprises predominately Park facilities and peripheral woodland, plantation and tall shrubland on hillside. Figure 2.1 shows the proposed Project boundary.
Since the issuance of the EIA Study Brief (ESB-261/2013) in June 2013, the proposed Project Boundary has been revised as shown in Figure 2.1 due to design changes. These changes have incorporated environmental friendly designs to minimise potential environmental impacts of the Project. Details of these design changes are discussed in Section 2.7. The proposed Project Boundary as shown in Figure 2.1 demarcates the works limit. No construction works of the Project will be carried out outside this Project Boundary.
The existing TSW site was constructed in early 1990. The attractions at TSW, which had been operated as Middle Kingdom, Aviary, Flamingo Pond and Bird Paradise till January 2011, have been built on reclamation along the coastline.
To accommodate the increasing visitor demand as indicated in Table 2.1, the Repositioning project has improved the park’s facilities and attractions and elevated the park’s tourism appeal. However, in achieving the long term sustainability of Ocean Park by enhancing its attractiveness and providing a “must see” experience of visitors, there is a further need to strategically redevelop the Ocean Park at TSW. To be located at the picturesque TSW, the Project will be a significant design statement for Hong Kong, as it will feature a translucent and sweeping roof, along with world class facilities and services. The Project will have state-of-the-art water rides, a variety of attractions, as well as unique and innovative experiences for locals and guests from around the world.
Table
2.1: Ocean
Park Attendance (2008-2013) from Annual Report
Year |
Ocean Park Attendance |
2008-2009 |
over 4.8 million |
2009-2010 |
about 5.1 million |
2010-2011 |
nearly 5.9 million |
2011-2012 |
about 7.1 million |
2012-2013 |
over 7.7 million |
Though the Project is a stand-alone development, it also serves to provide benefit and to draw additional attendance to the Park, which would complement the existing theme park by facilitating a longer length-of-stay for visitors.
The state-of-the-art indoor/outdoor Water Park shall have an instantaneous capacity of approximately 7,000 visitors and an estimated highest daily attendance of approximately 10,500 visitors. The all-season Water Park together with its retail, dining and entertainment areas will allow year round visits to the Ocean Park. The design will focus on the experience of visitors to ensure that there is a multitude of activities and fun for all ages. This provision of a mix of amenities and attractions will help encourage repeated attendance throughout the year. As a multi-gate offering (i.e. theme park and water park), OPC will encourage longer lengths of stay amongst visitors both in the Ocean Park and in Hong Kong, thereby elevating the destination market presence locally and throughout the region.
As the only local Water Park, this Project will cater to the needs and demands for such services from the local market, as well as offer the depth of tourism infrastructure that continues to make Hong Kong a desired destination. Countless memories and precious moments of the Hong Kong community were previously intertwined with Ocean Park’s original Water World for years. The Project will provide a return of a place that the people of Hong Kong have missed, and a chance to create future lasting and fond memories.
In addition, the Project is expected to enrich the overall tourism appeal of Hong Kong and diversify tourist attraction. Given that visits to the Ocean Park are expected to be a full-day experience, it is estimated that the length of stay for non-local visitors will be extended by 0.75 day with the addition of the Water Park. The Project is projected to contribute significantly to the local economy and drastically stimulate industry growth – it is estimated to create 2,900 jobs, as well as generate HK$842 million in tourism growth, for the local economy. Furthermore, the proposed Project will be a new recreation destination for locals.
The Project will redevelop the existing theme park areas at TSW into a Water Park to enhance the attractiveness of Ocean Park into a world-class theme park and provide a must-see destination to the visitor. Artistic impressions of the preferred scheme for the Project are shown in Figure 2.2 and Figure 2.3. The Project area, of approximately 6.63 ha, is expected to comprise of a series of platforms matching with the natural topography of TSW and will not involve any marine works. The Project can be largely categorised into the following parts:
ˇ An Indoor Zone – water park with a wave pool, lazy river, play structure, water slides, surf-rider, various pools, food and beverage (F&B) facilities, electrical and mechanical (E&M) utilities, back of house and car-parking (refer to Figure 2.4 for artistic impression of the indoor water park)
ˇ An Outdoor Zone – water park with a wave pool, lazy river, water slides, ride platforms, various pools; ‘sea turtle’ exhibit; and some small-scale F&B facilities (refer to Figure 2.5 for artistic impression of the outdoor water park)
ˇ General Approach Area – coach and taxi drop-off point and Emergency Vehicular Access Road (EVA)
ˇ Sewerage Facilities – sewage sump pit and twin above-ground rising mains of 150mm diameter each
The opening hours of the Water Park will be
from 9 a.m. to 11 p.m. daily. The proposed Project layout plan of the preferred
scheme is shown in Figure 2.6, which
includes the various levels and major facilities as summarised in Table 2.2. Details of the level plan and vertical
alignment can be found in Figure 2.7.
Table 2.2: Levels and Corresponding Major Facilities for
the Project
Level |
Major Facilities |
Basement |
· Parking · Mechanical and Electrical Plant (MEP) |
Level 1 |
· Entrance and Ticketing Office · ‘Sea Turtle’ exhibit · Flamingo Pond · Interactive Water Element · Lobby · Changing rooms · F&B · Retail stores |
Level 2 |
· Outdoor wave pool · Lazy rivers (indoor and outdoor) · Plunge pools for slides · Indoor surf rider · Slides |
Level 3 |
· Indoor wave pool · Indoor play structure · Outdoor infinity pools · Outdoor spa pools · Outdoor activity pool |
Platform Level |
· Platforms of water slides · Mat racer platform · Water slides |
The “without project” scenario considers the implications of
the development works not occurring at the Project area. The Project has been conceived
and designed to meet the needs as described in Section 2.4. If the Project were not to proceed, the need
for the Project would not be met and
the increasing visitor demand could
not be entertained, hence missing the golden opportunity
to provide an unique Water Park
facility as a fresh local recreation, which would in turn compromise the opportunities to strengthen the tourism industry and local employment rate in
Hong Kong. As a result, the opportunity costs arising
from the “without project” scenario could not be under-estimated.
The “without project” scenario therefore fails to meet the objectives of OPC to establish long-term sustainability of Ocean Park, to enhance the additional attendance to the Ocean Park and to cope with the possible overcrowding problem. Notwithstanding the environmental issue arise (but they are expected to be surmountable as detailed in this EIA study), consequential negative impacts are likely that the attraction of the Park would be significantly diminished.
At the TFS stage, an original Project scheme was developed (as presented in the Project Profile No. PP-486/2013). This original Project scheme is shown in Appendix 2.1a for reference. It was arranged in the original layout that: (1) a stand-alone structure located south-west of the site which incorporates a definitive indoor water park facility under a singular large span roof, and (2) a separate outdoor water park component linked at the north-east corner via a lazy river. The building form was adopted to achieve the maximum utilisation of space for major activities/function. A large ‘clam shell-like’ building structure thus resulted as the iconic feature in the original scheme.
The
design concept for the Project has been improved to better blend with
the natural environment.
The overall design goal is to create a dynamic, striking Water Park deeply rooted
into the natural surroundings and local site topography. Unlike traditional
water parks, the preferred scheme aims to integrate the indoor, outdoor,
entrance plaza, visitor's journey, rides, architecture and structure in a
holistic response to the design brief. This scheme now takes good advantage of the existing
slope conditions by locating ride platforms on or near the slopes to minimise
the amount of structural support required. The building forms are an extension
of the existing slope topography integrating the Water Park rides and spaces
blurring the edges between indoor and outdoor zones as well as maximising views
towards the bay. Cascading pools integrated with the natural surroundings thus
result as an iconic feature in the preferred scheme, are shown in Figure 2.2 and Appendix 2.1b.
Avoidance of environmental impact has been taken into account during consideration of alternatives for layout and design. Ecological concern is recognised for the Project, key ecological habitat has been scoped out at the initial stage of the development and due consideration was given for conservation of key ecological resource during the option development stage.
The preferred development option has many benefits from ecological perspective over other alternative options. For instance, in relation to habitat disturbance, the original design places the slides on both northern and southern side of the Project area affecting the natural habitat in both areas. It spreads the impact on natural habitat at different locations and affects the flora species of conservation concern Artocorpus hypargyrues and Platycodon grandiflorus on the southern side of the Project area. On the contrary, the preferred layout design limits the impact on natural habitat to the northern side only and will enhance the habitat at the southern side of the Project area for ardeid community. The difference between the two different schemes is presented in Figure 2.8 whilst details of the ecological impact assessment are presented in Chapter 10 Ecology Chapter.
Other than habitat loss, impact on the wild birds using the Project area is of ecological concern. It has been recognised that the roosting place of ardeid was mainly concentrated at the Flamingo Pond, therefore preservation of the Flamingo Pond had been considered. However, as the Flamingo Pond is located on the flat area at the centre of the Project Site, keeping the pond in the original location will unavoidably move other building structures aside or uphill to hillside slope, which is not preferable from environmental and engineering perspective. Also, keeping the Flamingo Pond at the centre of the Project area (refer to Figure 2.8) will unlikely attract wildlife because of the high level of human activities nearby. Therefore, a more balanced approach adopted in the preferred layout is to relocate the Flamingo Pond to the southern side of the Project area, which is “isolated” from the main structure and park activities at the central and northern part of the Project area, as illustrated in Figure 2.8. This setting, together with enhanced vegetation near the pond, is considered to have higher potential to attract wild bird.
Overall speaking, the preferred layout option has taken into account the main ecological concerns arising from the Project and has been incorporated with appropriate design features which make it ecologically more preferable when compared to the original design. Such design features are summarised in Table 2.3.
Table 2.3: Summary of Layout and Design of Scheme Options Considered
Aspect |
Original Scheme |
Preferred scheme |
Environmental Benefits / Dis-benefits |
Footprint on hillside |
Outdoor swimming pools sitting on the hillside; cut/excavation into the slope at the valley requiring clearance of natural habitat at both northern and southern side of the Project Site. |
Swimming pools to be built on platforms supported by stilts; Make good use of the already developed areas (refer to Level 1 Plan presented in Appendix 2.1b); Establishing series of platform and applied to the relatively gentle slopes on the east, north-east and south-east which require clearance of natural habitat at northern side. |
The need of large-scale slope works and subsequent loss of woodland/ shrubland in the periphery; the natural landscape and ecological environment are preserved as far as possible. The preferred scheme limits the clearance of natural habitat to the northern side of the Project area only and preserves the southern side as an enhancement area for wild bird use. Potential visual impacts are minimised in the preferred scheme. |
Main Building Structure |
Stand-alone structure located south-west of the site which incorporates a definitive indoor water park facility under a singular large span roof. |
“Terrace” concept with cascading pools, which streamlines the artificial structure to match with hillside landscape |
Visual impact of the indoor zone enclosure in the original design is more prominent and substantial. Lack of green and natural landscape to be integrated into the indoor and outdoor structures in the original scheme and hence low compatibility with the surroundings. The enclosure adopts extensive glazing which pose higher risk of bird collision. Preferred scheme reduces visual impact of the park with the hillscape and increased compatibility with the surroundings; minimised use of glazing which reduces bird collision risk and is a more bird friendly design |
Flamingo Pond |
Flamingo pond is located at the centre of the Water Park (near the entrance) next to the Indoor Zone building structure. |
Flamingo pond is located at southern part of the site with separation from the main building structure. |
Compatibility
with natural environment and favourable for wildlife Original scheme – area around the Flamingo Pond can only provide very limited planting; its location (near the entrance) receives high degree of anthropogenic disturbance and highly glazed building structure. The whole setting is not favourable for matching with natural environment and for wildlife use. Preferred scheme – large area of plants and vegetation available behind the pond; relatively undisturbed by anthropogenic activities by the Project. The setting is more compatible to natural environment and favourable for wildlife |
With the selection of a more “natural” design scheme, a number of environmental friendly features have been incorporated into the current design. These include:
ˇ Blending of the building structure
with nature environment and preserving the natural landscape and topography
with a series of cascading platforms positioned within the Brick Hill valley.
The building forms an extension of the existing slope topography integrating
the Water Park rides; spaces blurring the edges between indoor/ outdoor zones
while maximising views towards the bay;
ˇ The orientation of building has been
positioned where building faces predominantly south-west to receive maximum
daylight;
ˇ Taking advantage of the existing
slope conditions by locating ride platforms on or near the slope to minimise the amount of support structure required;
ˇ Landscaping would permeate into the
indoor and outdoor spaces, and the surrounding landscape emerging into the
existing valley to minimise visual impact;
ˇ Providing green roof and skylights
to minimise reflection from roofing materials and
blending into the existing hillscape. Reduced use of
large glazing or transparent screening to minimise
the risk of bird collision;
ˇ Indoor area to be categorised into different thermal zones according to
functional requirement to minimise the energy
consumption;
ˇ Adopting natural ventilation for the
indoor Water Park area during summer with minimal mechanical ventilation to
achieve both the thermal comfort and energy saving;
ˇ Adopting heat exchangers for
retrieving waste heat from the Air Conditioning System for pre-heating of hot
water for general ablution and pool heating;
ˇ Alternation to existing seawall and
marine works have been avoided hence no impact on surrounding marine life;
ˇ Adopting Building Information
Modeling (BIM) facilitates a more efficient design and construction
coordination and to avoid unforeseen clashes which subsequently generate
abortive work and construction waste.
In addition to the above environmentally friendly features that have already been integrated with the design, the following extra design features will also be considered in the detailed design, construction and operation phases to further enhance the environmental performance of the Project:
ˇ Selection of environmental friendly
and sustainable building materials;
ˇ Introducing rainwater harvesting
system for recycling storm water on irrigation or cleaning purpose;
ˇ Using renewable energy systems and
energy efficient device, such as solar landscape lighting, lighting control
management system, low energy consumption signs, low flow shower heads, dual
flushing cisterns and co-generation/ tri-generation;
ˇ For selection of mechanically
efficient systems, the following measures for high energy efficiency will be
used in HVAC system: evaporative cooling tower & gas absorption chiller,
variable outside air quantity and economizer free cooling off system;
ˇ Consideration of pre-bored rock
socket steel H-piles for foundation which could generate less noise and vibration
as well as impose least disruption to the terrain;
ˇ Earth retaining structures and
temporary cut slopes, and excavation lateral support system for pile caps to
generate smaller volumes of excavated materials and balance the cut and fill
volume in order to reduce any surplus earth material disposal and minimise waste management implications;
ˇ Using electric vehicles for guest
shuttle service and staff transportation subject to the development of
available technology.
The major construction
activities involved in the Project are foundation works, site
formation, slope stabilisation works, main building
and superstructure construction and sewerage facilities. Comparison of
alternative options for these construction activities are presented in Table 2.4:
Table 2.4: Summary of Alternative Construction Methods and Environmental Benefits / Dis-benefits
Construction Activity |
Technical Requirements |
Constraints |
Environmental Benefit / Dis-benefit |
Foundation Works Options |
|
|
|
Large diameter bored pile |
Comparatively larger working spaces are required due to larger piling plants. This pile type has the largest structural capacities to cater for lateral and vertical loads and less numbers of piles are required |
May be susceptible to bulging or necking during pile concreting in unstable ground to the larger pile size |
More Construction and Demolition (C&D) material will be generated comparing with driven H-piles |
Pre-bored rock socket steel H-piles |
Working spaces required are smaller and flexible to suit the design of the structures, relatively easy to overcome underground obstructions |
May be susceptible to bulging or necking during pile concreting in unstable ground. Possible collapse of the annulus space (over-cut) between the side wall and temporary casing before pile concreting would reduce the skin friction. The design loading is smaller comparing with bored piles. |
Generates less noise and vibration; Reduces disruption to the sloped and forested terrain; Less excavation and so reduces material disposal |
Driven steel H-piles |
Lower loading capacity leading to greater number of piles required. Smaller working space and flexible to suit the design of the structures |
Higher ground borne vibration and movement induced from the driving operation, may cause damage to adjacent piles, structures and utilities installations. Pre-boring may be required to overcome underground obstructions and require longer construction period |
Generates the greatest noise and vibration which may impact nearby noise sensitive receivers (NSRs) |
Site Formation and Slope Stabilisation
Options |
|||
Earth retaining structures and temporary cut slopes |
Requires working space for provision of temporary cut slopes and also slope stabilisation |
Trees above slopes |
Relatively small volumes of excavation are required in comparison with shallower angled permanent cuts, but thicker building walls (more concrete) are required as they are earth retaining structures. |
Permanent cut slopes |
Requires stabilisation of permanent cut slopes |
Trees above slopes |
Relatively large excavation volumes than for steeper temporary cuts for earth retaining structures. Thinner building walls (less concrete) required as not earth retaining. |
Placement of fill in areas where proposed building structure is above existing ground level. |
Compaction of fill |
Suitable fill material required |
Thicker building walls (more concrete) as walls earth retaining. May utilise cut material as fill. |
Excavation lateral support system for pile caps |
Excavations for pile caps may require temporary support where there is insufficient space for open cut. Options include sheet piling or temporary soil nails. |
Construction duration will be increased due to the construction of ELS system |
Excavation extent (and potential ground water ingress where occurs) is minimised by the use of temporary support methods such as sheet piles and soil nails. |
Utilities, roadworks and landscaping |
Conventional methods |
No specific constraints |
No difference |
Disposal by trucks |
None |
Construction trucks may only leave the site through Sham Wan Road |
Potential increase in dust and road traffic noise impact to adjacent air sensitive receivers (ASRs) / NSRs |
Disposal by barges |
Designated barging point required |
Sloping seawall along coastline. Time required for approval of barging point by relevant government departments. |
Potential water quality impacts from barge loading operations |
Superstructure Options |
|
|
|
Conventional in-situ reinforced concrete construction |
Simple construction method suitable for complicated structural form of structures, extensively adopted by local contractors |
No specific constraints |
More C&D waste will be generated compared to precast concrete. Noise generation due to concreting works |
Precast concrete |
Suitable for structures with standardised structures |
Uneconomical if only a small number of units is required. Connection details may have to be specially designed and therefore expensive. Transportation of long units may be difficult |
Less C&D waste will be generated. Construction of concrete panels is carried out off-site and potential environmental impact could be minimised |
Steelwork |
Fast construction and suitable for long span structures |
The construction cost is generally more expensive than concrete, in particular for fire resistance and corrosion |
Steel members are fabricated off-site and connected on-site, minimising potential environmental impacts |
In the consideration of alternatives in sequences of works, concurrent construction sequence involves construction activities occurring at the same time. The environmental benefit of this would be the reduction of overall construction period and hence the duration of impact. The magnitude of the overall environmental impact could hence be larger but still within acceptable level as detailed in this EIA report. On the other hand, phased construction sequence involves construction activities being carried out one after another. This would reduce the magnitude of the overall impacts but prolong the construction period.
Redevelopment of the existing theme park areas at TSW into a Water Park in-situ is preferred after consideration of the need of Project and the “without project” scenario (as presented in Section 2.4 and Section 2.6 respectively). It would not require further land acquisition and construction of the associated water and electrical, gas supply, and telecommunication resulting in a much lesser costs and would have less environmental impact on the already developed site. Re-provision in-situ would also have the added benefit of no additional requirements of exploiting other brownfield or greenfield sites which would otherwise have other beneficial societal uses, to serve the same purpose.
As described in Section 2.7, the design concept for blending with the natural environment and optimisation of development option in environmental perspective has been adopted. The preferred scheme (shown in Figure 2.6) is thus the recommended option for the Project as it has minimised, and avoided whenever possible, environmental impacts in its layout and design of structures. The following summarises the key environmental considerations that have been incorporated into the preferred scheme to improve the environmental performance of the Project.
Given that the overall theme of the Project is to combine nature with water elements of the development, the Project has given great consideration in maximum utilisation of existing landscape features, including the topography and geographic location of the site. Key environmental benefits that will be generated from the Project include the following:
§ Development of a Water Park with various landscape and amenity planting which enhance the environmental setting. Landscape and visual enhancement will be achieved via provision of new aesthetic structures that complement the surroundings.
§ Greening and landscape elements will be incorporated at the roofs and platform structures to maximise the planting and landscape area.
As described in Section 2.7, a number of environmental impacts have been avoided or minimised in the preferred scheme. These include the following:
§ The preferred scheme makes good use of the already developed areas and establishes a series of platforms so that large-scale slope excavation for outdoor park and subsequent loss of natural environment is avoided; also vegetation clearance/tree felling and visual impacts are minimised.
§ Minimising footprint on the existing hillside slopes by reducing the amount of structural support required so that ecological impact on natural habitats especially woodland and streams are minimised.
§ Adoption of “terrace” concept to avoid substantial visual impact and minimise incompatibility with the surrounding environment; also to minimise the use of glazing and the potential collision impact on birds.
§ Reprovision of the Flamingo Pond at the southern side of the Project Area which is compatible with natural environment and more suitable for wildlife use.
§ Avoidance of works encroaching onto marine habitat and potential impact on the marine environment and the associated fauna, noticeably hard coral communities.
§ Reuse of spent cooling water for on-site flushing can completely eliminate the need to discharge high temperature and chlorine containing water into the marine environment, and hence minimising impact to the coral communities in the nearby marine environment.
§ Implementing site practices as outlined in ProPECC Note PN 1/94 to control and minimise site runoff and drainage during construction period.
§ Install and maintain roadside gullies and silt traps for removal of pollutants from stormwater during operation.
§ Reuse of inert C&D materials as far as practicable to minimise off-site delivery of surplus inert C&D materials and the associated environmental impacts.
As described
in Section 2.8, a number of
alternative construction methods and sequence of works has been reviewed and
compared prior to recommending the preferred option. Consideration of
environmental impacts during construction stage has been one of the main
factors affecting the choice of construction method and construction sequence.
The recommended option has aimed to provide the optimum balance between
environmental concerns and non-environmental considerations. A summary of the
recommended options for construction methods is presented in Table 2.5.
Table 2.5: Summary of Recommended Option of Construction Methods
Construction Activity |
Recommended Option for Construction Method |
Foundation Works |
Pre-bored rock socket steel H-piles is considered to be preferable as it generates less noise and vibration and impose the least disruption to the terrain. |
Site Formation and Slope Stabilisation |
Earth retaining structures, temporary cut slopes, and excavation lateral support system for pile caps to generate smaller volumes of excavated materials and minimise waste management implications Disposal by trucks instead of barges to avoid impact to marine environment |
Utilities, roadworks and landscaping |
Conventional methods |
Disposal |
Disposal by trucks instead of barges to avoid impact to marine environment |
Superstructure |
Owing to the given constraints, conventional cast in-situ reinforced concrete construction and particularly the flatslab system is preferred to precast concrete. Steelwork would be adopted for long span roof structures. |
For the site formation works, minimisation approach is adopted. As part of the architectural approach, the clearance between the rear of the structure and the cut slope is required to be small. It is therefore proposed to adopt a clearance of only the minimum required for maintenance access and surface drainage provisions which will minimise slope cutting.
For slope works, the slopes formed will be designed to Hong Kong standards using common rock and soil stabilisation methods. Slope angles will be optimised, so as to reduce the extent of cutting into the hillside and minimise the extent of soil nailing. Soil nails will be used to stabilise soil cuts. Soil nails cuts are planned to be at 55° generally, in order to be landscaped to give a green appearance. Where cuts are in competent bedrock, rock cuts may be made up to 85°. Stabilisation works, such as rock dowels, scaling or loose rock, wire mesh and dentition will be required and will be confirmed on site during excavation.
As a result, the construction boundary is
entirely driven by the anticipated extent of the building and associated
structures and associated construction space; the level of the building
relative to the profile of existing slopes; and the anticipated extent of
slope-works (and associated works area).
Regarding works sequence, in considering the environmental benefits and dis-benefits of the two construction sequences, a balance approach is preferred to be adopted to minimise the environmental impacts, maximise the benefits and to meet the target commissioning date. The balance approach will be a combination of concurrent and phased construction sequences at different stages of construction.
The design of the Project has been commenced in the second quarter of year 2013. The earliest advance site work is expected to be physically commenced by the third quarter of year 2014. The tentative programme for operation of the Project will be in 2017. Given the scale of the Project, construction will be implemented according to the general description as shown in Table 2.6.
Table 2.6: Summary of Construction Programme
Item |
Description |
Timeframe |
1 |
EVA, slope stabilisation & site formation works |
Q3 2014-Q2 2015 |
2 |
Foundation |
Q4 2014-Q2 2015 |
3 |
Main building construction |
Q2 2015-Q4 2016 |
4 |
Superstructure |
Q2-Q4 2015 |
5 |
Roof steel erection |
Q4 2015-Q1 2016 |
6 |
Glass curtain wall installation |
Q1-Q3 2016 |
7 |
Water rides installation |
Q1-Q2 2016 |
8 |
Interior fitting out |
Q2 2016-Q1 2017 |
The tentative construction programme is provided in Appendix 2.2. This programme is subject to further changes during the course of the scheme designs. Construction will proceed in the general order of slope stabilisation; site formation; foundation, main building construction; superstructure; roof steel erection; glass curtain wall installation; water rides installation; and interior fitting out.
Consultation / communication with individual Southern District Council (SDC) members has been carried out during the preparation stage of the Project. The SDC members consulted had no objection to the Project. A presentation to the SDC on the key EIA findings has been scheduled on 31st March 2014, during which details of the Project will be shared and discussed with SDC members, with a view to soliciting their support on the Project.
There is no
confirmed project in the vicinity of the Project site. Planned projects in the
vicinity of the Project area include two hotel developments
of the Ocean Park (i.e. Spa Hotel and Fisherman’s Wharf Hotel) in TSW. These two
hotel developments are in a preliminary planning stage and yet to be confirmed,
and no information is currently
available for the construction timetable. Therefore, these two hotel
developments are not considered as concurrent projects when considering
cumulative construction impacts. As both this Project and the two hotels are
under OPC’s control, in case the confirmed construction programme
of the hotel developments become available, the construction programmes
would be scheduled to minimise the possible cumulative construction impact.
Nevertheless, the two hotels have been considered as potential sensitive
receivers in the operation phase air quality, noise and visual impact
assessment (refer to Chapters 3, 5 and 12) and the potential sewage
flows generated from the two hotels have also been taken into account in the
sewerage and sewage impact assessment (refer to Chapter 7)
for the Project.