Content |
Chapter Title Page
1. Introduction 1-1
1.1 Background
of the Project_________________________________________________________ 1-1
1.2 Purpose
of the EIA Report_________________________________________________________ 1-2
1.3 The
Approach__________________________________________________________________ 1-3
1.4 Structure
of the EIA Report________________________________________________________ 1-4
2.1 Location
and Scale of the Project___________________________________________________ 2-1
2.2 Need
for the Project_____________________________________________________________ 2-1
2.2.1 Purpose
and Objective of the Project________________________________________________ 2-1
2.2.2 Environmental
Benefits of the Project________________________________________________ 2-1
2.2.3 Changes
to Relevant Findings in the Original EIA Report_________________________________ 2-2
2.3 Consideration
of “Without Project” Scenario___________________________________________ 2-2
2.4 Consideration
of Ground Decontamination Methods_____________________________________ 2-3
2.4.1 Options
for Ground Decontamination Methods_________________________________________ 2-3
2.4.2 Comparison
of Ground Decontamination Methods______________________________________ 2-8
2.4.3 Preferred
Scenario of Decontamination Methods______________________________________ 2-10
2.4.4 Contingency
Measures__________________________________________________________ 2-10
2.5 Scope
of Work________________________________________________________________ 2-10
2.6 Reprovisioning
Options of Temporary Community Facilities______________________________ 2-12
2.6.1 Reprovisioning
Options__________________________________________________________ 2-12
2.6.2 Reprovisioning
Option A – 13-year Project Duration (Two Stages - Full Reprovisioning)_________ 2-12
2.6.3 Reprovisioning
Option B – 7-year Project Duration (Single Stage – Partial Reprovisioning)_______ 2-13
2.6.4 Reprovisioning
Option C – 4.5-year Project Duration (Single Stage – No Reprovisioning)________ 2-14
2.7 Concurrent
and Interfacing Projects________________________________________________ 2-15
3.1 Introduction____________________________________________________________________ 3-1
3.2 Legislation
and Standards________________________________________________________ 3-1
3.2.1 General_______________________________________________________________________ 3-1
3.2.2 Technical
Memorandum on Environmental Impact Assessment Process_____________________ 3-2
3.2.3 Air
Pollution Control Ordinance_____________________________________________________ 3-2
3.2.4 Air
Pollution Control (Construction Dust) Regulation_____________________________________ 3-2
3.2.5 Guidance
Manual for Use of Risk-based Remediation Goals for Contaminated Land Management_ 3-4
3.2.6 Site
Investigation and Relevant Standards____________________________________________ 3-4
3.3 Project
Site____________________________________________________________________ 3-7
3.3.1 Local
Environment and Site Description______________________________________________ 3-7
3.3.2 Meteorology___________________________________________________________________ 3-8
3.3.3 Background
Air Quality___________________________________________________________ 3-9
3.3.4 Air
and Health Sensitive Receivers_________________________________________________ 3-13
3.3.5 Pollution
Sources and Process Description___________________________________________ 3-17
3.4 Assessment
Methodology________________________________________________________ 3-21
3.4.1 Previous
Studies_______________________________________________________________ 3-21
3.4.2 Model
Description______________________________________________________________ 3-22
3.4.3 Dust
and Heavy Metal Assessment_________________________________________________ 3-23
3.4.4 Hydrocarbon
Assessment________________________________________________________ 3-27
3.4.5 Odour
Assessment_____________________________________________________________ 3-32
3.4.6 Health
Impact Assessment_______________________________________________________ 3-32
3.5 Evaluation
of the Air Quality and Health Impacts_______________________________________ 3-37
3.5.1 Dust________________________________________________________________________ 3-37
3.5.2 Health
assessment_____________________________________________________________ 3-38
3.6 Mitigation
Measures____________________________________________________________ 3-46
3.6.1 Health
and Safety Measures for on-site personnel_____________________________________ 3-46
3.6.2 General
Dust Control Measures___________________________________________________ 3-46
3.6.3 Best
Practices for Dust Control____________________________________________________ 3-47
3.6.4 Solidification
and Biopile Measures________________________________________________ 3-48
3.7 Residual
Impacts______________________________________________________________ 3-49
3.8 Environmental
Monitoring and Audit________________________________________________ 3-49
3.9 Conclusions__________________________________________________________________ 3-49
3.10 References___________________________________________________________________ 3-50
4.1 Introduction____________________________________________________________________ 4-1
4.2 Environmental
Legislation, Standards and Guidelines___________________________________ 4-1
4.2.1 Construction
Noise______________________________________________________________ 4-1
4.3 Study
Area and Sensitive Receivers_________________________________________________ 4-2
4.3.1 Study
Area____________________________________________________________________ 4-2
4.3.2 Description
of the Environment_____________________________________________________ 4-2
4.3.3 Noise
Sensitive Receivers (NSRs)___________________________________________________ 4-3
4.4 Assessment
Methodology_________________________________________________________ 4-4
4.4.1 Construction
Noise______________________________________________________________ 4-4
4.5 Identification
of Potential Noise Impact_______________________________________________ 4-5
4.5.1 Reprovisioning
Options___________________________________________________________ 4-5
4.5.2 Noise
Impact___________________________________________________________________ 4-5
4.5.3 Cumulative
Noise Impact_________________________________________________________ 4-5
4.6 Prediction
and Evaluation of Noise Impact____________________________________________ 4-6
4.6.1 Reprovisioning
Option A__________________________________________________________ 4-6
4.6.2 Reprovisioning
Option B__________________________________________________________ 4-6
4.6.3 Reprovisioning
Option C__________________________________________________________ 4-7
4.7 Mitigation
of Adverse Noise Impact__________________________________________________ 4-7
4.8 Cumulative
Impacts____________________________________________________________ 4-12
4.8.1 Reprovisioning
Option A_________________________________________________________ 4-12
4.8.2 Reprovisioning
Option B_________________________________________________________ 4-13
4.8.3 Reprovisioning
Option C_________________________________________________________ 4-14
4.9 Residual
Impact_______________________________________________________________ 4-15
4.9.1 Reprovisioning
Option A_________________________________________________________ 4-15
4.9.2 Reprovisioning
Option B_________________________________________________________ 4-15
4.9.3 Reprovisioning
Option C_________________________________________________________ 4-15
4.9.4 Summary
of Residual Impact_____________________________________________________ 4-15
4.10 Environmental
Monitoring and Audit________________________________________________ 4-16
4.11 Conclusion___________________________________________________________________ 4-16
5.1 Introduction____________________________________________________________________ 5-1
5.2 Environmental
Legislation, Standards and Guidelines___________________________________ 5-1
5.2.1 Environmental
Impact Assessment Ordinance_________________________________________ 5-1
5.2.2 Water
Pollution Control Ordinance__________________________________________________ 5-1
5.2.3 Technical
Memorandum on Standards for Effluents Discharged into Drainage and Sewerage
Systems, Inland and Coastal Waters_________________________________________________________________ 5-2
5.2.4 Water
Supplies Department (WSD) Water Quality Objective Target Values____________________ 5-4
5.2.5 Practice
Note for Professional Persons on Construction Site Drainage_______________________ 5-4
5.2.6 Criteria
for Dissolved Metals_______________________________________________________ 5-5
5.3 Assessment
Area and Sensitive Receivers____________________________________________ 5-5
5.4 Description
of the Existing Environment/ Background Water Quality_________________________ 5-6
5.4.1 Marine
Water Quality_____________________________________________________________ 5-6
5.4.2 Ground
Water Quality____________________________________________________________ 5-7
5.5 Assessment
Methodology_________________________________________________________ 5-7
5.6 Identification,
Prediction and Evaluation of Environmental Impact__________________________ 5-8
5.6.1 Decontamination
Phase__________________________________________________________ 5-8
5.7 Mitigation
of Adverse Environmental Impact__________________________________________ 5-10
5.7.1 Decontamination
Phase_________________________________________________________ 5-10
5.8 Cumulative
Impact_____________________________________________________________ 5-13
5.9 Evaluation
of Residual Impact_____________________________________________________ 5-14
5.10 Environmental
Monitoring and Audit________________________________________________ 5-14
5.11 Conclusion___________________________________________________________________ 5-14
6.1 Introduction____________________________________________________________________ 6-1
6.2 Environmental
Legislation, Standards and Guidelines___________________________________ 6-1
6.2.1 Waste
Management_____________________________________________________________ 6-1
6.2.2 Construction
and Demolition (C&D) Materials__________________________________________ 6-2
6.3 Assessment
Methodology_________________________________________________________ 6-2
6.3.1 Analysis
of Activities and Waste Generation___________________________________________ 6-2
6.3.2 Proposal
for Waste Management___________________________________________________ 6-3
6.3.3 Excavation,
Filling and Dumping____________________________________________________ 6-3
6.4 Identification,
Prediction and Evaluation of Environmental Impact__________________________ 6-3
6.4.1 Construction
and Demolition (C&D) Materials__________________________________________ 6-4
6.4.1.1 Site Clearance_________________________________________________________________ 6-4
6.4.1.2 Decontamination Phase__________________________________________________________ 6-4
6.4.2 Chemical
Waste________________________________________________________________ 6-4
6.4.3 General
Refuse_________________________________________________________________ 6-5
6.5 Opportunities
for Reducing Waste Generation, Maximise Reuse and Recycling________________ 6-5
6.5.1 Site
Clearance_________________________________________________________________ 6-5
6.5.2 Decontamination
Phase__________________________________________________________ 6-6
6.6 Mitigation
of Adverse Environmental Impacts__________________________________________ 6-7
6.6.1 Good
Site Practices______________________________________________________________ 6-7
6.6.2 Waste
Reduction Measures________________________________________________________ 6-8
6.6.3 C&D
Material__________________________________________________________________ 6-8
6.6.4 Chemical
Waste________________________________________________________________ 6-9
6.6.5 General
Refuse_________________________________________________________________ 6-9
6.7 Impacts
Caused by Handling, Collection and Disposal of C&D Materials_____________________ 6-9
6.8 Waste
Handling Procedures and Disposal Routes______________________________________ 6-9
6.9 Evaluation
of Residual Impacts____________________________________________________ 6-10
6.10 Environmental
Monitoring and Audit________________________________________________ 6-10
6.11 Conclusion___________________________________________________________________ 6-10
7.1 Introduction____________________________________________________________________ 7-1
7.2 Environmental
Legislation, Standards and Guidelines___________________________________ 7-1
7.3 Description
of the Environment / Baseline Conditions____________________________________ 7-2
7.4 Assessment
Methodology_________________________________________________________ 7-3
7.5 Identification
of Potential Environmental Impact________________________________________ 7-4
7.6 Prediction
and Evaluation of Environmental Impact_____________________________________ 7-4
7.7 Decontamination
Methods________________________________________________________ 7-6
7.8 Mitigation
of Adverse Environmental, Health and Safety Impacts___________________________ 7-9
7.8.1 Health
and Safety_______________________________________________________________ 7-9
7.8.2 Environmental________________________________________________________________ 7-10
7.9 Evaluation
of Residual Impact_____________________________________________________ 7-11
7.10 Environmental
Monitoring and Audit________________________________________________ 7-12
7.11 Conclusion___________________________________________________________________ 7-12
8.1 Introduction____________________________________________________________________ 8-1
8.2 Environmental Legislation,
Standards and Guidelines___________________________________ 8-1
8.3 Ecological Baseline Condition_____________________________________________________ 8-1
8.3.1 Habitat and Vegetation___________________________________________________________ 8-1
8.3.2 Fauna________________________________________________________________________ 8-2
8.3.3 Habitat Evaluation_______________________________________________________________ 8-2
8.3.4 Species Evaluation______________________________________________________________ 8-3
8.4 Identification and Evaluation
of Ecological Impact______________________________________ 8-3
8.5 Ecological Precautionary
Measure__________________________________________________ 8-3
8.6 Cumulative Impact______________________________________________________________ 8-4
8.7 Environmental Monitoring and
Audit_________________________________________________ 8-4
8.8 Residual Impact________________________________________________________________ 8-4
8.9 Summary_____________________________________________________________________ 8-5
8.10 References____________________________________________________________________ 8-5
9.1 Introduction____________________________________________________________________ 9-1
9.2 Environmental Legislation,
Standards and Guidelines___________________________________ 9-1
9.3 Fisheries Environment___________________________________________________________ 9-1
9.3.1 Latest status of Capture
Fisheries___________________________________________________ 9-1
9.3.2 Trawling Ban in Hong Kong Waters__________________________________________________ 9-2
9.3.3 Findings from Port Survey 2006 in
the offshore water of Kennedy Town______________________ 9-2
9.4 Identification and Evaluation
of Fisheries Impact_______________________________________ 9-3
9.5 Mitigation of Fisheries Impact______________________________________________________ 9-3
9.6 Cumulative Impact______________________________________________________________ 9-3
9.7 Environmental Monitoring and
Audit_________________________________________________ 9-3
9.8 Residual Impact________________________________________________________________ 9-3
9.9 Summary_____________________________________________________________________ 9-3
10.1 Introduction___________________________________________________________________ 10-1
10.2 Environmental Legislation,
Standards and Guidelines__________________________________ 10-1
10.3 Assessment Area______________________________________________________________ 10-1
10.4 Assessment Methodology________________________________________________________ 10-1
10.4.1 Review of Planning and Development
Control Framework_______________________________ 10-2
10.4.2 Landscape Assessment_________________________________________________________ 10-2
10.4.3 Tree Survey__________________________________________________________________ 10-4
10.4.4 Mitigation Measures____________________________________________________________ 10-4
10.4.5 Residual Impact Assessment_____________________________________________________ 10-5
10.5 Review of Planning and
Development Control Framework_______________________________ 10-5
10.6 Baseline Study________________________________________________________________ 10-8
10.6.1 Existing Landscape Conditions____________________________________________________ 10-8
10.6.2 Tree Survey_________________________________________________________________ 10-10
10.7 Landscape Impact Assessment__________________________________________________ 10-12
10.7.1 Sources of Impact_____________________________________________________________ 10-12
10.7.2 Magnitude of Change__________________________________________________________ 10-12
10.7.3 Unmitigated Landscape Impact__________________________________________________ 10-15
10.7.4 Recommended Mitigation Measures_______________________________________________ 10-15
10.7.5 Mitigated Landscape Impact during
Carrying out of the Project___________________________ 10-16
10.7.6 Mitigated Landscape Impact on Day One
upon Completion of the Project__________________ 10-17
10.7.7 Mitigated Landscape Impact in Year
10 upon Completion of the Project____________________ 10-19
10.7.8 Cumulative Impact____________________________________________________________ 10-22
10.8 Environmental Monitoring and
Audit Requirement____________________________________ 10-22
10.9 Summary___________________________________________________________________ 10-23
10.9.1 Mitigation Measures during Carrying
out of the Project_________________________________ 10-23
10.9.2 Mitigation Measures upon Completion
of the Project__________________________________ 10-23
10.9.3 Landscape Impacts during Carrying
out of the Project_________________________________ 10-23
10.9.4 Landscape Impacts in Day 1 upon
completion of the Project____________________________ 10-23
10.9.5 Landscape Impacts in Year 10
following completion of the Project________________________ 10-24
10.10 Conclusion__________________________________________________________________ 10-24
11.1 General______________________________________________________________________ 11-1
11.2 Air Quality and Health Risk_______________________________________________________ 11-1
11.3 Noise Impact__________________________________________________________________ 11-1
11.4 Water Quality Impact____________________________________________________________ 11-1
11.5 Waste Management Implications__________________________________________________ 11-1
11.6 Land Contamination Impact______________________________________________________ 11-1
11.7 Ecological Impact______________________________________________________________ 11-2
11.8 Fisheries Impact_______________________________________________________________ 11-2
11.9 Landscape Impacts_____________________________________________________________ 11-2
12.1 Introduction___________________________________________________________________ 12-1
12.2 Summary of Environmental
Outcomes______________________________________________ 12-1
12.2.1 Estimated Population Protected from
Various Environmental Impacts______________________ 12-1
12.2.2 Environmentally Sensitive Areas
Protected___________________________________________ 12-2
12.2.3 Environmentally Friendly Options
Considered and Incorporated in the Preferred Option and their benefits 12-2
12.2.4 Environmental Designs Recommended
and Their Benefits______________________________ 12-2
12.2.5 Compensation Areas Included____________________________________________________ 12-3
12.3 Summary of Environmental Impacts________________________________________________ 12-3
12.3.1 Air Quality and Health Impact_____________________________________________________ 12-3
12.3.2 Noise Impact__________________________________________________________________ 12-4
12.3.3 Water Quality Impact____________________________________________________________ 12-4
12.3.4 Waste Management Implications__________________________________________________ 12-4
12.3.5 Land Contamination Impact______________________________________________________ 12-4
12.3.6 Ecological Impact______________________________________________________________ 12-5
12.3.7 Fisheries Impact_______________________________________________________________ 12-5
12.3.8 Landscape Impacts_____________________________________________________________ 12-5
12.4 Summary of Key Environmental Outcomes__________________________________________ 12-6
13.1 General______________________________________________________________________ 13-1
Tables
Table 2.1:__ Estimated
Volumes of Contaminated Soil Requiring Excavation and Decontamination, by
Type___ 2-1 Table 2.2:__ Methods
for Decontamination of Contaminated Soils____________________________________ 2-3 Table 2.3:__ List
of Ground Decontamination Methods for Heavy Metals / Hydrocarbons
Contaminated Soil____ 2-5 Table 2.4:__ Comparison
of Ground Decontamination Methods______________________________________ 2-8 Table 2.5:__ Recommended
Ground Decontamination Methods for Contaminated Soil (Preferred Scenario)__ 2-10 Table 2.6:__ Projected
Volume of Soil Excavated and Decontaminated at the Kennedy Town CDA Site_______ 2-11 Table 2.7:__ Source
of Constituent Soils and Volume of Cement Stabilised Soil for Reprovisioning
Option A (Same for Reprovisioning Options B and C)________________________________________________ 2-13 Table 2.8:__ Assumed
Biopiles Location, Source of Constituent Soils, Area and Volume of Biopiles
for Reprovisioning Option A_________________________________________________________ 2-13 Table 2.9:__ Assumed
Biopiles Location, Source of Constituent Soils, Area and Volume of Biopiles
for Reprovisioning Option B_________________________________________________________ 2-14 Table 2.10:_ Assumed
Biopiles Location, Source of Constituent Soils, Area and Volume of Biopiles
for Reprovisioning Option C_________________________________________________________ 2-14 Table 3.1:__ Hong
Kong Air Quality Objectives___________________________________________________ 3-2 Table 3.2:__ Carcinogenic
risks, acute and chronic non-carcinogenic risks for identified TAPs_______________ 3-5 Table 3.3:__ Annual
average background for particulate matter air pollutant concentrations (Year
2008-2012)__ 3-10 Table 3.4:__ 24-hour
average background and exceedances for particulate matter air pollutant
concentrations (Year 2008-2012)___________________________________________________________________ 3-10 Table 3.5:__ Average
Background Air Pollutant Concentrations for Heavy Metals and Hydrocarbons_________ 3-12 Table 3.6:__ Representative
ASRs Identified for the Assessment____________________________________ 3-13 Table 3.7:__ Key
Dust Emission Factors Adopted in the Assessment_________________________________ 3-25 Table 3.8:__ Average
HM Concentrations of Soil at Different Zones__________________________________ 3-26 Table 3.9:__ Excess
Risk (ER) of short-term mortality and morbidity attributable to an increase
of 10 µg/m3 of air pollutant (95% confidence interval)_________________________________________________ 3-34 Table 3.10:_ Excess
Risk (ER) of long-term mortality attributable to an increase of 10 µg/m3 of
air pollutant (95% confidence interval)____________________________________________________________ 3-34 Table 3.11:_ Summary
of parameters for hospital illnesses health outcome____________________________ 3-35 Table 3.12:_ Summary
of parameters for premature death mortality health outcome_____________________ 3-35 Table 3.13:_ Incremental
Lifetime Cancer risk guidelines__________________________________________ 3-36 Table 3.14:_ Summary
of predicted Cumulative TSP, RSP and FSP Concentrations for All ASRs (Tier 1)______ 3-38 Table 3.15:_ Summary
of incremental change in health risk associated with Kennedy Town CDA.___________ 3-38 Table 3.16:_ Summary
of incremental lifetime cancer risks due to TAPs associated with the Project _________ 3-40 Table 3.17:_ Summary
of cumulative maximum TAP concentrations for non-carcinogenic health risks
associated with the Project________________________________________________________________ 3-42 Table 4.1:__ Noise Standards for Daytime
Construction Activities_____________________________________ 4-1 Table 4.2:__ Representative
Noise Sensitive Receivers Identified for the Assessment_____________________ 4-3 Table 4.3:__ Unmitigated
Construction Airborne Noise Impact of Reprovisioning
Option A__________________ 4-6 Table 4.4:__ Unmitigated
Construction Airborne Noise Impact of Reprovisioning
Option B__________________ 4-6 Table 4.5:__ Unmitigated
Construction Airborne Noise Impact of Reprovisioning
Option C__________________ 4-7 Table 4.6:__ Quieter
PME Recommended for Adoption during the Carrying out of the Project_______________ 4-8 Table 4.7:__ Noise
Mitigation Measures for Certain PME during the Carrying out of the Project______________ 4-9 Table 4.8:__ Mitigated
Construction Airborne Noise Impact of Reprovisioning
Option A___________________ 4-10 Table 4.9:__ Mitigated
Construction Airborne Noise Impact of Reprovisioning
Option B___________________ 4-11 Table 4.10:_ Mitigated
Construction Airborne Noise Impact of Reprovisioning
Option C___________________ 4-12 Table 4.11:_ Cumulative
Construction Airborne Noise Impact of Reprovisioning
Option A_________________ 4-12 Table 4.12:_ Cumulative
Construction Airborne Noise Impact of Reprovisioning
Option B_________________ 4-13 Table 4.13:_ Cumulative
Construction Airborne Noise Impact of Reprovisioning
Option C_________________ 4-14 Table 4.14:_ Evaluation
of Residual Noise Impacts during Construction Phase__________________________ 4-16 Table 5.1:__ Water
Quality Objective for the Victoria Harbour (Phase Three) WCZ________________________ 5-1 Table 5.2:__ Standards
for Effluents Discharged into the Inshore Waters of Victoria Harbour Water
Control Zone 5-3 Table 5.3:__ Standards
for Effluents Discharged into the Marine Waters of Victoria Harbour Water
Control Zone_ 5-3 Table 5.4:__ WSD’s
Water Quality Objective Target Values for Flushing Water at Sea Water Intakes___________ 5-4 Table 5.5: __ Overseas
Water Quality Criteria for Dissolved Metals____________________________________ 5-5 Table 5.6:__ Water
Sensitive Receiver_________________________________________________________ 5-6 Table 5.7:__ Marine
Water Quality in Victoria Harbour Water Control Zone at Selected Stations in
2012________ 5-6 Table 6.1:__ Summary
of Waste Handling Procedures and Disposal Routes___________________________ 6-11 Table 7.1:__ Historical
Land Use in the Study Area________________________________________________ 7-2 Table 7.2:__ Potential
Contamination for Each Section of the Study Area_______________________________ 7-5 Table 7.3:__ Volumes
of Contaminated Soil Requiring Excavation and Decontamination, and of
Concrete Slab Requiring Demolition and Reuse/Disposal____________________________________________ 7-8 Table 8.1:__ Ecological
Evaluation of Developed Area_____________________________________________ 8-2 Table 8.2:__ Ecological
Evaluation of Protected Species___________________________________________ 8-3 Table 10.1:_ Sensitivity
and Magnitude of Change on the Degree of Impact Significance__________________ 10-4 Table 10.2:_ Review
of Existing Planning and Development Control Framework________________________ 10-6 Table 10.3: _ Sensitivity
of LRs and LCA_______________________________________________________ 10-9 Table 10.4:_ Summary
of Tree Survey Recommendations________________________________________ 10-11 Table 10.5: _ Magnitude
of Change of LRs and LCA_____________________________________________ 10-14 Table 10.6: _ Proposed
Mitigation Measures during Carrying out of the Project_________________________ 10-15 Table 10.7:_ Proposed
Mitigation Measures upon Completion of the Project__________________________ 10-15 Table 10.8:
Significance Threshold of Landscape Impacts during Carrying out and
Upon Completion of the Project _____________________________________________________________________________________ 10-21 Table 12.1:_ Summary
of Key Environmental Outcomes for Reprovisioning
Options A, B and C_____________ 12-6 Table 13.1:_ Implementation
Schedule of Mitigation Measures______________________________________ 13-1 Figures Figure 2.1 Location
of the Project Site and Study Area Figure 2.2 Site
Decontamination Zones Figure 2.3a Site
Decontamination Works (Reprovisioning Option A) Figure 2.3b Site
Decontamination Works (Reprovisioning Option B) Figure 2.3c Site
Decontamination Works (Reprovisioning Option C) Figure 2.4 Location
of Planned and Concurrent Works Figure 3.1 Location of Air Sensitive
Receivers and 500 m Assessment Boundary Figure 3.2 Site Decontamination Zones Figure 3.3 Location of Planned and Existing
Concurrent Works Figure 3.4 Location of Potential
Construction Dust Sources in Tier 1 Figure 3.5 Location of Potential Hydrocarbon
Sources in Reprovisioning Option A Figure 3.6 Location of Potential Hydrocarbon
Sources in Reprovisioning Option B Figure 3.7 Location of Potential Hydrocarbon
Sources in Reprovisioning Option C Figure 4.1 Noise Study Area and Locations
of Representative Noise Sensitive Receivers Figure 4.2 Photos of Existing Noise
Sensitive Receivers Figure 4.3 Schematic Configuration of
Movable Noise Barrier for PME Figure 5.2 Water Quality Impact Assessment
Study Area and Water Sensitive Receivers Figure 5.3 Areas on Different Land Use Figure 9.1 Distribution of Adult Fish
Production Figure 9.2 Distribution of Fish Fry
Production Figure 9.3 Overall Distribution of Fishing
Operations Figure 10.1 Assessment
Area for Landscape Impact Assessment Figure 10.2 Zoning
in Outline Zoning Plan within Landscape Assessment Area Figure 10.3 Aerial
View of Landscape Assessment Area Figure 10.4 Locations
of Landscape Resources Figure 10.5 Photos
of Landscape Resources Figure 10.6 Locations of Landscape Character
Areas Figure 10.7 Photos
of Landscape Character Areas Figure 10.8 Proposed
Landscape Mitigation Measures Figure 10.9 Photomontages
of Landscape Assessment Areas Appendices Appendix 1.1 Responses to Public Comments
on Project Profile Appendix 2.1a Tentative Construction
Programme (Reprovisioning Option A) Appendix 2.1b Tentative
Construction Programme (Reprovisioning Option B) Appendix 2.1c Tentative Construction
Programme (Reprovisioning Option C) Appendix 3.1 Biopile Operation Monitoring and Cleanup
Report (8 December 2010 to ,7 January 2011) Appendix 3.2 Not
Used Appendix 3.3 Calculation
of Dust Suppression Efficiency Appendix 3.4a Soil
pollutant Concentrations from Site Investigation Appendix 3.4b Soil
pollutant Concentrations for TPH Indicator Pollutants from Site Investigation Appendix 3.5 Hydrocarbon
Emission Calculations (Working Hours) Appendix 3.6 Hydrocarbon
Emission Calculations (Non-working Hours) Appendix 3.7 Details
of Dust Emission Sources for 1-hour, Daily and Annual Dust Assessment (Tier
1) Appendix 3.8 Tier
1 Data Input Appendix 3.9 Details
of Dust Emission Sources for Annual Dust Assessment (Tier 2) Appendix 3.10 Tier
1 Dust Results (Unmitigated and Mitigated) Appendix 3.11 Heavy
Metal Results (Based on Mitigated RSP) Appendix 3.12 Hydrocarbon Results Appendix 3.13 Health
Impact Assessment Criteria Pollutants Results Appendix 3.14 Health Impact Assessment Non-Criteria
Pollutants Results Appendix 4.1 Unmitigated Construction Plant
Inventory Appendix 4.2 Unmitigated Construction Noise Impact
of Reprovisioning Option A Appendix 4.3 Unmitigated Construction Noise Impact of
Reprovisioning Option B Appendix 4.4 Unmitigated Construction Noise Impact
of Reprovisioning Option C Appendix 4.5 Mitigated Construction Plant Inventory Appendix 4.6 Mitigated Construction Noise Impact of
Reprovisioning Option A Appendix 4.7 Mitigated Construction Noise Impact of
Reprovisioning Option B Appendix 4.8 Mitigated Construction Noise Impact of
Reprovisioning Option C
Appendix 5.2 Calculations for Dissolved Metals Appendix 5.3 Airlifting Wastewater to Wastewater
Treatment Facility Appendix 5.4 Schematic Diagram of Perimeter Cut-off
Drains Appendix 7.1 Contamination
Assessment Plan (CAP) Appendix 7.2 Contamination
Assessment Report / Remediation Action Plan (CAR/RAP) Appendix 8.2 List of Flora
and Fauna recorded within the Project Site Appendix 10.1 Tree
Assessment Schedule Appendix 10.2 Proposed
Planters on Screen Hoarding Appendix 12.1
Summary of Environmental Impacts |
|