Environmental
Impact Assessment Study for Re-provision of Open Cycle Gas Turbines |
|
|
|
EIA REPORT |
|
|
|
TABLE OF CONTENTS |
|
1.
INTRODUCTION 3.
AIR QUALITY 4.
NOISE 6.
WASTE MANAGEMENT IMPLICATIONS 8.
ENVIRONMENTAL MONITORING AND AUDIT 9.
CONCLUSION |
|
|
|
LIST OF FIGURES |
|
Figure 2.1a Location of Gas Turbine
Compound and its Existing Units at Lamma Power Station Figure 2.1b Location of Gas
Turbine Compound and its Proposed New Units at Lamma Power Station Figure 3.1 Representative Air
Sensitive Receivers within the 15km Assessment Area Figure 3.2 Locations of
Emission Sources of Proposed New Units within the Gas Turbine Compound Figure 3.3 Locations of
Emission Sources of Existing Units within the Gas Turbine Compound Figure 3.4a Locations of
Emission Sources within the Gas Turbine Compound (“With Project” Scenario –
Phase 1) Figure 3.4b Locations of Emission
Sources within the Gas Turbine Compound (“With Project” Scenario – Phase 2) Figure 3.4c Locations of
Emission Sources within the Gas Turbine Compound (“With Project” Scenario –
Phase 3) Figure 3.4d Locations of
Emission Sources within the Gas Turbine Compound (“With Project” Scenario –
Phase 4) Figure 4.1 Locations of Noise
Sensitive Receivers Figure 4.2 Section Plan of
Lamma Power Station and NSR N1 Figure 4.3 Baseline Noise
Monitoring Location Figure 5.1 Locations of Water
Sensitive Receivers (WSRs) Figure 7.1 Project Location
Map Figure 7.2 Proposed Sampling
Location |
|
|
|
LIST OF APPENDICES |
|
APPENDIX 3A CALCULATIONS OF LAND
USE PARAMETERS AND LAND USE FIGURES APPENDIX 3B PREDICTED POLLUTANT
CONCENTRATIONS AT AIR SENSITIVE RECEIVERS (COMPARATIVE ASSESSMENT) APPENDIX 4A PHOTOGRAPH OF
REPRESENTATIVE NOISE SENSITIVE RECEIVERS (NSRS) APPENDIX 4B DETAILS OF BACKGROUND
NOISE MEASUREMENT APPENDIX 4C OPERATION PLANT
INVENTORY APPENDIX 4D OPERATIONAL NOISE
IMPACT ASSESSMENT APPENDIX 7A CONTAMINATION
ASSESSMENT PLAN APPENDIX 8A IMPLEMENTATION SCHEDULE
OF RECOMMENDED MITIGATION MEASURES |
|
LIST OF TABLES Table 2.1 Comparison of the Identified Potential Sites for New
OCGTs Table 2.2 Tentative Implementation Programme of the Project Table 3.1 Hong Kong Air Quality Objectives Table 3.2 Identified Representative ASRs Table 3.3 Concentrations of Air pollutants Measured at EPD’s AQMS
within the Assessment Area in the Recent Five Years (2016 to 2020) Table 3.4 Concentrations of Air pollutants Measured at HK
Electric’s AQMS within the Assessment Area in the Recent Three Years (2018 to
2020) Table 3.5 Background Air Pollutant Concentrations Predicted by the
PATH v2.1 Model in 2025 Table 3.6 Modelling Scenarios and Assessment Parameters Table 3.7 Stack Parameters and Emission Information under “Without
Project” Scenario Table 3.8 Stack Parameters and Emission Information under “With
Project” Scenario Table 3.9 AERMET/ AERMOD Model Input Parameters and Assumptions Table 3.10 Conversion Factors from 1-hour to 10-minutes Mean
Concentrations Table 3.11 Difference in Predicted Impacts between “Without Project”
Scenario and “With Project” Scenario (Phase 1) at the Identified ASRs Table 3.12 Difference in Predicted Impacts between “Without Project”
Scenario and “With Project” Scenario (Phase 2) at the Identified ASRs Table 3.13 Difference in Predicted Impacts between “Without Project”
Scenario and “With Project” Scenario (Phase 3) at the Identified ASRs Table 3.14 Difference in Predicted Impacts between “Without Project”
Scenario and “With Project” Scenario (Phase 4) at the Identified ASRs Table 4.1 EIAO-TM Daytime Construction Noise Standards (Leq, 30
min dB(A)) Table 4.2 Area Sensitivity Ratings (ASRs) Table 4.3 Acceptable Noise Levels for General Construction Works Table 4.4 Acceptable Noise Levels for Operational Noise Table 4.5 Identified Representative NSRs Table 4.6 Measured Prevailing Background Noise Levels Table 4.7 Predicted Noise Level at the Representative NSR N2 Table 5.1 Summary of Water Quality Objectives for Southern WCZ Table 5.2 Summary of EPD Routine Water Quality Monitoring Data
from Selected Stations of the Southern WCZ in 1986-2019 Table 5.3 Water Sensitive Receivers in the Vicinity of the Project Table 6.1 Government Waste Disposal Facilities for Construction
Waste Table 6.2 Summary of Estimated Waste Arisings and Recommended Waste
Management Arrangements Table 7.1 Summary of Historical Land Uses of Project Site Table 7.2 Summary of Current Land Uses of Project Site Table 7.3 Summary of SI Plan Table 9.1 Summary of Environmental Assessment and Outcomes – Air
Quality Table 9.2 Summary of Environmental Assessment and Outcomes – Noise Table 9.3 Summary of Environmental Assessment and Outcomes – Water
Quality Table 9.4 Summary of Environmental Assessment and Outcomes – Waste Table 9.5 Summary of Environmental Assessment and Outcomes – Land
Contamination |