In general, application involving diesel, pneumatic and / or stream hammer would not be accepted unless the construction site is situated in Designated Geologically Difficult Areas as specified in the Technical Memorandum.">
2. ">
Pile driving using excavator-mounted breaker is a kind of percussive piling and requires a permit.">