Waste Management

Construction Waste

Common Problems Relevant Environmental Control
Waste generation Waste Disposal (Charges for Disposal of Construction Waste) Regulation requires construction contractor to open a billing account for disposal of construction waste.

Practical Solutions

  • Open a billing account under the Waste Disposal (Charges for Disposal of Construction Waste) Regulation
  • Designate on site waste sorting area to facilitate waste segregation
  • Allocate different containers for temporary storage of segregated waste materials to facilitate reuse, recycle and disposal
  • Reuse and/or dispose of segregated waste materials timely to avoid overstock which may contribute other nuisance
  • Implement trip ticket system to track the offsite transportation of segregated waste materials

 

On site waste sorting area for temporary storage of segregated waste material for further reuse / disposal
 
On site waste sorting area for temporary storage of segregated waste material for further reuse/disposal
 
Covered metal bin for temporary storage of segregated waste materials
 
Covered metal bin for temporary storage of segregated waste materials
 
3-color recycle bin for collection of recyclable municipal waste
 
3-color recycle bins for collection of recyclable municipal waste

 

Chemical Waste

Common Problems Relevant Environmental Control
Waste generation Waste Disposal (Chemical Waste) (General) Regulation requires the chemical waste producer to register with the EPD and properly package, label and store the chemical wastes.

Practical Solutions

 

Chemical waste store for temporary storage of chemical wastes
 
Chemical waste store for temporary storage of chemical wastes
 
Drip tray with oil absorbent for fuel drum
 
Drip tray with oil absorbent for fuel drum

 

Back to top