Application No. |
Environmental Impact Assessment Report |
Applicant |
Status |
EIA-249/2016 |
A Rooftop Helipad at the Proposed New Block of Queen Mary Hospital |
Food and Health Bureau |
- Applicant was informed on 18 Jan 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Feb 2017 to 4 Mar 2017.
Approved without conditions on 22 Mar 2017. |
EIA-221/2014 |
Tai Shue Wan Development at Ocean Park |
Ocean Park Corporation |
|
EIA-199/2011 |
Shatin to Central Link - Hung Hom to Admiralty Section |
MTR Corporation Limited |
|
EIA-185/2010 |
South Island Line (East) |
MTR Corporation Limited |
- Applicant was informed on 4 Aug 2010 of the suitability of the report for public inspection.
|
EIA-179/2010 |
South Island Line (East) |
MTR Corporation Limited |
- Application was withdrawn by applicant on 25 Feb 2010.
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A |
Drainage Services Department |
- Applicant was informed on 18 Jun 2008 of the suitability of the report for public inspection.
- Report is exhibited for public to comment from 12 Aug 2008 to 10 Sep 2008.
- Approved without conditions on 30 Oct 2008.
|
EIA-121/2006 |
Repositioning and Long Term Operation Plan of Ocean Park |
Ocean Park Corporation
|
- Applicant was informed on 29 May 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 1 Jun 2006 to 30 Jun 2006.
- Approved without conditions on 12
Jul 2006. |
EIA-115/2005 |
Drainage Improvement in Northern Hong Kong Island - Hong Kong West Drainage Tunnel |
Drainage Services Department
|
- Applicant was informed on 26 Jan 2006 of the suitability of the report for public inspection.
-Report was exhibited for the public to comment from 13 Feb 2006 to 14 Mar 2006.
- Approved without conditions on 7 Apr 2006. |
EIA-099/2004 |
Renewable Energy by a Wind Turbine System on Lamma Island |
The Hongkong Electric Co. Ltd. |
- Applicant was informed on 6 Sep 2004 of the suitability of the report for public inspection..
- Report was exhibited for public to comment from 10 Sept 2004 to 09 Oct 2004.
- Approved without conditions on 27 Oct 2004. |
EIA-047/2000 |
Proposed RMC concrete batching plant at Telegraph Bay for Cyberport Development |
Cyber-Port Limited |
- Applicant was informed on 21 Oct 2001 of the suitability of the report for public inspection.
-Report is exhibited for the public to comment from 14 Nov 2000 to 13 Dec 2000
- Approved with conditions on 15 Jan 2001. |
EIA-011/1999 |
Infrastructural Works for the Proposed Development at Telegraph Bay - Engineering Feasibility Study |
Information Technology and Broadcasting Bureau of the Government for the Hong Kong Special Administrative Region Department |
- Applicant was informed on 09 Mar 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 12 Mar 1999 to 10 Apr 1999.
- Approved with conditions on 26 Apr 1999. |
EIA-007/1998 |
Footbridge and Improvement to Ap Lei Chau Bridge Road and Ap Lei Chau Drive |
Highways Department |
- Applicant was informed on 04 Jan 1998 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 08 Jan 1999 to 06 Feb 1999.
- Approved with conditions on 24 Feb 1999 |