Condition No.
|
Document Title
|
2.42 |
Baseline Monitoring Report (Part 14)
|
2.43 |
Monthly EM&A Report (Jan 2011)
|
2.42 |
Landscape Plan for To Kau Wan Words Area
|
2.46 |
Monthly EM&A Report (Feb 2011)
|
2.21 |
Supplementary Contamination Assessment Report and Remediation Action Plan for Kwai Chung Ventilation Buliding Works Area (Site H)
|
2.45 |
Baseline Monitoring Report (Part 13) (Rev.2)
|
2.46 |
Monthly EM&A Report (Mar 2011)
|
2.46 |
Monthly EM&A Report (Apr 2011)
|
2.11 |
Contingency Plan for Groundwater Level (Contract 825 - Mai Po to Ngau Tam Mei Tunnels (Rev. 2))
|
2.46 |
Monthly EM&A Report (May 2011)
|
2.46 |
Monthly EM&A Report (Jun 2011)
|
2.11 |
Groundwater Monitoring and Contingency Plan for South Section of Approach Tunnel (Contract 811B) (Revision C)
|
2.11 |
Groundwater Monitoring and Contiengency Plan for North Section of Approach Tunnel (Contract 811A)
|
2.11 |
Contingency Plan for Groundwater Drawdown for Shek Yam to Mei Lai Road Tunnels (Contract 821)
|
2.11 |
Contingency Plan for Groundwater Level (Contract 822 - Tse Uk Tsuen to Shek Yam Tunnels)
|
2.21 |
Revised Contamination Assessment Plan for Shek Kong Stabling Sidings (SSS) Works Area I (Revision C)
|
2.46 |
Monthly EM&A Report (Jul 2011)
|
2.12(i) |
Ecological Habitat Management Plan (Ver.2)
|
2.11 |
Groundwater Monitoring and Contingency Action Plan (Contract No. 810B - West Kowloon Terminus Station South) (Revised)
|
2.46 |
Monthly EM&A Report (Aug 2011)
|
2.21 |
Remediation Report for Kwai Chung Ventilation Building Works Area (Site H)
|
2.11 |
Contingency Plan for Groundwater Drawdown for Mei Lai Road to Hoi Ting Road Tunnels
|
2.46 |
Monthly EM&A Report (Sep 2011)
|
|
Contamination Assessment Report for SK Stabling Sidings
|