Condition No. |
Document Title |
2.11 |
Landscape and Visual Mitigation Proposal for the Fresh Water Trunk Feed System of the
Desalination Plant at Tseung Kwan O (Issue 2) |
3.5 |
Monthly EM&A Report No.51 (May 2024)
|
3.5 |
Monthly EM&A Report No.52 (Jun 2024)
|
2.23 |
As-Built Drawings on Landscape and Visual Mitigation Measures
|
3.5 |
Quarterly EM&A Report No.17 (Mar 2024 to May 2024)
|
|
Supplementary Environmental Monitoring and Audit Manual
|
3.5 |
Operation Phase Monthly EM&A Report No.1 (Jul 2024)
|
3.5 |
Monthly EM&A Report No.53 (Jul 2024)
|
2.12 |
Audit Report on Measures for Mitigating Hazard to Life (Issue 2)
|
3.5 |
Operation Phase Monthly EM&A Report No.2 (Aug 2024)
|
3.5 |
Monthly EM&A Report No.54 (Aug 2024)
|
3.5 |
Operation Phase Monthly EM&A Report No.3 (Sep 2024)
|
3.5 |
Monthly EM&A Report No.55 (Sep 2024)
|
3.5 |
Quarterly EM&A Report No.18 (Jun 2024 to Aug 2024)
|