TABLE OF CONTENTS
Background
Project Organisation
Construction Works
undertaken during the Reporting Month
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Locations
Monitoring Methodology
Results and Observations
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters,
Frequency and Duration
Monitoring Locations
Monitoring Methodology
Laboratory Analysis
QA/QC Procedure
Results and Observations
Landscape and Visual Audit
Waste Generation Schedule
Site Environmental Audit
Review of Environmental
Monitoring Procedures
Status
of Environmental Licensing and permitting
Implementation Status of
Environmental Mitigation Measures
Implementation Status of Event and Action Plans
Implementation Status of
Environmental Complaint Handling Procedures
Key Issues for the Coming
Month
Environmental Monitoring
Program for the Next Three Months
8. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table
2.1 TSP Monitoring Equipment
Table 2.2 Air Quality Monitoring
Parameters and Frequency
Table 3.1 Water Quality Monitoring
Equipment
Table 3.2 Water Quality Monitoring
Parameters and Frequency
Table 3.3 Analytical Methods to be
applied to Water Quality Samples
Table 3.4 Water Quality Exceedance
Summary
Table 5.1 Actual Amounts of Waste
Generated in August 2006
Table 6.1 Summary of Environmental
Notification, Licensing and Permit Status
List of Figures
Figure 1.1 Project Organisation
Figure 1.2 Layout of Work Site
Figure 2.1 Location of Air Quality Monitoring
Station
Figure 3.1 Locations of Water Quality Monitoring
Stations
List of Appendices
Appendix A Action and Limit Levels
Appendix B Environmental Monitoring Schedule
Appendix C Air Quality Monitoring Results
Appendix D Meteorological Data
Appendix E Water Quality Monitoring Results
(Graphs: DOSM, DOB, Turbidity, SS)
Appendix F QA/QC Procedures and Results
Appendix G Summary of Calibration Status
Appendix H Site Inspection Records
Appendix I Event and Action Plan
Appendix J Complaint Flow Diagram and Complaint Log
Appendix K Contact of Key Environmental Personnel