TABLE OF
CONTENTS
Background
Scope of
Report
Summary of
Construction Works
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameter, Frequency and Schedule
Monitoring
Locations
Monitoring
Methodology
Calibration
Details
Results and
Observations
3. ENVIRONMENTAL SITE INSPECTION
Site
Inspections
Review of Environmental
Monitoring Procedures
Assessment
of Environmental Monitoring Results
Advice on
the Solid and Liquid Waste Management Status
Environmental
Licences and Permits
Implementation
Status of Environmental Mitigation Measures
Summary of Exceedances
of the Environmental Quality Performance Limit
Summary of
Complaints, Notifications of Summons and Successful Prosecutions
Construction
Programme for the Coming Months
Key Issues
for Coming Month
Monitoring
Schedule for the Coming Months
5. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table 1.1 Contact Information of Key Personnel
Table 2.1 Air Quality Monitoring Equipment
Table 2.2 Frequency of Air Quality Monitoring
Table 2.3 Air Quality Monitoring Stations
Table 2.4 Summary of 1-hr TSP Monitoring Results
Table 2.5 Summary of 24-hr TSP Monitoring Results
Table 3.1 Actual Amounts of Waste Generated in April 2006
Table 3.2 Summary of Environmental Licensing and Permit Status
Table 3.3 Summary of Environmental Complaints and Prosecutions
List of Figures
Figure 1.1 General Site Layout for TKO Area 137
Figure 2.1 Air Quality Environmental Monitoring
Stations for TKO Area 137
Appendices
Appendix A Project Organization Chart
Appendix B Construction Programme
Appendix C Action and Limit Levels for Air Quality
Appendix D Monitoring Schedule for April 2006
Appendix E Calibration Certificates
Appendix F Air Quality Monitoring Results and
Graphical Presentation
Appendix H ET’s Site Inspection Summary
Appendix I Implementation Schedule of Mitigation
Measures (EMIS)
Appendix K Interim Notifications of Environmental
Quality Exceedances
Appendix L Tentative Schedule for May 2006