TABLE OF
CONTENTS
Scope of
Report
Construction
Programme
2. ENVIRONMENTAL
MONITORING AND AUDIT REQUIREMENTS
Monitoring Parameters
Environmental Quality Perfomance Limits (Action/Limit Levels)
Environmental Mitigation Measures
Air Quality
Environmental Site Inspection
Advice on Solid and Liquid Waste Management Status
4. SUMMARY
OF NON-COMPLIANCE (EXCEEDANCES) OF ENVIRONMENTAL QUALITY
Summary of Exceedances and Review of the Reasons for non-compliance
5. ENVIRONMENTAL
COMPLAINTS, NOTIFICATION OF SUMMONS AND SUCCESSFUL PROSECUTION
6. COMMENTS, RECOMMENDATIONS AND
CONCLUSIONS
Comments on Mitigation Measures
Recommendations on EM&A Programme
Conclusion
List of Tables
Table 1.1 Contact Information of
Key Personnel
Table 3.1 Summary of Number of
Exceedances for 1-hr & 24-hr TSP Concentration
Table 5.1 Summary of
Environmental Complaints and Prosecutions
List of Figures
Figure 1.1 General Site Layout for TKO Area 137
Figure 2.1 Air Quality Environmental Monitoring
Stations for TKO Area 137
Appendices
Appendix A Project Organization Chart
Appendix B Construction Programme
Appendix C Action and Limit Levels for Air Quality
Appendix D Implementation Schedule of Mitigation
Measures (EMIS)
Appendix E Graphical Presentation of Air Quality
Monitoring Results