TABLE OF
CONTENTS
Background
Scope of
Report
Project
Organization
Summary of
Construction Works
Summary of
EM&A Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameter, Frequency and Schedule
Monitoring
Locations
Monitoring
Methodology
Calibration
Details
Results and
Observations
3. ENVIRONMENTAL
SITE INSPECTION
Site
Inspections
Review of Environmental
Monitoring Procedures
Assessment
of Environmental Monitoring Results
Advice on
the Solid and Liquid Waste Management Status
Environmental
Licences and Permits
Implementation
Status of Environmental Mitigation Measures
Summary of
Exceedances of the Environmental Quality Performance Limit
Summary of
Complaints, Notifications of Summons and Successful Prosecutions
Construction
Programme for the Coming Months
Key Issues
for Coming Month
Monitoring Schedule
for the Coming Months
5. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List of Tables
Table 1.1 Contact Information of
Key Personnel
Table 2.1 Air Quality Monitoring
Equipment
Table 2.2 Frequency of Air
Quality Monitoring
Table 2.3 Air Quality Monitoring
Stations
Table 2.4 Summary of 1-hr TSP
Monitoring Results
Table 2.5 Summary of 24-hr TSP
Monitoring Results
Table 3.1 Actual Amounts of Waste Generated in October 2007
Table 3.2 Summary of
Environmental Licensing and Permit Status
Table 3.3 Summary of
Environmental Complaints and Prosecutions
List of Figures
Figure 1.1 General
Site Layout for TKO Area 137
Figure 2.1 Air
Quality Environmental Monitoring Station for TKO Area 137
Appendices
Appendix A Project
Organization Chart
Appendix B Construction
Programme
Appendix C Action and
Limit Levels for Air Quality
Appendix D Monitoring
Schedule for October 2007
Appendix E Calibration
Certificates
Appendix F Air Quality
Monitoring Results and Graphical Presentation
Appendix H ET’s Site Inspection Summary
Appendix I Implementation
Schedule of Mitigation Measures (EMIS)
Appendix L Tentative
Schedule for November 2007
Appendix M Cumulative
Statistics on Complaints