Highways Department Major Works Project Management Office |
Agreement No. CE 88/98
Improvement to Castle Peak
Road
between Ka Loon Tsuen and Siu
Lam
Investigation Assignment
ENVIRONMENTAL MONITORING AND
AUDIT MANUAL
August 2001
Maunsell Consultants Asia Ltd.
in association with
Maunsell Environmental Management Consultants Ltd.
Design Research Unit HK Ltd.
TABLE OF CONTENT
Purpose of the Manual
Background
Environmental Monitoring
and Audit Requirements
Project Organization
Construction Dust
Air Quality Parameters
Monitoring Equipment
Laboratory Measurement /
Analysis
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
for Air Quality
Mitigation Measures
Construction Noise
Operational Noise
Introduction
Water Quality Parameter
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Post-construction Monitoring
Environmental Quality
Performance Limits
Water Quality Mitigation
Measures
Operation Phase
Introduction
Mitigation Measures
Site Inspection
6. TERRESTRIAL AND MARINE ECOLOGY
Terrestrial Ecology
Marine Ecology
Fisheries
Site Inspection
Introduction
General
Mitigation Measures
Site Inspections
Compliance with Legal
and Contractual Requirements
Environmental Complaints
General
Baseline Monitoring
Report
EM&A Reports
Data Keeping
Interim Notifications of
Environmental Quality Limit Exceedances
Table 2.1 Proposed Air Quality Monitoring Stations During the Main
Construction Works and Advance Works
Table 2.2 Action and Limit Levels for Air Quality
Table 2.3 Event/Action Plan for Air Quality
Table 3.1 Proposed Construction Noise Monitoring Station
Table 3.2 Action/Limit Levels for Construction Noise
Table 3.3 Event/ Action Plan for Construction Noise
Table 3.4 Proposed Operation Noise Monitoring Station
Table 3.5 Action/Limit Levels for Operation Noise
Table 3.6 Event/Action Plan for Operation Noise
Table 4.1 Proposed
Marine Water Quality Monitoring Stations
Table 4.2 Action and Limit Levels for Marine Water Quality
Table 4.3 Event and Action Plan for Marine Water
Quality
Figure 1.1 General Layout of the Project
Figure 1.2
Preliminary Construction Programme
Figure 1.3 Project Organisation
Figure 2.1 Location of Air Quality Monitoring
Stations During Construction Phase
Figure 3.1 Location of Constriction Noise Monitoring
Stations
Figure 3.2 Location of Operation Noise Monitoring
Stations
Figure 4.1 Water Quality Monitoring Stations
Appendix 1 Environmental Sensitive Receivers
Appendix 2 Implementation
Schedule of Mitigation Measures and Key EM&A Requirements
Appendix 3 TSP Monitoring Data Sheet
Appendix 4 Construction Noise Monitoring Field Record
Sheet
Appendix 5 Operational Noise Monitoring Field Record
Sheet
Appendix 6 Water Quality Monitoring Data Record
Sheet
Appendix 7 Implementation Status Proforma
Appendix 8 Site Inspection Proforma
Appendix 9 Regulatory Compliance Proforma
Appendix 11 Proactive Environmental Protection Proforma
Appendix 12 Incident Report on Action Level or Limit
Level Non-Compliances