TABLE OF CONTENTS

Page

 

1.          INTRODUCTION.................................................................................................................. 1-1

1.1   Project ...................................................................................................................................... 1-1       

1.2   Objectives of EIA Study............................................................................................................ 1-1

1.3   Consideration of Environmental Impact Assessment Ordinance................................................... 1-2

1.4   EIA Study Area......................................................................................................................... 1-2

1.5   Structure of the EIA Report........................................................................................................ 1-3

 

2.          PROJECT DESCRIPTION.................................................................................................... 2-1

2.1   Project Location........................................................................................................................ 2-1

2.2   Project Requirement and Scope................................................................................................. 2-1

2.3   Water Treatment Process for Siu Ho Wan WTW Extension........................................................ 2-2

2.4   Alternative Site for Siu Ho Wan Raw Water Booster Pumping Station......................................... 2-2

2.5   Alternative Alignments for Duplication Pipeline at Pui O.............................................................. 2-5

2.6   Proposed Water Treatment Process............................................................................................ 2-6

2.7   Project Programme.................................................................................................................... 2-9

2.8   Interaction with Other Projects................................................................................................... 2-9

 

3.          AIR QUALITY IMPACT........................................................................................................ 3-1

3.1   Introduction............................................................................................................................... 3-1

3.2   Environmental Legislation and Standards..................................................................................... 3-1

3.3   Description of the Environment................................................................................................... 3-2

3.4   Air Sensitive Receivers............................................................................................................... 3-2

3.5   Assessment Methodology........................................................................................................... 3-3

3.6   Identification of Environmental Impacts....................................................................................... 3-5

3.7   Prediction and Evaluation of Environmental Impacts ................................................................... 3-5

3.8   Mitigation of Adverse Environmental Impacts.............................................................................. 3-6

3.9   Evaluation of Residual Impacts................................................................................................... 3-7

3.10 Environmental Monitoring and Audit........................................................................................... 3-7

 

4.          NOISE IMPACT..................................................................................................................... 4-1

4.1   Introduction............................................................................................................................... 4-1

4.2   Environmental Legislation, Policies, Plans, Standards and Criteria................................................ 4-1

4.3   Description of the Environment................................................................................................... 4-4

4.4   Noise Sensitive Receivers........................................................................................................... 4-5

4.5   Assessment Methodology........................................................................................................... 4-6

4.6   Identification of Environmental Impacts....................................................................................... 4-7

4.7   Prediction and Evaluation of Environmental Impacts.................................................................... 4-8

4.8   Mitigation of Adverse Environmental Impacts............................................................................ 4-10

4.9   Evaluation of Residual Impacts................................................................................................. 4-12

4.10 Environmental Monitoring and Audit......................................................................................... 4-13

 

5.          WATER QUALITY IMPACT................................................................................................. 5-1

5.1   Introduction............................................................................................................................... 5-1

5.2   Environmental Legislation and Standards..................................................................................... 5-1

5.3   Baseline Conditions.................................................................................................................... 5-6

5.4   Water Sensitive Receivers.......................................................................................................... 5-6

5.5   Assessment Methodology........................................................................................................... 5-7

5.6   Identification and Initial Evaluation of Environmental Impacts....................................................... 5-7

5.7   Mitigation Measures................................................................................................................... 5-9

5.8   Environmental Monitoring and Audit......................................................................................... 5-10

5.9   Residual Environmental Impacts................................................................................................ 5-10

 

6.          ECOLOGICAL IMPACT.................................................................................................6-1

6.1   Introduction............................................................................................................................... 6-1

6.2   Environmental Legislation and Standards..................................................................................... 6-1

6.3   Assessment Methodology & Criteria.......................................................................................... 6-2

6.4   Baseline Condition..................................................................................................................... 6-4

6.5   Ecological Value....................................................................................................................... 6-11

6.6   Identification of Environmental Impacts..................................................................................... 6-15

6.7   Evaluation of Impacts............................................................................................................... 6-17

6.8   Cumulative Impacts.................................................................................................................. 6-22

6.9   Mitigation of Adverse Environmental Impacts............................................................................ 6-22

6.10 Residual Environmental Impacts................................................................................................ 6-23

6.11 Environmental Monitoring and Auditing Requirements............................................................... 6-23

6.12 References............................................................................................................................... 6-24

 

7.          LANDSCAPE AND VISUAL IMPACT................................................................................ 7-1

7.1   Introduction............................................................................................................................... 7-1

7.2      Project Description.................................................................................................................... 7-1

7.3      Review of Planning and Development Control Framework.......................................................... 7-2

7.4   Environmental Legislation and Standards..................................................................................... 7-3

7.5   Assessment Methodology........................................................................................................... 7-3

7.6   Baseline Study......................................................................................................................... 7-10

7.7   Landscape Impact Assessment (LIA)....................................................................................... 7-17

7.8      Visual Impact Assessment (VIA).............................................................................................. 7-26

7.9      Landscape and Visual Impact Mitigation Measures................................................................... 7-33

7.10  Residual Landscape and Visual Impacts.................................................................................... 7-36

7.11  Funding, Implementation, Management and Maintenance.......................................................... 7-42

 

8.          IMPACT ON CULTURAL HERITAGE................................................................................ 8-1

8.1   Introduction............................................................................................................................... 8-1

8.2   Environmental Legislation and Standards..................................................................................... 8-1

8.3   Description of the Environment................................................................................................... 8-2

8.4   Assessment Methodology........................................................................................................... 8-2

8.5   Results of the Desk-Based Study................................................................................................ 8-4

8.6   Results of Field Evaluation.......................................................................................................... 8-6

8.7   Impact Assessment.................................................................................................................... 8-8

8.8   Evaluation of Impacts: Operation Phase.................................................................................... 8-11

8.9   Mitigation Measures................................................................................................................. 8-16

8.10 Residual Environmental Impact................................................................................................. 8-17

8.11 Environmental Monitoring and Audit Requirements.................................................................... 8-17

 

9.          HAZARD TO LIFE................................................................................................................. 9-1

9.1   Introduction............................................................................................................................... 9-1

9.2      Rationale of HAZOP Study........................................................................................................ 9-1

9.3      Risk Guidelines.......................................................................................................................... 9-2

9.4      Approach of HAZOP Study....................................................................................................... 9-3

9.5      Description of Site Conditions and Possible Construction Activities............................................. 9-4

9.6      HAZOP Study......................................................................................................................... 9-11

9.7      Findings and Recommendations................................................................................................ 9-12

 

10.      WASTE MANAGEMENT IMPLICATIONS..................................................................... 10-1

10.1 Introduction............................................................................................................................. 10-1

10.2 Environmental Legislation and Standards................................................................................... 10-1

10.3 Assessment Methodology and Criteria...................................................................................... 10-3

10.4 Identification and Evaluation of Environmental Impact................................................................ 10-3

10.5 Mitigation Measures................................................................................................................. 10-6

10.6 Evaluation of Residual Impacts................................................................................................. 10-8

10.7 Environmental Audit................................................................................................................. 10-8

 

11.      ENVIRONMENTAL MONITORING AND AUDIT......................................................... 11-1

11.1 Introduction.............................................................................................................................. 11-1

11.2 Air Quality Impact.................................................................................................................... 11-1

11.3 Noise Impact........................................................................................................................... 11-2

11.4 Water Quality Impact............................................................................................................... 11-2

11.5 Ecology.................................................................................................................................... 11-3

11.6 Landscape and Visual Impact................................................................................................... 11-3

11.7 Cultural and Heritage................................................................................................................ 11-4

11.8 Waste Management.................................................................................................................. 11-4

 

12.      CONCLUSION..................................................................................................................... 12-1

12.1 Introduction............................................................................................................................. 12-1

12.2 Air Quality Impact.................................................................................................................... 12-1

12.3 Noise Impact........................................................................................................................... 12-1

12.4 Water Quality Impact............................................................................................................... 12-1

12.5 Ecology................................................................................................................................... 12-2

12.6 Landscape and Visual Impact................................................................................................... 12-2

12.7 Cultural Heritage...................................................................................................................... 12-3

12.8 Hazard to Life.......................................................................................................................... 12-3

12.9 Waste Management.................................................................................................................. 12-3

12.10 Environmental Monitoring and Audit....................................................................................... 12-4

12.11 Overall Conclusion................................................................................................................. 12-4

 

13.      IMPLEMENTATION SCHEDULE..................................................................................... 13-1

 

 

List of Tables

 

Table 2.1....... Engineering Considerations of Siu Ho Wan Raw Water Booster Pumping Station Alternative Site Options    2-3

Table 2.2....... Environmental Considerations of Siu Ho Wan Raw Water Booster Pumping Station Alternative Site Options        2-4

Table 2.3....... Environmental Considerations of Alternative Raw Water Main Alignments at Pui O........ 2-5

Table 2.4....... Changes of Water Treatment Process for Extended Siu Ho Wan WTW......................... 2-6

Table 2.5        Benefits and Potential Disadvantages of the Proposed Water Treatment Process for Manganese Removal     2-7

Table 2.6        Benefits and Potential Disadvantages of the Proposed Water Treatment Process for Primary Disinfection      2-7

Table 2.7 ...... Hazardous Properties of Chlorine, Ozone and Potassium Permanganate........................ 2-8

 

Table 3.1....... Hong Kong Air Quality Objectives............................................................................... 3-1

Table 3.2....... Summary of Representative Air Sensitive Receivers...................................................... 3-2

Table 3.3....... Emission Factors for Dusty Construction Activities........................................................ 3-3

Table 3.4....... Predicted TSP Concentration at the Representative ASRs at 1.5m above Ground Level 3-6

 

Table 4.1....... Area Sensitivity Ratings................................................................................................ 4-2

Table 4.2....... Construction Noise Criteria for Activity other than Percussive Piling.............................. 4-2

Table 4.3....... Acceptable Noise Levels (ANLs) (dB(A))................................................................... 4-3

Table 4.4....... Noise Criteria for Operation Noise Impact due to New Proposed Equipment................ 4-4

Table 4.5....... Representative Noise Sensitive Receivers..................................................................... 4-5

Table 4.6....... Predicted Construction Noise Levels– Unmitigated Scenario ........................................ 4-8

Table 4.7....... Predicted Unmitigated Operation Noise Levels from Pui O Raw Water Pumping Station & Pui O No. 2 Raw Water Pumping Station   4-10

Table 4.8....... Predicted Construction Noise Levels – Mitigated Scenario ......................................... 4-11

Table 4.9....... Predicted Mitigated Operation Noise Levels from Pui O Raw Water Pumping Station & Pui O No.2 Raw Water Pumping Station       4-12

 

Table 5.1....... Water Quality Objectives for North Western Water Control Zone................................. 5-2

Table 5.2....... Water Quality Objectives for Southern Water Control Zone.......................................... 5-4

 

Table 6.1a .... Ecological Value of Woodland and Abandoned Agricultural Land Habitat.................... 6-11

Table 6.1b .... Ecological Value of Tall Shrubland Grassland/Shrubland Mixture Habitat..................... 6-12

Table 6.1c .... Ecological Value of Streams and Plantation Habitat..................................................... 6-12

Table 6.1d .... Ecological Value of Active Agricultural Land, Village/Developed Area, Wasteland/Abandoned Area and Backshore Vegetation Habitat.................................................................................................................................. 6-13

Table 6.1e .... Ecological Value of Mangrove/Mudflat and Sandy/Rocky Shore Habitat...................... 6-13

Table 6.2 ...... Species of Conservation Interest Recorded in the Assessment Area............................ 6-15

Table 6.3....... Habitats Directly Affected by the Laying of Raw Water Mains at Pui O....................... 6-16

Table 6.4a..... Overall Impact Evaluation of Woodland and Abandoned Agricultural Land Habitat...... 6-17

Table 6.4b..... Overall Impact Evaluation of Tall Shrubland Grassland/Shrubland Mixture Habitat....... 6-18

Table 6.4c..... Overall Impact Evaluation of Streams and Plantation Habitat....................................... 6-18

Table 6.4d..... Overall Impact Evaluation of Active Agricultural Land, Village/Developed Area, Wasteland/Abandoned Area and Backshore Vegetation Habitat....................................................................................................................... 6-19

Table 6.4e..... Overall Impact Evaluation of Mangrove/Mudflat and Sandy/Rocky Shore Habitat....... 6-19

Table 6.5....... Overall Impact Evaluation to Species of Conservation Interest..................................... 6-21

 

Table 7.1....... Illustration of the Sensitivity of LRs in Siu Ho Wan....................................................... 7-11

Table 7.2....... VSRs in Siu Ho Wan.................................................................................................. 7-12

Table 7.2a..... Illustration of the Sensitivity of LRs in Pui O................................................................ 7-14

Table 7.3....... VSRs in Pui O........................................................................................................... 7-16

Table 7.4....... Landscape Impacts of LCA 1 in Siu Ho Wan without mitigation measures................... 7-17

Table 7.5....... Landscape Impacts of LCA 2 in Siu Ho Wan without mitigation measures................... 7-17

Table 7.6....... Landscape Impacts of LCA 3 in Siu Ho Wan without mitigation measures................... 7-17

Table 7.7 ...... Landscape Impacts of LCA 4 in Siu Ho Wan without mitigation measures................... 7-17

Table 7.8 ...... Summary of Landscape Impacts on LCAs in Siu Ho Wan without Mitigation Measures 7-18

Table 7.8a .... Landscape Impacts of LR 1 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-18

Table 7.8b .... Landscape Impacts of LR 2 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-18

Table 7.8c .... Landscape Impacts of LR 3 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-19

Table 7.8d .... Landscape Impacts of LR 4 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-19

Table 7.8e .... Landscape Impacts of LR 5 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-19

Table 7.8f ..... Landscape Impacts of LR 6 in Siu Ho Wan without Mitigation Measures (Construction and Operation Stages)     7-19

Table 7.8g .... Summary of Landscape Impacts on LRs in Siu Ho Wan without Mitigation Measures.. 7-20

Table 7.9 ...... Landscape Impacts of LCA 1 in Pui O without mitigation measures (Construction and Operation Stages)     7-20

Table 7.10..... Landscape Impacts of LCA 2 in Pui O without mitigation measures (Construction and Operation Stages)     7-20

Table 7.11..... Landscape Impacts of LCA 3 in Pui O without mitigation measures (Construction and Operation Stages)     7-21

Table 7.12..... Landscape Impacts of LCA 4 in Pui O without mitigation measures (Construction and Operation Stages)     7-21

Table 7.13..... Landscape Impacts of LCA 5 in Pui O without mitigation measures (Construction and Operation Stage)      7-21

Table 7.14..... Landscape Impacts of LCA 6 in Pui O without mitigation measures (Construction and Operation Stage)      7-21

Table 7.15..... Landscape Impacts of LCA 7 in Pui O without mitigation measures (Construction Stage) 7-21

Table 7.16..... Landscape Impacts of LCA 7 in Pui O without mitigation measures (Operation Stage). 7-22

Table 7.17..... Landscape Impacts of LCA 8 in Pui O without mitigation measures (Construction and Operation Stage)      7-22

Table 7.18 .... Summary of Landscape Impacts on LCAs in Pui O without Mitigation Measures......... 7-22

Table 7.19 .... Landscape Impacts of LR 1 in Pui O without Mitigation Measures (Construction Stage) 7-23

Table 7.20 .... Landscape Impacts of LR 1 in Pui O without Mitigation Measures (Operation Stage).. 7-23

Table 7.21 .... Landscape Impacts of LR 2 in Pui O without Mitigation Measures (Construction Stage) 7-23

Table 7.22 .... Landscape Impacts of LR 2 in Pui O without Mitigation Measures (Operation Stage).. 7-23

Table 7.23 .... Landscape Impacts of LR 3 in Pui O without Mitigation Measures (Construction Stage) 7-24

Table 7.24 .... Landscape Impacts of LR 3 in Pui O without Mitigation Measures (Operation Stage).. 7-24

Table 7.25 .... Landscape Impacts of LR 4 in Pui O without Mitigation Measures (Construction and Operation Stages)      7-24

Table 7.26 .... Landscape Impacts of LR 5 in Pui O without Mitigation Measures (Construction Stage) 7-24

Table 7.27 .... Landscape Impacts of LR 5 in Pui O without Mitigation Measures (Operation Stage).. 7-24

Table 7.28 .... Landscape Impacts of LR 6 in Pui O without Mitigation Measures (Construction and Operation Stages)      7-24

Table 7.29 .... Landscape Impacts of LR 7 in Pui O without Mitigation Measures (Construction and Operation Stages)      7-25

Table 7.30 .... Landscape Impacts of LR 8 in Pui O without Mitigation Measures (Construction Stage) 7-25

Table 7.31 .... Landscape Impacts of LR 8 in Pui O without Mitigation Measures (Operation Stage).. 7-25

Table 7.32 .... Landscape Impacts of LR 9 in Pui O without Mitigation Measures (Construction and Operation Stages)      7-25

Table 7.33 .... Landscape Impacts of LR 10 in Pui O without Mitigation Measures (Construction and Operation Stages)    7-25

Table 7.34 .... Summary of Landscape Impacts on LRs in Pui O without Mitigation Measures............ 7-26

Table 7.35..... The Sensitivity of the VSRs in Siu Ho Wan................................................................. 7-26

Table 7.36..... Identification of the Magnitude of Change for the VSRs in Siu Ho Wan........................ 7-27

Table 7.37 .... Visual Impact Assessment of the VSRs in Siu Ho Wan without Mitigation Measures.... 7-29

Table 7.38..... The Sensitivity of the VSRs in Pui O........................................................................... 7-30

Table 7.39..... Identification of the Magnitude of Change for the VSRs in Pui O................................. 7-31

Table 7.40 .... Visual Impact Assessment of the VSRs in Pui O without Mitigation Measures.............. 7-32

Table 7.41..... Residual Landscape Impacts on LCAs in Siu Ho Wan with Mitigation Measures......... 7-37

Table 7.42..... Residual Landscape Impacts on LRs in Siu Ho Wan with Mitigation Measures............ 7-37

Table 7.43 .... Residual Landscape Impacts on LCAs in Pui O with Mitigation Measures................... 7-37

Table 7.44 .... Residual Landscape Impacts on LRs in Pui O with Mitigation Measures...................... 7-38

Table 7.45..... Residual Visual Impact of the VSRs in Siu Ho Wan with Mitigation Measures.............. 7-39

Table 7.46..... Residual Visual Impact of the VSRs Pui O with Mitigation Measures........................... 7-40

 

Table 9.1....... Construction Activities and Corresponding Plants/equipment Discussed in HAZOP Study Meeting       9-5

Table 9.2....... Interface between Construction Activities and the Chlorine Building ............................ 9-13

Table 9.3....... Summary of Identified Possible Deviation Causes ....................................................... 9-14

Table 9.4....... Summary of Hazardous Scenarios leading to Chlorine Leakage/release........................ 9-14

Table 9.5....... Summary of Mitigation Measures to Avoid Occurrence of Deviations and Corresponding Responsible Parties      9-15

 

Table 10.1..... Summary of C&D Material Volumes from Excavation Works...................................... 10-4

 

Table 12.1..... Summary of Key Environmental Outcomes/Benefits.................................................... 12-4

 

Table 13.1..... Implementation Schedule for Air Quality Control (Designated Project)........................ 13-2

Table 13.2..... Implementation Schedule for Water Quality Control (Designated Project).................... 13-4

Table 13.3..... Implementation Schedule for Ecology (Designated Project)......................................... 13-6

Table 13.4..... Implementation Schedule for Landscape and Visual Impact (Designated Project)........ 13-8

Table 13.5..... Implementation Schedule for Waste Management (Designated Project)....................... 13-9

Table 13.6..... Implementation Schedule for Air Quality Control (Non-Designated Project).............. 13-12

Table 13.7..... Implementation Schedule for Noise Control (Non-Designated Project)...................... 13-14

Table 13.8..... Implementation Schedule for Water Quality Control (Non-Designated Project).......... 13-16

Table 13.9..... Implementation Schedule for Ecology (Non-Designated Project)............................... 13-18

Table 13.10... Implementation Schedule for Landscape and Visual Impact (Non-Designated Project) 13-20

Table 13.11... Implementation Schedule for Cultural Heritage Impact (Non-Designated Project)...... 13-22

Table 13.12... Implementation Schedule for Waste Management (Non-Designated Project)............. 13-23

 

List of Figures

 

Figure 2.1.............. Location of Project Works at Siu Ho Wan

Figure 2.2.............. Layout Plan of Siu Ho Wan WTW Extension

Figure 2.3.............. Location of Project Works at Pui O

Figure 2.4.............. Process Flow Diagram of Proposed Process

Figure 2.5.............. Preliminary Construction Programme

 

Figure 3.1a............ Locations of Representative Air Sensitive Receivers (Sheet 1 of 2)

Figure 3.1b............ Locations of Representative Air Sensitive Receivers (Sheet 2 of 2)

 

Figure 4.1.............. Locations of Representative Noise Sensitive Receivers at Pui O

 

Figure 5.1.............. Locations of Water Sensitive Receivers at Pui O

Figure 5.2.............. Locations of Water Sensitive Receivers at Siu Ho Wan

 

Figure 6.1.............. Habitat Map of Siu Ho Wan

Figure 6.2a............ Habitat Map of Pui O (Sheet 1 of 3)

Figure 6.2b............ Habitat Map of Pui O (Sheet 2 of 3)

Figure 6.2c............ Habitat Map of Pui O (Sheet 3 of 3)

 

Figure 7.1a............ Baseline Study – Landscape Character Area of Siu Ho Wan (Sheet 1 of 2)

Figure 7.1b............ Baseline Study – Landscape Character Area of Pui O (Sheet 2 of 2)

Figure 7.2a............ Baseline Study – Landscape Resources of Siu Ho Wan (Sheet 1 of 2)

Figure 7.2b............ Baseline Study – Landscape Resources of Pui O (Sheet 2 of 2)

Figure 7.3a............ Baseline Study – Landscape Photographic Record of Siu Ho Wan (Sheet 1 of 2)

Figure 7.3b............ Baseline Study – Landscape Photographic Record of Siu Ho Wan (Sheet 2 of 2)

Figure 7.3c............ Baseline Study – Landscape Photographic Record of Pui O (Sheet 1 of 3)

Figure 7.3d............ Baseline Study – Landscape Photographic Record of Pui O (Sheet 2 of 3)

Figure 7.3e............ Baseline Study – Landscape Photographic Record of Pui O (Sheet 3 of 3)

Figure 7.4a............ Baseline Study – Location of Visual Envelope, Visually Sensitive Receivers and Key Views in Siu Ho Wan (Sheet 1 of 2)

Figure 7.4b............ Baseline Study – Location of Visual Envelope, Visually Sensitive Receivers and Key Views in Pui O (Sheet 2  of 2)

Figure 7.5a1.......... Landscape Impact in Siu Ho Wan

Figure 7.5a............ Landscape Impact in Pui O (Sheet 1 of 4)

Figure 7.5b............ Landscape Impact in Pui O (Sheet 2 of 4)

Figure 7.5c............ Landscape Impact in Pui O (Sheet 3 of 4)

Figure 7.5d............ Landscape Impact in Pui O (Sheet 4 of 4)

Figure 7.6a............ Visual Impact – Key View 1

Figure 7.6aa.......... Visual Impact – Key View 1a

Figure 7.6b............ Visual Impact – Key View 2

Figure 7.6c............ Visual Impact – Key View 3

Figure 7.7a............ Mitigation Measures – SHW

Figure 7.7aa.......... Mitigation Measures – SHW

Figure 7.7b............ Mitigation Measures – SHW

Figure 7.7c............ Mitigation Measures – Pui O

Figure 7.7d............ Proposed Landscape and Visual Mitigation Measures in Siu Ho Wan

Figure 7.7e............ Proposed Landscape and Visual Mitigation Measures in Pui O

Figure 7.8a............ Residual Visual Impact – Key View 1

Figure 7.8aa.......... Residual Visual Impact – Key View 1a

Figure 7.8b............ Residual Visual Impact – Key View 2

Figure 7.8c............ Residual Visual Impact – Key View 3

 

Figure 9.1.............. Layout Plan of Chlorine Delivering Truck Travel Route and Chlorine Pipeline (Approximate)

 

 

Appendices

 

Appendix 3.1........ Calculations of Emission Rate at Pui O

 

Appendix 4.1........ Baseline Noise Survey Data

Appendix 4.2........ Construction Noise Impact Assessment

Appendix 4.3........ Operation Noise Impact Assessment

 

Appendix 6.1........ Representative Photographs of Habitats Recorded in the Assessment Areas

Appendix 6.2........ Photographs of Species of Conservation Interest Recorded From the Assessment Area

Appendix 6.3........ Plant Species Recorded in the Assessment Area

Appendix 6.4........ Fauna recorded in the Assessment Area

 

Appendix 8.1 ....... Built Heritage Catalogue

Appendix 8.2 ....... Built Heritage Figures

Appendix 8.3........ Archaeology Figures

Appendix 9.1........ Implementation Schedule of Mitigation Measures Recommended in HAZOP Study