Content


Chapter    Title                                                                                                                           Page

1.               Introduction                                                                                                                       1-1

1.1                  Background                                                                                                                                                               1-1

1.2                  Designated Projects under EIA Ordinance                                                                                                         1-1

1.3                  Objectives of the EIA Study                                                                                                                                     1-2

1.4                  Key Environmental Issues                                                                                                                                     1-3

1.5                  Use of Relevant Studies                                                                                                                                         1-3

1.6                  Structure of the EIA Report                                                                                                                                     1-3

2.               Project Description                                                                                                            2-1

2.1                  Project Background                                                                                                                                                 2-1

2.2                  Project Alignment                                                                                                                                                     2-1

2.3                  Project Benefits                                                                                                                                                        2-2

2.4                  Scope of the Project                                                                                                                                                 2-3

2.5                  Do-nothing Scenario                                                                                                                                               2-3

2.6                  Public Consultation                                                                                                                                                 2-3

2.7                  Consideration of Railway Design Alternatives                                                                                                   2-4

2.8                  Consideration of Construction Methodologies                                                                                                2-19

2.9                  Tentative Construction Programme                                                                                                                   2-25

2.10                Concurrent Projects                                                                                                                                              2-25

3.               Noise Impact                                                                                                                     3-1

3.1                  Introduction                                                                                                                                                                3-1

3.2                  Environmental Legislation, Standards and Guidelines                                                                                   3-1

3.3                  Assessment Area, Noise Sensitive Receivers and Description of Existing Environment                         3-5

3.4                  Construction Phase Impact                                                                                                                                 3-10

3.5                  Operation Phase Impact                                                                                                                                      3-32

3.6                  Environmental Monitoring and Audit                                                                                                                  3-60

3.7                  Conclusion                                                                                                                                                              3-60

4.               Ecological Impact                                                                                                              4-1

4.1                  Background                                                                                                                                                               4-1

4.2                  Assessment Area                                                                                                                                                    4-1

4.3                  Environmental Legislation, Standards and Guidelines                                                                                   4-1

4.4                  Ecological Baseline Information                                                                                                                           4-2

4.5                  Ecological Value of Sites and Species                                                                                                              4-16

4.6                  Identification, Prediction and Evaluation of Environmental Impact                                                              4-24

4.7                  Mitigation of Adverse Environmental Impact                                                                                                     4-43

4.8                  Post-mitigation Acceptability of the Project                                                                                                       4-47

4.9                  Cumulative Ecological Impact                                                                                                                             4-49

4.10                Evaluation of Residual Impact                                                                                                                            4-49

4.11                Environmental Monitoring and Audit                                                                                                                  4-50

4.12                Conclusion                                                                                                                                                              4-51

4.13                References                                                                                                                                                             4-52

 

5.               Water Quality Impact                                                                                                         5-1

5.1                  Introduction                                                                                                                                                                5-1

5.2                  Environmental Legislation, Standards and Guidelines                                                                                   5-1

5.3                  Assessment Area, Water Sensitive Receivers and Description of the Environment                                  5-5

5.4                  Assessment Methodology                                                                                                                                      5-7

5.5                  Identification of Environmental Impact                                                                                                                 5-7

5.6                  Prediction and Evaluation of Environmental Impact                                                                                          5-8

5.7                  Mitigation of Adverse Environmental Impact                                                                                                     5-15

5.8                  Evaluation of Residual Impact                                                                                                                            5-19

5.9                  Environmental Monitoring and Audit                                                                                                                  5-19

5.10                Conclusion                                                                                                                                                              5-20

6.               Landscape and Visual Impact                                                                                             6-1

6.1                  Introduction                                                                                                                                                                6-1

6.2                  Environmental Legislations, Standards & Guidelines                                                                                     6-1

6.3                  Assessment Methodology                                                                                                                                      6-1

6.4                  Project Summary for LVIA                                                                                                                                       6-6

6.5                  Review of Planning and Development Control Framework                                                                          6-11

6.6                  Baseline Condition                                                                                                                                                6-19

6.7                  Identification and Evaluation of Environmental Impact                                                                                   6-48

6.8                  Mitigation of Adverse Environmental Impact                                                                                                  6-153

6.9                  Evaluation of Residual Impact                                                                                                                          6-159

6.10                Environmental Monitoring and Audit                                                                                                                6-172

6.11                Conclusion                                                                                                                                                           6-172

7.               Hazard to Life                                                                                                                    7-1

7.1                  Introduction                                                                                                                                                                7-1

7.2                  Legislation Requirement and Evaluation Criteria                                                                                             7-2

7.3                  Study Objectives and Methodology                                                                                                                       7-5

7.4                  Facility Details                                                                                                                                                           7-7

7.5                  Population Data                                                                                                                                                     7-15

7.6                  Hazard Identification                                                                                                                                              7-15

7.7                  Frequency Analysis                                                                                                                                               7-16

7.8                  Consequence Analysis                                                                                                                                        7-17

7.9                  Risk Summation                                                                                                                                                    7-17

7.10                PHI Hazard Assessment for Construction and operation Plases of the Project                                       7-28

7.11                Conclusions                                                                                                                                                           7-44

7.12                Recommendations                                                                                                                                               7-44

7.13                References                                                                                                                                                             7-48

8.               Waste Management Implications                                                                                        8-1

8.1                  Introduction                                                                                                                                                                8-1

8.2                  Environmental Legislations, Standards and Guidelines                                                                                 8-1

8.3                  Assessment Methodology                                                                                                                                      8-3

8.4                  Identification, Prediction and Evaluation of Environmental Impact                                                                 8-7

8.5                  Mitigation of Adverse Environmental Impact                                                                                                     8-14

8.6                  Evaluation of Residual Impact                                                                                                                            8-19

8.7                  Environmental Monitoring and Audit                                                                                                                  8-19

8.8                  Conclusion                                                                                                                                                              8-20

9.               Land Contamination                                                                                                           9-1

9.1                  Background                                                                                                                                                               9-1

9.2                  Environmental Legislation, Standards and Guidelines                                                                                   9-1

9.3                  Description of the Environment/ Baseline Conditions                                                                                      9-1

9.4                  Assessment Methodology                                                                                                                                      9-4

9.5                  Identification of Environmental Impact                                                                                                                 9-5

9.6                  Prediction and Evaluation of Environmental Impact                                                                                          9-6

9.7                  Mitigation of Adverse Environmental Impact                                                                                                       9-9

9.8                  Evaluation of Residual Impact                                                                                                                               9-9

9.9                  Environmental Monitoring and Audit                                                                                                                  9-10

9.10                Conclusion                                                                                                                                                              9-10

10.              Air Quality Impact                                                                                                            10-1

10.1                Introduction                                                                                                                                                             10-1

10.2                Environmental Legislations, Standards and Guidelines                                                                               10-1

10.3                Assessment Area and Air Sensitive Receivers                                                                                               10-3

10.4                Description of the Environment/ Background Air Quality                                                                                10-7

10.5                Assessment Methodology                                                                                                                                   10-8

10.6                Identification, Prediction and Evaluation of Environmental Impact                                                            10-17

10.7                Evaluation of Residual Impact                                                                                                                          10-46

10.8                Environmental Monitoring and Audit                                                                                                                10-46

10.9                Conclusion                                                                                                                                                           10-46

11.              Cultural Heritage Impact                                                                                                   11-1

11.1                Background                                                                                                                                                             11-1

11.2                Environmental Legislation, Standards and Guidelines                                                                                 11-1

11.3                Assessment Methodology                                                                                                                                   11-3

11.4                Findings of the Desk-based Review                                                                                                                  11-7

11.5                Identification of Environmental Impact                                                                                                            11-15

11.6                Prediction and Evaluation of Environmental Impact                                                                                     11-16

11.7                Mitigation of Adverse Environmental Impact                                                                                                  11-29

11.8                Environmental Monitoring and Audit                                                                                                                11-37

11.9                Conclusion                                                                                                                                                           11-38

11.10              References                                                                                                                                                           11-38

12.              Environmental Monitoring and Audit                                                                                   12-1

12.1                Introduction                                                                                                                                                             12-1

12.2                Noise Impact                                                                                                                                                          12-1

12.3                Ecological Impact                                                                                                                                                  12-1

12.4                Water Quality Impact                                                                                                                                             12-1

12.5                Landscape and Visual Impact                                                                                                                            12-2

12.6                Hazard to Life                                                                                                                                                          12-2

12.7                Waste Management Implication                                                                                                                         12-2

12.8                Land Contamination                                                                                                                                             12-2

12.9                Air Quality Impact                                                                                                                                                   12-3

12.10              Cultural Heritage Impact                                                                                                                                      12-3

 

13.              Conclusions                                                                                                                    13-1

13.1                General                                                                                                                                                                    13-1

13.2                Summary of Environmental Outcomes, Benefits and Mitigation Measures                                               13-1

14.              Implementation Schedule of Mitigation Measures                                                                14-1

 

 

Tables

Table 2.1:          Selection of Preferred SOH Station Location                                                                                                 2-7

Table 2.2:          Selection of Preferred LET Station Location and Associated Alignment                                                2-10

Table 2.3:          Selection of Preferred WCH and OCP Station Locations and Associated Alignment                         2-13

Table 2.4:          Major Concurrent Projects                                                                                                                               2-26

 

Table 3.1:          Noise Standards for Daytime Construction Activities                                                                                   3-1

Table 3.2:          Ground-borne Noise Criteria (Leq 30min, dB(A))                                                                                         3-3

Table 3.3:          Area Sensitivity Rating                                                                                                                                        3-4

Table 3.4:          Acceptable Noise Level for Operation Airborne Railway Noise                                                                  3-4

Table 3.5:          Acceptable Noise Level for Operation Ground-borne Railway Noise                                                       3-5

Table 3.6:          Acceptable Noise Level for Fixed Plant Noise                                                                                               3-5

Table 3.7:          Representative Noise Sensitive Receivers                                                                                                    3-7

Table 3.8:          Assessment Period for Representative NSRs                                                                                              3-9

Table 3.9:          Key Noise Sources to the Existing NSRs                                                                                                     3-10

Table 3.10:       Unmitigated Construction Airborne Noise Impact near Admiralty Station, Leq (30mins) dB(A)        3-15

Table 3.11:       Unmitigated Construction Airborne Noise Impact near Nam Fung Portal, Leq (30mins) dB(A)       3-15

Table 3.12:       Unmitigated Construction Airborne Noise Impact near Ocean Park Station, Leq (30mins) dB(A)   3-15

Table 3.13:       Unmitigated Construction Airborne Noise Impact near Wong Chuk Hang Station and Depot, Leq (30mins) dB(A)                                                                                                                                                                              3-15

Table 3.14:       Unmitigated Construction Airborne Noise Impact near Wong Chuk Hang Nullah and Aberdeen Channel, Leq (30mins) dB(A)                                                                                                                                                  3-15

Table 3.15:       Unmitigated Construction Airborne Noise Impact near Lei Tung Station and Entrances, Leq (30mins) dB(A)   3-16

Table 3.16:       Unmitigated Construction Airborne Noise Impact near South Horizons Station, Leq (30mins) dB(A) 3-16

Table 3.17:       Unmitigated Construction Airborne Noise Impact near Telegraph Bay Barging Point, Leq (30mins) dB(A)        3-17

Table 3.18:       Unmitigated Construction Airborne Noise Impact near Lee Nam Road Barging Point, Leq (30mins) dB(A)      3-17

Table 3.19:       Unmitigated Construction Airborne Noise Impact near Chung Hom Shan Magazine Site, Leq (30mins) dB(A) 3-17

Table 3.20:       Quieter PME Recommended for Adoption during Construction Phase                                                 3-18

Table 3.21:       Noise Mitigation Measures for Certain PME during Construction Phase                                              3-19

Table 3.22:       Mitigated Construction Airborne Noise Impact near Admiralty Station, Leq (30mins) dB(A)              3-20

Table 3.23:       Mitigated Construction Airborne Noise Impact near Nam Fung Portal, Leq (30mins) dB(A)             3-20

Table 3.24:       Mitigated Construction Airborne Noise Impact near Ocean Park Station, Leq (30mins) dB(A)         3-20

Table 3.25:       Mitigated Construction Airborne Noise Impact near Wong Chuk Hang Station and Depot, Leq (30mins) dB(A)                                                                                                                                                                              3-21

Table 3.26:       Mitigated Construction Airborne Noise Impact near Wong Chuk Hang Nullah and Aberdeen Channel, Leq (30mins) dB(A)                                                                                                                                                                    3-21

Table 3.27:       Mitigated Construction Airborne Noise Impact near Lei Tung Station and Entrances, Leq (30mins) dB(A)         3-21

Table 3.28:       Mitigated Construction Airborne Noise Impact near South Horizons Station, Leq (30mins) dB(A)  3-22

Table 3.29:       Mitigated Construction Airborne Noise Impact near Telegraph Bay Barging Point, Leq (30mins) dB(A)              3-22

Table 3.30:       Mitigated Construction Airborne Noise Impact near Lee Nam Road Barging Point, Leq (30mins) dB(A)            3-22

Table 3.31        Cumulative Construction Airborne Noise Impact in the vicinity of Admiralty                                          3-23

Table 3.32:       Cumulative Construction Airborne Noise Impact near South Horizons Station, Leq (30mins) dB(A) 3-23

Table 3.33        Cumulative Construction Airborne Noise Impact in the vicinity of Telegraph Bay Barging Point       3-23

Table 3.34:       Summary of Residual Impact                                                                                                                         3-24

Table 3.35:       Reference Vibration Level Based on Measurements                                                                                3-27

Table 3.36:       Source Vibration Velocity of Octave Band Frequency for Hydraulic Breaker                                          3-28

Table 3.37:       Wave Propagation Properties of Soil                                                                                                             3-28

Table 3.38:       Adjustment Factor for Building Coupling Loss (BCF)                                                                                3-28

Table 3.39:       Adjustment Factor for Building Structure Attenuation (BSA)                                                                      3-29

Table 3.40:       Building Structure Attenuation (BSA) for SIL(E) Study                                                                                3-29

Table 3.41:       Building Structure Resonance (BSR) for SIL(E) Study                                                                               3-29

Table 3.42:       Room Correction Factors                                                                                                                                3-30

Table 3.43:       Unmitigated Construction Ground-borne Noise Impact near Admiralty Station, Leq (30mins) dB(A) 3-30

Table 3.44        Unmitigated Construction Ground-borne Noise Impact near Nam Fung Portal, Leq (30mins) dB(A) 3-30

Table 3.45        Unmitigated Construction Ground-borne Noise Impact near Sham Wan Tower, Leq (30mins) dB(A) 3-31

Table 3.46:       Unmitigated Construction Ground-borne Noise Impact near Lei Tung Station, Leq (30mins) dB(A) 3-31

Table 3.47        Unmitigated Construction Ground-borne Noise Impact near South Horizons Station, Leq (30mins) dB(A)        3-31

Table 3.48 :      Reference Train Noise Level                                                                                                                          3-32

Table 3.49:       Revenue Train Service Operation Detail (Ultimate Weekly)                                                                      3-36

Table 3.50:       Unmitigated Railway Noise during Daytime and Evening Time (0700-2300)                                      3-37

Table 3.51:       Unmitigated Railway Noise during Night Time (2300-0700)                                                                   3-38

Table 3.52:       Unmitigated Railway Noise in Leq (24hrs)                                                                                                  3-39

Table 3.53:       Proposed Location of Noise Barriers/ Enclosure for Existing Uses                                                       3-40

Table 3.54:       Mitigated Railway Noise during Daytime and Night Time                                                                         3-41

Table 3.55:       Railway Noise during Daytime (0700-2300), with Scenario for Existing NSRs mitigation measures 3-42

Table 3.56:       Railway Noise during Night time (2300-0700), with Scenario for Existing NSRs mitigation measures 3-42

Table 3.57:       Railway Noise in Leq (24hrs) dB(A), with Scenario for Existing NSRs mitigation measures            3-42

Table 3.58:       Proposed Location of Additional Noise Barriers/ Enclosures for Planned Uses                                 3-43

Table 3.59:       Mitigated Railway Noise during Daytime and Night Time                                                                         3-44

Table 3.60:       Summary of Fixed Plant Noise Sources                                                                                                       3-45

Table 3.61:       Maximum SWLs of the Fixed Plant                                                                                                                 3-49

Table 3.62:       Correction Factor for Maximum SWL of the Fixed Plant                                                                             3-51

Table 3.63:       Correction Factor for Maximum SWL of the Fixed Plant                                                                             3-52

Table 3.64:       Operation Ground-borne Noise Prediction Results (Unmitigated)                                                         3-56

Table 3.65        Operation Ground-borne Noise Prediction Results (Mitigated)                                                               3-58

 

Table 4.1:          Habitats Present in Assessment Area                                                                                                            4-4

Table 4.2:          Habitats Present in Project Area                                                                                                                       4-4

Table 4.3:          Ecological Evaluation of Project Area (Admiralty to Nam Fung Road)                                                    4-17

Table 4.4:          Ecological Evaluation of Project Area (Nam Fung Road to Aberdeen Channel)                                  4-18

Table 4.5:          Ecological Evaluation of Project Area (Aberdeen Channel to South Horizons)                                     4-18

Table 4.6:          Ecological Evaluation of Project Area (Magazine Site at Chung Hom Shan)                                         4-19

Table 4.7:          Ecological Evaluation of Project Area (Barging point at Telegraph Bay)                                                4-19

Table 4.8:          Ecological Evaluation of Project Area (Works Site near Wah Kwai Estate)                                           4-20

Table 4.9:          Ecological Evaluation of Floral Species within Proposed Worksite Area (On-site)                              4-20

Table 4.10:       Ecological Evaluation of Faunal Species within Proposed Worksite Area (On-site)                           4-21

Table 4.11:       Habitat Loss                                                                                                                                                       4-24

Table 4.12:       Summary of Evaluation of Potential Ecological Impacts                                                                           4-37

Table 4.13:       Proposed Planting Schedule for Habitat Reinstatement / Habitat compensation of Woodland       4-43

Table 4.14:       Summary of Potential Ecological Impacts before and after adoption of Mitigation Measures           4-47

 

Table 5.1:          Water Quality Objectives for the Victoria Harbour WCZ                                                                                5-1

Table 5.2:          Water Quality Objectives for the Western Buffer WCZ                                                                                  5-2

Table 5.3:          Water Quality Objectives for the Southern WCZ                                                                                             5-3

Table 5.4:          WSD’s Water Quality Criteria for Flushing Water at Sea Water Intakes                                                    5-4

Table 5.5:          Marine Water Quality at Aberdeen South and West Typhoon Shelter in 2007                                         5-6

Table 5.6:          Maximum Waste Water Quantities during Construction Phase                                                               5-11

Table 5.7:          Proposed Staunton Creek Nullah Reconstruction Scheme                                                                     5-14

 

Table 6.1:          Degree of Impact                                                                                                                                                 6-5

Table 6.2:          Residual Impact Significance Threshold Matrix                                                                                            6-6

Table 6.3:          Review of Existing Planning and Development Control Framework                                                       6-14

Table 6.4:          Sensitivity of Landscape Resources (LRs)                                                                                                  6-30

Table 6.5:          Sensitivity of Landscape Character Areas (LCAs)                                                                                      6-36

Table 6.6:          Sensitivity of Visually Sensitive Receivers (VSRs)                                                                                      6-44

Table 6.7:          Sensitivity of Visually Sensitive Receivers                                                                                                    6-46

Table 6.8:          Magnitude of Change for Landscape Resources                                                                                       6-55

Table 6.9:          Existing Landscape Resources and Predicted Impacts                                                                           6-73

Table 6.10:       Magnitude of Change for Landscape Character Areas                                                                           6-103

Table 6.11:       Existing Landscape Character and Predicted Impacts                                                                           6-105

Table 6.12:       Visually Sensitive Receivers and Predicted Impacts                                                                               6-112

Table 6.13:       Proposed Construction Phase Mitigation Measures                                                                               6-155

Table 6.14:       Proposed Operation Phase Mitigation Measures                                                                                    6-155

 

Table 7.1:          Project Contracts and Work Areas (Blasting only)                                                                                      7-10

Table 7.2:          Summary of Explosives Deliveries and Transport Quantities (for Base Case)                                    7-11

Table 7.3:          Summary of Explosives Deliveries and Transport Quantities (for Worst Case)                                   7-12

Table 7.4:          Scenarios Considered in the QRA Study                                                                                                      7-16

Table 7.5:          Potential Loss of Life for Base Case                                                                                                             7-24

Table 7.6:          Potential Loss of Life for Worst Case                                                                                                            7-24

Table 7.7:          Potential Loss of Life for Worst Case and Option 1                                                                                   7-26

Table 7.8:          ALARP Assessment Results                                                                                                                          7-27

Table 7.9:          Plant Operating Data for Bulk Domestic Supply Facility                                                                            7-30

Table 7.10:       Plant Operating Data for Transit Depot                                                                                                         7-31

Table 7.11:       Release Scenarios Considered                                                                                                                    7-32

Table 7.12:       Base Event Frequencies for the LPG Compound                                                                                       7-33

Table 7.13:       Base Event Frequencies for the Transit Depot                                                                                            7-33

Table 7.14:       Event Outcome Frequencies for the LPG Compound                                                                                7-34

Table 7.15:       Event Outcome Frequencies for the Transit Depot                                                                                     7-35

Table 7.16:       Summary of Harm probabilities                                                                                                                     7-37

Table 7.17:       Potential Loss of Life                                                                                                                                        7-39

 

Table 8.1:          Coordinate and Proposed Depth of Grab Sample                                                                                        8-4

Table 8.2:          Parameters Proposed for Chemical Screening for Sediment Samples                                                  8-5

Table 8.3:          Sediment Quality Criteria for the Classification of Sediment                                                                      8-6

Table 8.4:          Summary of C&D Materials Quantity                                                                                                                8-8

Table 8.5:          Summary of Handling Rate and Frequency of Barge Movements and Routings                                 8-10

Table 8.6:          Contaminant Levels of Grab Sample                                                                                                            8-11

Table 8.7:          Summary of Waste Handling Procedures and Disposal Routes for Construction Phase                 8-17

 

Table 9.1:          Land Use History for Future SIL(E) Admiralty Station (ADM)                                                                       9-1

Table 9.2:          Land Use History for Future SIL(E) Ocean Park Station (OCP)                                                                  9-2

Table 9.3:          Land Use History for Future SIL(E) Wong Chuk Hang Station (WCH)                                                      9-3

Table 9.4:          Land Use History for Future SIL(E) Lei Tung Station (LET)                                                                         9-3

Table 9.5:          Land Use History for Future SIL(E) South Horizons Station (SOH)                                                           9-4

Table 9.6:          Potential Contamination for each Study Area                                                                                                 9-6

Table 9.7:          Analytical Results for Soil Samples Taken from Ocean Park Station (OCP) and South Horizons Station (SOH)                                                                                                                                                                                9-8

 

Table 10.1:       Hong Kong Air Quality Objectives                                                                                                                   10-1

Table 10.2:       Representative Air Sensitive Receivers in the Vicinity of Work Sites in Admiralty                                 10-3

Table 10.3:       Representative Air Sensitive Receivers in the Vicinity of Work Sites at Nam Fung Portal and Viaduct Section   10-4

Table 10.4:       Representative Air Sensitive Receivers in the Vicinity of Work Sites in Ocean Park and Viaduct Section             10-4

Table 10.5:       Representative Air Sensitive Receivers in the Vicinity of Work Sites in Wong Chuk Hang and Viaduct Section  10-5

Table 10.6:       Representative Air Sensitive Receivers in the Vicinity of Work Sites in Ap Lei Chau Bridge and Lei Tung           10-5

Table 10.7:       Representative Air Sensitive Receivers in the Vicinity of Work Sites in South Horizons                     10-6

Table 10.8:       Representative Air Sensitive Receivers in the Vicinity of Telegraph Bay Barging Point                      10-7

Table 10.9:       Representative Air Sensitive Receivers in the Vicinity of Lee Nam Road Barging Point                     10-7

Table 10.10:     Representative Air Sensitive Receivers in the Vicinity of Chung Hom Shan Magazine Site               10-7

Table 10.11:     5-Year-Averaged Annual Background Air Quality                                                                                        10-8

Table 10.12      Potential Emission Sources from Works Sites                                                                                           10-8

Table 10.13: Major Construction Works at Lei Tung Portal & Tunnel                                                                               10-12

Table 10.14:     Potential Emission Sources from EPIW and Concurrent Projects                                                       10-13

Table 10.15:     Assumptions for Calculation of Dust Emission Factors                                                                         10-15

Table 10.16:     Predicted Cumulative Hourly Average TSP Concentrations in Admiralty (Unmitigated)                   10-17

Table 10.17:     Predicted Cumulative Hourly Average TSP Concentrations in Nam Fung (Unmitigated)                10-18

Table 10.18:     Predicted Cumulative Hourly Average TSP Concentrations in Ocean Park (Unmitigated)              10-18

Table 10.19:     Predicted Cumulative Hourly Average TSP Concentrations in Wong Chuk Hang (Unmitigated)   10-19

Table 10.20:     Predicted Cumulative Hourly Average TSP Concentrations in Lei Tung (Unmitigated)                    10-20

Table 10.21:     Predicted Cumulative Hourly Average TSP Concentrations in South Horizons (Unmitigated)        10-20

Table 10.22:     Predicted Cumulative Hourly Average TSP Concentrations at Telegraph Bay Barging Point (Unmitigated)        10-21

Table 10.23:     Predicted Cumulative Hourly Average TSP Concentrations at Lee Nam Road Barging Point (Unmitigated)      10-21

Table 10.24:     Predicted Cumulative Hourly Average TSP Concentrations at Chung Hom Shan Magazine Site (Unmitigated) 10-21

Table 10.25:     Predicted Cumulative Daily Average TSP Concentrations in Admiralty (Unmitigated)                      10-21

Table 10.26:     Predicted Cumulative Daily Average TSP Concentrations in Nam Fung (Unmitigated)                   10-22

Table 10.27:     Predicted Cumulative Daily Average TSP Concentrations in Ocean Park (Unmitigated)                 10-22

Table 10.28:     Predicted Cumulative Daily Average TSP Concentrations in Wong Chuk Hang (Unmitigated)      10-23

Table 10.29:     Predicted Cumulative Daily Average TSP Concentrations in Lei Tung (Unmitigated)                      10-23

Table 10.30:     Predicted Cumulative Daily Average TSP Concentrations in South Horizons (Unmitigated)          10-24

Table 10.31:     Predicted Cumulative Daily Average TSP Concentrations at Telegraph Bay Barging Point (Unmitigated)           10-24

Table 10.32:     Predicted Cumulative Daily Average TSP Concentrations at Lee Nam Road Barging Point (Unmitigated)         10-25

Table 10.33:     Predicted Cumulative Daily Average TSP Concentrations at Chung Hom Shan Magazine Site (Unmitigated)   10-25

Table 10.34:     Predicted Cumulative Annual Average TSP Concentrations in Admiralty (Unmitigated)                  10-25

Table 10.35:     Predicted Cumulative Annual Average TSP Concentrations in Nam Fung (Unmitigated)               10-26

Table 10.36:     Predicted Cumulative Annual Average TSP Concentrations in Ocean Park (Unmitigated)             10-26

Table 10.37:     Predicted Cumulative Annual Average TSP Concentrations in Wong Chuk Hang (Unmitigated)  10-27

Table 10.38:     Predicted Cumulative Annual Average TSP Concentrations in Lei Tung (Unmitigated)                   10-27

Table 10.39:     Predicted Cumulative Annual Average TSP Concentrations in South Horizons (Unmitigated)       10-28

Table 10.40:     Predicted Cumulative Annual Average TSP Concentrations at Telegraph Bay Barging Point (Unmitigated)       10-28

Table 10.41:     Predicted Cumulative Annual Average TSP Concentrations at Lee Nam Road Barging Point (Unmitigated)     10-29

Table 10.42:     Predicted Cumulative Annual Average TSP Concentrations at Chung Hom Shan Magazine Site (Unmitigated)                                                                                                                                                                            10-29

Table 10.43:     Predicted Cumulative Hourly Average TSP Concentrations in Admiralty (Tier 1)                               10-31

Table 10.44:     Predicted Cumulative Hourly Average TSP Concentrations in Nam Fung (Tier 1)                            10-32

Table 10.45:     Predicted Cumulative Hourly Average TSP Concentrations in Ocean Park (Tier 1)                          10-32

Table 10.46:     Predicted Cumulative Hourly Average TSP Concentrations in Wong Chuk Hang (Tier 1)               10-32

Table 10.47:     Predicted Cumulative Hourly Average TSP Concentrations in Lei Tung (Tier 1)                                10-33

Table 10.48:     Predicted Cumulative Hourly Average TSP Concentrations in South Horizons (Tier 1)                    10-34

Table 10.49:     Predicted Cumulative Hourly Average TSP Concentrations at Telegraph Bay Barging Point (Tier 1) 10-34

Table 10.50:     Predicted Cumulative Hourly Average TSP Concentrations at Lee Nam Road Barging Point (Tier 1) 10-34

Table 10.51:     Predicted Cumulative Hourly Average TSP Concentrations at Chung Hom Shan Magazine Site (Tier 1)             10-35

Table 10.52:     Predicted Cumulative Hourly Average TSP Concentrations in Wong Chuk Hang at 30% active area nearest to selective ASR (Tier 2)                                                                                                                                     10-35

Table 10.53:     Predicted Cumulative Daily Average TSP Concentrations in Admiralty (Tier 1)                                  10-36

Table 10.54:     Predicted Cumulative Daily Average TSP Concentrations in Nam Fung (Tier 1)                               10-37

Table 10.55:     Predicted Cumulative Daily Average TSP Concentrations in Ocean Park (Tier 1)                             10-37

Table 10.56:     Predicted Cumulative Daily Average TSP Concentrations in Wong Chuk Hang (Tier 1)                  10-38

Table 10.57:     Predicted Cumulative Daily Average TSP Concentrations in Lei Tung (Tier 1)                                  10-38

Table 10.58:     Predicted Cumulative Daily Average TSP Concentrations in South Horizons (Tier 1)                      10-39

Table 10.59:     Predicted Cumulative Daily Average TSP Concentrations at Telegraph Bay Barging Point (Tier 1) 10-39

Table 10.60:     Predicted Cumulative Daily Average TSP Concentrations at Lee Nam Road Barging Point (Tier 1) 10-40

Table 10.61:     Predicted Cumulative Daily Average TSP Concentrations at Chung Hom Shan Magazine Site (Tier 1) 10-40

Table 10.62:     Predicted Cumulative Daily Average TSP Concentrations in Wong Chuk Hang at 30% active area nearest to selective ASR (Tier 2)                                                                                                                                     10-41

Table 10.63: Predicted Cumulative Annual Average TSP Concentrations in Admiralty (Mitigated)                            10-42

Table 10.64:     Predicted Cumulative Annual Average TSP Concentrations in Nam Fung (Mitigated)                     10-42

Table 10.65:     Predicted Cumulative Annual Average TSP Concentrations in Ocean Park (Mitigated)                   10-43

Table 10.66:     Predicted Cumulative Annual Average TSP Concentrations Wong Chuk Hang (Mitigated)             10-43

Table 10.67:     Predicted Cumulative Annual Average TSP Concentrations in Lei Tung (Mitigated)                         10-44

Table 10.68:     Predicted Cumulative Annual Average TSP Concentrations in South Horizons (Mitigated)             10-44

Table 10.69:     Predicted Cumulative Annual Average TSP Concentrations at Telegraph Bay Barging Point (Mitigated)             10-45

Table 10.70:     Predicted Cumulative Annual Average TSP Concentrations at Lee Nam Road Barging Point (Mitigated)           10-45

Table 10.71:     Predicted Cumulative Annual Average TSP Concentrations at Chung Hom Shan Magazine Site (Mitigated)      10-45

 

Table 11.1:       Assessment of Impacts to Declared Monuments from Surface Works (Construction Phase)       11-20

Table 11.2:       Assessment of Impacts to Declared Monuments from Tunnel Formation (Construction Phase) 11-20

Table 11.3:       Assessment of Impacts to Graded Historic Buildings from Surface Works (Construction Phase) 11-21

Table 11.4:       Assessment of Impacts to Graded Historic Buildings from Tunnel Formation (Construction Phase) 11-22

Table 11.5:       Assessment of Impacts to Proposed Graded Heritage Resources from Surface Works (Construction Phase)                                                                                                                                                                            11-23

Table 11.6:       Assessment of Impacts to Proposed Graded Heritage Resources from Tunnel Formation (Construction Phase)                                                                                                                                                                            11-23

Table 11.7:       Assessment of Impacts to Other Built Heritage Resources from Surface Works in Admiralty (Construction Phase)                                                                                                                                                                            11-23

Table 11.8:       Assessment of Impacts to Other Built Heritage Resources from Tunnel Formation in Admiralty (Construction Phase)                                                                                                                                                              11-23

Table 11.9:       Assessment of Impacts to Other Built Heritage Resources in Wong Chuk Hang (Construction Phase)             11-24

Table 11.10:     Assessment of Impacts from Surface Works to Other Built Heritage Resources on Ap Lei Chau (Construction Phase)                                                                                                                                                              11-24

Table 11.11:     Assessment of Impacts from Tunneling Works to Other Built Heritage Resources on Ap Lei Chau (Construction Phase)                                                                                                                                                              11-25

Table 11.12:     Assessment of Impacts to Declared Monuments (Operation Phase)                                                 11-26

Table 11.13: Assessment of Impacts to Graded Historic Buildings (Operation Phase)                                              11-26

Table 11.14:     Assessment of Impacts to Proposed Graded Historic Buildings in Admiralty (Operation Phase) 11-27

Table 11.15:     Assessment of Impacts to Proposed Graded Historic Buildings in Wong Chuk Hang (Operation Phase)         11-27

Table 11.16:     Assessment of Impacts to Other Built Heritage Resources in Admiralty (Operation Phase)          11-27

Table 11.17:     Assessment of Impacts to Other Built Heritage Resources in Wong Chuk Hang (Operation Phase) 11-28

Table 11.18:     Assessment of Impacts to Other Built Heritage Resources on Ap Lei Chau (Operation Phase)   11-28

Table 11.19:     Mitigation Recommendations for Declared Monuments (Construction Phase)                                11-30

Table 11.20:     Mitigation Recommendations for Graded Historical Buildings (Construction Phase)                     11-30

Table 11.21:     Mitigation Recommendations for Proposed Graded Historical Buildings (Construction Phase)  11-31

Table 11.22:     Mitigation Recommendations for Other Built Heritage Resources in Admiralty (Construction Phase) 11-32

Table 11.23:     Mitigation Recommendations to Other Built Heritage Resources in Wong Chuk Hang (Construction Phase)   11-32

Table 11.24:     Mitigation Recommendations to Other Built Heritage Resources on Ap Lei Chau (Construction Phase)           11-33

Table 11.25:     Mitigation Recommendations for Declared Monuments (Operation Phase)                                      11-33

Table 11.26:     Mitigation Recommendations for Graded Historical Buildings (Operation Phase)                           11-34

Table 11.27:     Mitigation Recommendations for Proposed Graded Built Heritage Resources in Admiralty (Operation Phase)                                                                                                                                                                            11-34

Table 11.28:     Mitigation Recommendations for Proposed Graded Built Heritage Resources in Wong Chuk Hang (Operation Phase)                                                                                                                                                              11-35

Table 11.29:     Mitigation Recommendations for Other Built Heritage Resources in Admiralty (Operation Phase) 11-35

Table 11.30:     Mitigation Recommendations to Other Built Heritage Resources in Wong Chuk Hang (Operation Phase) WCH-2 through WCH-17 on Figure 11.17                                                                                                               11-35

Table 11.31:     Mitigation Recommendations to Other Built Heritage Resources on Ap Lei Chau (Operation Phase) 11-36

Table 11.32:     Areas requiring archaeological watching brief during the construction phase                                  11-37

 

Table ‎14.1:       Implementation Schedule of Mitigation Measures                                                                                     14-1