Civil Engineering and Development Department


Agreement No. CE 18/2012 (CE) Development of Anderson Road Quarry - Investigation

 

 Environmental Impact Assessment Report

 

 


Contents

                                                                                                                                                                      

1            INTRODUCTION   1-1

1.1           Background  1-1

1.2           Study Area  1-1

1.3           EIA Study Brief  1-1

1.4           Designated Projects  1-2

1.5           Further EIA Study for the Schedule 2 DPs  1-3

1.6           Pedestrian Connectivity  1-4

1.7           Objectives of the EIA   1-4

1.8           Structure of this EIA Report 1-5

2            SCOPE OF ENVIRONMENTAL IMPACT ASSESSMENT STUDY   2-1

3            PROJECT DESCRIPTION   3-1

3.1           General Description of the Project 3-1

3.2           Need for the Project 3-1

3.3           Recommended Outline Development Plan  3-1

3.4           Key Infrastructure  3-11

3.5           Nature, Benefit and Scope of the Project 3-14

3.6           Construction Method  3-17

3.7           Implementation Programme  3-18

3.8           Concurrent Projects and Evaluation of Potential Cumulative Impacts  3-19

4            AIR QUALITY IMPACT   4-1

4.1           Legislation and Standards  4-1

4.2           Description of Existing Environment 4-2

4.3           Study Area &Air Sensitive Receivers  4-5

4.4           Pollution Sources  4-35

4.5           Potential Concurrent Projects/ Sources  4-36

4.6           Assessment Methodology  4-37

4.7           Construction Dust Assessment 4-53

4.8           Operational Air Quality Assessment 4-60

4.9           Residual Impacts  4-62

4.10         Environmental Acceptability of Schedule 2 Designated Projects  4-62

4.11         Conclusion  4-64

5            NOISE IMPACT   5-1

5.1           Legislation and Standards  5-1

5.2           Description of Existing Environment 5-5

5.3           Study Area & Noise Sensitive Receivers  5-6

5.4           Potential Concurrent Projects  5-10

5.5           Assessment Methodology  5-11

5.6           Construction Noise Assessment 5-15

5.7           Road Traffic Noise Assessment 5-25

5.8           Fixed Plant Noise Assessment 5-32

5.9           Assessment of Side Effects and Constraints  5-34

5.10         Evaluation of Constraints on Planned Noise Sensitive Developments/ Land Uses  5-34

5.11         Residual Impacts  5-35

5.12         Environmental Acceptability of Schedule 2 Designated Projects  5-35

5.13         Conclusion  5-37

6            WATER QUALITY   6-1

6.1           Legislation and Standards  6-1

6.2           Description of Existing Environment 6-5

6.3           Water Quality Sensitive Receivers & Pollution Sources  6-8

6.4           Potential Concurrent Projects  6-9

6.5           Assessment Methodology  6-9

6.6           Construction Phase Assessment 6-9

6.7           Operational Phase Assessment 6-13

6.8           Residual Impacts  6-15

6.9           Environmental Acceptability of Schedule 2 Designated Projects  6-15

6.10         Conclusion  6-16

7            SEWERAGE AND SEWAGE TREATMENT IMPLICATION   7-1

7.1           Legislation and Standards  7-1

7.2           Description of Existing Environment 7-1

7.3           Sewage Estimation and Assessment Methodology  7-2

7.4           Evaluation of Impact on Sewage Treatment Works  7-2

7.5           Evaluation of Impact on Sewerage System and Mitigation Measures  7-3

7.6           Environmental Acceptability of Schedule 2 Designated Projects  7-4

7.7           Conclusion  7-4

8            WASTE MANAGEMENT IMPLICATION   8-1

8.1           Environmental Legislation, Standards and Guidelines  8-1

8.2           Description of the Environment 8-3

8.3           Assessment Methodology  8-4

8.4           Identification and Evaluation of Waste Management Implications  8-5

8.5           Mitigation Measures  8-17

8.6           Residual Environmental Impacts  8-21

8.7           Environmental Acceptability of Schedule 2 Designated Projects  8-21

8.8           Conclusion  8-22

9            LAND CONTAMINATION   9-1

9.1           Environmental Legislation and Guidelines  9-1

9.2           Assessment Methodology  9-6

9.3           Description of the Environment 9-8

9.4           Future Land Use  9-9

9.5           Potentially Contaminated Area  9-10

9.6           Site Investigation  9-17

9.7           Environmental Acceptability of Schedule 2 Designated Projects  9-18

9.8           Conclusion  9-19

10          ECOLOGICAL IMPACT   10-1

10.1         Legislation and Standards  10-1

10.2         Description of the Study  10-2

10.3         Survey Methodology  10-4

10.4         Ecological Baseline Conditions  10-6

10.5         Evaluation of Ecological Importance of Habitats and

                Species  10-19

10.6         Potential Ecological Impacts of the Proposed

                Development 10-37

10.7         Mitigation Measures Adopted to Avoid, Minimise and Compensate for Ecological Impacts  10-51

10.8         Precautionary measures for herpetofauna  10-56

10.9         Residual Impacts  10-56

10.10       Environmental Acceptability of Schedule 2 Designated Projects  10-57

10.11       Conclusion  10-58

10.12       References  10-58

11          LANDSCAPE AND VISUAL IMPACTS  11-1

11.1         Legislation and Standards  11-1

11.2         Assessment Methodology  11-3

11.3         Scope and Content of the Study  11-9

11.4         Review of Planning and Development Control Framework  11-9

11.5         Baseline Study  11-13

11.6         Landscape Issues  11-13

11.7         Visual Issues  11-13

11.8         Cumulative Impacts  11-14

11.9         Landscape Resources and Landscape Character Areas  11-14

11.10       Visual Envelope  11-25

11.11       Visually Sensitive Receivers (VSRs) 11-25

11.12       Landscape Impact Assessment 11-38

11.13       Visual Impact Assessment 11-44

11.14       Mitigation Measures  11-58

11.15       Magnitude Of Visual Impacts  11-72

11.16       Prediction of Significance of Visual Impacts  11-75

11.17       Environmental Acceptability of Schedule 2 Designated Projects  11-90

11.18       Conclusion  11-90

12          ENVIRONMENTAL MONITORING AND AUDIT   12-1

12.1         Introduction  12-1

12.2         Project Organisation  12-1

12.3         EM&A Manual 12-1

12.4         Project Implementation Schedule  12-2

12.5         EM&A Programme  12-2

13          SUMMARY OF ENVIRONMENTAL OUTCOMES  13-1

13.1         Population and Environmental Areas Protected  13-1

13.2         Environmental Friendly Design and Benefits  13-1

13.3         Summary of the Measures taken for the Avoidance and Minimisation of Environmental Impacts  13-2

14          CONCLUSION   14-1

14.1         General 14-1

14.2         Air Quality Impact 14-1

14.3         Noise Impact 14-2

14.4         Water Quality  14-2

14.5         Sewerage and Sewage Treatment Implication  14-3

14.6         Waste Management Implication  14-3

14.7         Land Contamination  14-3

14.8         Ecological Impact 14-4

14.9         Landscape and Visual Impacts  14-4

14.10       Environmental Monitoring and Audit Requirement 14-6

 

 

FIGURES

1            INTRODUCTION

227724/E/0001           Location of Project

227724/E/0002           Locations of Designated Projects

3            PROJECT DESCRIPTION

227724/E/0003           Recommended Outline Development Plan

227724/E/0004           Plan of Road L4 of ARQ

227724/E/0005           Plan of Access Road Leading to Po Lam Road

227724/E/0006           Location of Deleted Drainage Retention Tank

227724/E/0007           Plan of Proposed Sewerage Layout

227724/E/0008           Locations of Concurrent Projects

4            AIR QUALITY IMPACT

227724/E/1010           Locations of Air Sensitive Receivers (Sheet 1 of 4)

227724/E/1020           Locations of Air Sensitive Receivers (Sheet 2 of 4)

227724/E/1030           Locations of Air Sensitive Receivers (Sheet 3 of 4)

227724/E/1040           Locations of Air Sensitive Receivers (Sheet 4 of 4)

227724/E/1050           Locations of Chimneys within 500m Assessment Area

227724/E/1060           Locations of Potential Odour Sources

227724/E/1065           Location of Open Road and Tunnel Portal (Construction Phase) (Sheet 1 of 3)

227724/E/1066           Location of Open Road and Tunnel Portal (Construction Phase) (Sheet 2 of 3)

227724/E/1067           Location of Open Road and Tunnel Portal (Construction Phase) (Sheet 3 of 3)

227724/E/1070           Location of Open Road and Tunnel Portal (Operational Phase) (Sheet 1 of 3)

227724/E/1080           Location of Open Road and Tunnel Portal (Operational Phase) (Sheet 2 of 3)

227724/E/1090           Location of Open Road and Tunnel Portal (Operational Phase)  (Sheet 3 of 3)

227724/E/1100           Contours of Cumulative Unmitigated Max. 1-hour TSP Concentration at 1.5m above Ground in Year 2017

227724/E/1101           Contours of Cumulative Unmitigated Max. 24-hour RSP Concentration at 1.5m above ground in Year 2017

227724/E/1102           Contours of Cumulative Unmitigated 10th Highest 24-hour RSP Concentration at 1.5m above ground in Year 2017

227724/E/1103           Contours of Cumulative Unmitigated Annual-average RSP Concentration at 1.5m above ground in Year 2017

227724/E/1104           Contours of Cumulative Unmitigated Max. 24-hour FSP Concentration at 1.5m above ground in Year 2017

227724/E/1105           Contours of Cumulative Unmitigated 10th Highest 24-hour FSP Concentration at 1.5m above ground in Year 2017

227724/E/1106           Contours of Cumulative Unmitigated Annual-average FSP Concentration at 1.5m above ground in Year 2017

227724/E/1160           Contours of Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1161           Contours of Cumulative Mitigated Max. 24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1162           Contours of Cumulative Mitigated 10th Highest  24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1163           Contours of Cumulative Mitigated Max. 24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1164           Contours of Cumulative Mitigated 10th Highest  24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1179           Contours of Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (Ma Yau Tong Village)

227724/E/1180           Contours of Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site C)

227724/E/1181           Contours of Cumulative Mitigated Max. 24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site C & Site E)

227724/E/1182           Contours of Cumulative Mitigated 10th Highest  24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site C & Site E)

227724/E/1183           Contours of Cumulative Mitigated Max. 24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site C & Site E)

227724/E/1184           Contours of Cumulative Mitigated 10th Highest 24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site C & Site E)

227724/E/1185           Contours of Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site E)

227724/E/1186           Contours of Cumulative Mitigated Max. 24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site E)

227724/E/1187           Contours of Cumulative Mitigated 10th Highest  24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site E)

227724/E/1188           Contours of Cumulative Mitigated Max. 24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site E)

227724/E/1189           Contours of Cumulative Mitigated 10th Highest  24-hour FSP Concentration at 1.5m above ground in Year 2017 (Tier 2) (DAR Site E)

227724/E/1210           Contours of Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5m above ground in Year 2017 (Tier 3) (DAR Site C)

227724/E/1211           Contours of Cumulative Mitigated Max. 24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 3) (DAR Site C)

227724/E/1212           Contours of Cumulative Mitigated 10th Highest 24-hour RSP Concentration at 1.5m above ground in Year 2017 (Tier 3) (DAR Site C)

227724/E/1231           Contours of Cumulative Mitigated Annual-average RSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1232           Contours of Cumulative Mitigated Annual-average FSP Concentration at 1.5m above ground in Year 2017 (Tier 1)

227724/E/1300           Contours of Cumulative Max. 1-hour NO2 Concentration at 1.5m above ground in Year 2026

227724/E/1301           Contours of Cumulative 19th Highest 1-hour NO2 Concentration at 1.5m above ground in Year 2026

227724/E/1320           Contours of Cumulative Annual-average NO2 Concentration at 1.5m above ground in Year 2026

227724/E/1321           Contours of Cumulative Annual-average NO2 Concentration at 5m above ground in Year 2026

227724/E/1330           Contours of Cumulative Max. 24-hour RSP Concentration at 1.5m above ground in Year 2026

227724/E/1331           Contours of Cumulative 10th Highest 24-hour RSP Concentration at 1.5m above ground in Year 2026

227724/E/1340           Contours of Cumulative Annual-average RSP Concentration at 1.5m above ground in Year 2026

227724/E/1350           Contours of Cumulative Max. 24-hour FSP Concentration at 1.5m above ground in Year 2026

227724/E/1351           Contours of Cumulative 10th Highest 24-hour FSP Concentration at 1.5m above ground in Year 2026

227724/E/1360           Contours of Cumulative Annual-average FSP Concentration at 1.5m above ground in Year 2026

5            NOISE IMPACT

227724/E/2000           Recommendations from Planning Study of Anderson Road Quarry

227724/E/2010           Locations of Noise Sensitive Receivers Location (Sheet 1 of 4)

227724/E/2020           Locations of Noise Sensitive Receivers Location (Sheet 2 of 4)

227724/E/2030           Locations of Noise Sensitive Receivers Location (Sheet 3 of 4)

227724/E/2040           Locations of Noise Sensitive Receivers Location (Sheet 4 of 4)

227724/E/2050           Prevailing Background Noise Measurement Locations

227724/E/2100           Extent of Temporary Noise Barrier

227724/E/2200           Extent of Project Road in ARQ

227724/E/2210           Location and Extent of Mitigation Measures (Sheet 1 of 2)

227724/E/2220           Location and Extent of Mitigation Measures (Sheet 2 of 2)

227724/E/2221           Typical Cross Section of the Proposed Semi-enclosure Noise Barrier

227724/E/2300           Locations of Fixed Noise Source (Sheet 1 of 2)

227724/E/2310           Locations of Fixed Noise Source (Sheet 2 of 2)

6            WATER QUALITY

227724/E/3001           Locations of EPD Water Quality Monitoring Stations

227724/E/3002           Locations of Additional Water Quality Monitoring Stations

227724/E/3003           Locations of Stream Alternation Works

8            WASTE MANAGEMENT IMPLICATION

227724/E/4001           Management of Study Area

10          ECOLOGICAL IMPACT

227724/E/6101           Habitat Map of Anderson Road Quarry (Study Area and Assessment Area) (Overall)

227724/E/6102           Habitat Map of Anderson Road Quarry (Study Area and Assessment Area) (Sheet 1 of 4)

227724/E/6103           Habitat Map of Anderson Road Quarry (Study Area and Assessment Area) (Sheet 2 of 4)

227724/E/6104           Habitat Map of Anderson Road Quarry (Study Area and Assessment Area) (Sheet 3 of 4)

227724/E/6105           Habitat Map of Anderson Road Quarry (Study Area and Assessment Area) (Sheet 4 of 4)

227724/E/6106           Locations of Recognized Sites of Conservation Importance

227724/E/6201           Survey Transects and Surveyed Watercourses

227724/E/6301           Locations of Floral Species of Conservation Importance (Sheet 1 of 3)

227724/E/6302           Locations of Floral Species of Conservation Importance (Sheet 2 of 3)

227724/E/6303           Locations of Floral Species of Conservation Importance (Sheet 3 of 3)

227724/E/6304           Locations of Bird Species of Conservation Importance

227724/E/6305           Locations of Herpetofauna Species of Conservation Importance

227724/E/6306           Locations of Dragonfly Species of Conservation Importance

227724/E/6307           Locations of Butterfly Species of Conservation Importance

227724/E/6308           Locations of Stream Fauna of Conservation Importance

227724/E/6401           Locations of the Impacted Secondary Woodland within the Study Area

11          LANDSCAPE AND VISUAL IMPACT

227724/L/2000           Bird Eye View Photography

227724/L/2100           Recommended Outline Development Plan

227724/L/2110           Recommended Urban Design Plan

227724/L/2120           Pedestrian Connections Plan

227724/L/2200           Landscape Resources Plan

227724/L/2210           Photo of Landscape Resources (Sheet 1 of 3)

227724/L/2211           Photo of Landscape Resources (Sheet 2 of 3)

227724/L/2212           Photo of Landscape Resources (Sheet 3 of 3)

227724/L/2300           Landscape Character Areas Plan

227724/L/2310           Photo of Landscape Character Areas

227724/L/2400           Visual Envelope

227724/L/2410           Key Visual Sensitive Receivers (VSR) Sheet 1 of 4

227724/L/2420           Key Visual Sensitive Receivers (VSR) Sheet 2 of 4

227724/L/2430           Key Visual Sensitive Receivers (VSR) Sheet 3 of 4

227724/L/2440           Key Visual Sensitive Receivers (VSR) Sheet 4 of 4

227724/L/2450           Photo of Key Visual Sensitive Receivers (Sheet 1 of 14)

227724/L/2460           Photo of Key Visual Sensitive Receivers (Sheet 2 of 14)

227724/L/2470           Photo of Key Visual Sensitive Receivers (Sheet 3 of 14)

227724/L/2480           Photo of Key Visual Sensitive Receivers (Sheet 4 of 14)

227724/L/2490           Photo of Key Visual Sensitive Receivers (Sheet 5 of 14)

227724/L/2500           Photo of Key Visual Sensitive Receivers (Sheet 6 of 14)

227724/L/2510           Photo of Key Visual Sensitive Receivers (Sheet 7 of 14)

227724/L/2520           Photo of Key Visual Sensitive Receivers (Sheet 8 of 14)

227724/L/2530           Photo of Key Visual Sensitive Receivers (Sheet 9 of 14)

227724/L/2540           Photo of Key Visual Sensitive Receivers (Sheet 10 of 14)

227724/L/2550           Photo of Key Visual Sensitive Receivers (Sheet 11 of 14)

227724/L/2560           Photo of Key Visual Sensitive Receivers (Sheet 12 of 14)

227724/L/2570           Photo of Key Visual Sensitive Receivers (Sheet 13 of 14)

227724/L/2580           Photo of Key Visual Sensitive Receivers (Sheet 14 of 14)

227724/L/2590           Viewing from Key Public View Points (Sheet 1 of 6)

227724/L/2591           Viewing from Key Public View Points (Sheet 2 of 6)

227724/L/2592           Viewing from Key Public View Points (Sheet 3 of 6)

227724/L/2593           Viewing from Key Public View Points (Sheet 4 of 6)

227724/L/2594           Viewing from Key Public View Points (Sheet 5 of 6)

227724/L/2595           Viewing from Key Public View Points (Sheet 6 of 6)

227724/L/2600           Landscape and Visual Mitigation Measures

227724/L/2610           Landscape Master Plan

227724/L/2611           Landscape Master Plan with Proposed Mitigation Measures

227724/L/2620           Sections (Sheet 1 of 2)

227724/L/2621           Sections (Sheet 2 of 2)

227724/L/2623           Typical Details from Man-Made Slope

227724/L/2624           Typical Details for New Footpath

227724/L/2625           Section at Potentially Registrable OVTs

227724/L/2631           Perspective View from the Lookout at 310mPD

227724/L/2632           Perspective View of Proposed Development from the Study Area

227724/L/2640           Development Massing and Height Profile- Section Plan

227724/L/2641           Development Massing and Height Profile- Sections A-A, B-B, C-C

227724/L/2711           Residual Impact on Landscape Resources with Mitigation Measures in Year 10

227724/L/2721           Residual Impact on Landscape Character Areas with Mitigation Measures in Year 10

227724/L/2731           Residual Impacts on VSRs at Local Level with Mitigation Measures in Year 10 (Sheet 1 of 4)

227724/L/2732           Residual Impacts on VSRs at Local and District Levels with Mitigation Measures in Year 10 (Sheet 2 of 4)

227724/L/2733           Residual Impacts on VSRs at District and Strategic Levels with Mitigation Measures in Year 10 (Sheet 3 of 4)

227724/L/2734           Residual Impacts on VSRs at Strategic Level with Mitigation Measures in Year 10 (Sheet 4 of 4)

227724/L/2800           Photomontage Viewpoint Locations

227724/L/2810           SVP1 Photomontage

227724/L/2820           SVP2 Photomontage

227724/L/2830           SVP3 Photomontage (Sheet 1 of 2)

227724/L/2831           SVP3 Photomontage (Sheet 2 of 2)

227724/L/2840           SVP4 Photomontage (Sheet 1 of 2)

227724/L/2841           SVP4 Photomontage (Sheet 2 of 2)

227724/L/2850           SVP5 Photomontage

227724/L/2860           DVP1 Photomontage

227724/L/2870           DVP2 Photomontage (Sheet 1 of 2)

227724/L/2871           DVP2 Photomontage (Sheet 2 of 2)

227724/L/2880           DVP3 Photomontage

227724/L/2890           DVP4 Photomontage (Sheet 1 of 2)

227724/L/2891           DVP4 Photomontage (Sheet 2 of 2)

227724/L/2900           LVP1 Photomontage

227724/L/2910           LVP2 Photomontage

227724/L/2920           LVP3 Photomontage

227724/L/2930           LVP4 Photomontage

227724/L/2940           LVP5 Photomontage

227724/L/2950           LVP6 Photomontage

227724/L/2960           LVP7 Photomontage

227724/L/2970           LVP8 Photomontage (Sheet 1 of 2)

227724/L/2971           LVP8 Photomontage (Sheet 2 of 2)

227724/L/2980           LVP9 Photomontage

227724/L/2990           LVP10 Photomontage

227724/L/3000           LVP11 Photomontage

 

 

 

APPENDICES

Appendix Volume 1 – Appendices 4.1 to 4.15 (exclude Appendix 4.5 Annex 9)

4            AIR QUALITY

Appendix 4.1              Details of Dust Emission Sources and Calculations

Appendix 4.2              Construction Programme of Heavy Construction Activities

Appendix 4.3              Details of Industrial Emission Sources and Calculations

Appendix 4.4              Calculation of the Dust Emission Inventory from the Project

Appendix 4.5              Key Assumptions for EmFAC-HK (exclude Annex 9)

Appendix 4.6              Calculation of Portal Emission (Construction Phase)

Appendix 4.7              PATH Concentration of Year 2015

Appendix 4.8              Justifications for the Percentage of Active Works Areas and Dust Suppression Efficiency

Appendix 4.9              Summary of Composite Vehicular Emission Factor (Construction Phase)

Appendix 4.10            Calculation of Portal Emission (Operational Phase)

Appendix 4.11            Summary of Composite Vehicular Emission Factor (Operational Phase)

Appendix 4.12            PATH Concentration of Year 2020

Appendix 4.13            Detailed Results of Construction Dust Assessment

Appendix 4.14            Detailed Results of Operational Air Quality Assessment

Appendix 4.15            Photos of Ground Floor of Sau Fai House

Appendix Volume 2 – Appendix 4.5 (Annex 9)

Appendix 4.5              Key Assumptions for EmFAC-HK (Annex 9)

Appendix Volume 3 – Appendices 5.1 to 5.15

5            NOISE IMPACT

Appendix 5.1              Photos of Existing NSRs

Appendix 5.2              Endorsement of Traffic Data from Transport Department

Appendix 5.3              Construction Programme and Location of Workfront

Appendix 5.4              SWL of Plant List

Appendix 5.5A           Detailed PME Inventory

Appendix 5.5B           Separation Distance between NSRs and Notional Construction Noise Source

Appendix 5.5C           Monthly Unmitigated Noise Contribution

Appendix 5.5D           Unmitigated Construction Noise Impact

Appendix 5.5E           Monthly Mitigated Noise Contribution

Appendix 5.5F           Mitigated Construction Noise Impact

Appendix 5.6              Sketch of Typical Temporary Noise Barrier/ Enclosure

Appendix 5.7              Traffic Flow Data

Appendix 5.8              Location of Existing Extent of Friction Course

Appendix 5.9              Predicted Road Traffic Noise (Unmitigated)

Appendix 5.10            Predicted Road Traffic Noise (Mitigated)

Appendix 5.11            Predicted Road Traffic Noise (Prevailing Scenario)

Appendix 5.12           Road Plot of Noise Model and Sample Calculation of Road Traffic Noise

Appendix 5.13           Fixed Plant Noise Assessment

Appendix 5.14           Correspondence from Lands Department, Architectural Services Department and Education Bureau

Appendix 5.15           Broadbrush Road Traffic Noise Assessment for Road Improvement Works

Appendix Volume 4 – Appendices 7.1 to 13.1

7            WASTE MANAGEMENT IMPLICATION

Appendix 7.1              Sewerage Impact Assessment (SIA) Report

Appendix 7.2              Proposed Sewerage Layout Plan and Manhole Schedule

9            LAND CONTAMINATION

Appendix 9.1              Endorsed Final Contamination Assessment Plan

Appendix 9.2              Historical Aerial Photos of Road Improvement Works

10          ECOLOGICAL IMPACT

Appendix 10.1            Photos of Habitats in Study Area and Assessment Area

Appendix 10.2            Plant Species Recorded in Study Area and Assessment Area

Appendix 10.3            Bird Species Recorded in Study Area and Assessment Area

Appendix 10.4            Herpetofauna Species Recorded in Study Area and Assessment Area

Appendix 10.5            Dragonfly Species Recorded in Study Area and Assessment Area

Appendix 10.6            Butterfly Species Recorded in Study Area and Assessment Area

Appendix 10.7            Stream Fauna Recorded in Study Area and Assessment Area

11          LANDSCAPE AND VISUAL IMPACTS

Appendix 11.1            Tree Survey Plan

12          ENVIRONMENTAL MONITORING AND AUDIT

Appendix 12.1            Project Implementation Schedule

13          SUMMARY OF ENVIRONMENTAL OUTCOMES

Appendix 13.1           Recommended Urban Design Plan