Table of Contents

VOLUME 1 of 2

1.           INTRODUCTION

1.1         Project Background

1.2         Designated Projects under EIAO

1.3         Purpose of the EIA Study

1.4         Objectives of this EIA Study

1.5         Approach to EIA Study

1.6         EIA Study Scope

1.7         Public Engagement /Consultation

1.8         Structure of the EIA Report

2.           PROJECT DESCRIPTION

2.1         Introduction

2.2         Existing Road Networks

2.3         The Need for the Project

2.4         Benefit of the Project

2.5         Proposed Road Works

2.6         Consideration of Alternative Options

2.7         Screening of the Options

2.8         Evaluation of Options

2.9         Construction Method and Engineering Requirements

2.10       Works Programme

2.11       Concurrent Project

3.           AIR QUALITY IMPACT

3.1         Introduction

3.2         Environmental Legislation, Standards and Criteria

              Air Quality Objectives & EIAO-TM

              Air Pollution Control (Construction Dust) Regulation

3.3         Existing Environmental Context

3.4         Existing Background Air Quality Review

3.5         Construction Phase Assessment

              Evaluation of Construction Phase Air Quality Impact

              Construction Phase Mitigation Measures

3.6         Operational Phase Assessment

              Identification of Air Sensitive Receivers

              Identification of Pollution Sources and Key Pollutants

              Determination of Worst Assessment Year in Air Quality Impact Assessment

              Projected Background Air Quality Result of Year 2021 by PATH Model

              Assessment Methodology

              Cumulative Impact for “Without Project” Scenario in Year 2021

              Cumulative Impact for “With Project” Scenario in Year 2021

              Comparison of Annual Average NO2 Concentrations between “With Project”

              and “Without Project” Scenarios in Year 2021

              Mitigation Measures and Residual Impacts

3.7         Environmental Monitoring and Audit Requirements

              Construction Phase

              Operation Phase

3.8         Conclusions

              Construction Phase

              Operation Phase

              Overall

4.           NOISE IMPACT

4.1         Introduction

4.2         Environmental Legislation, Standards and Guidelines1

4.3         Description of the Environment

4.4         Noise Sensitive Receivers (NSRs)

4.5         Assessment Methodology

4.6         Identification of Environmental Impacts

4.7         Prediction and Evaluation of Environmental Impacts

4.8         Mitigation of Adverse Environmental Impacts

4.9         Evaluation of Residual Impacts

4.10       Environmental Monitoring and Audit

4.11       Conclusion

5.           WATER QUALITY IMPACT

5.1         Introduction

5.2         Environmental Legislation, Standards and Guidelines

5.3         Description of the Environment

5.4         Identification of Water Sensitive Receivers

5.5         Assessment Approach and Methodology

5.6         Identification of Potential Impacts

5.7         Prediction and Evaluation of Potential Impacts

5.8         Cumulative Impact

5.9         Recommended Water Quality Mitigation Measures

5.10       Evaluation of Residual Impacts

5.11       Environmental Monitoring and Audit Requirements

5.12       Conclusion

6.           WASTE MANAGEMENT IMPLICATION AND LAND CONTAMINATION

6.1         Introduction

6.2         Environmental Legislation and Guidelines

6.3         Assessment Approach and Methodology

6.4         Identification of Waste Sources

6.5         Prediction and Evaluation of Waste Impacts

6.6         Mitigation of Adverse Environmental Impacts

6.7         Evaluation of Residual Impacts

6.8         Environmental Monitoring and Audit Requirements

6.9         Land Contamination

6.10       Conclusion

6.11       References. 6-19

7.           LANDSCAPE AND VISUAL IMPACTS

7.1         Introduction

7.2         Environmental Legislation, Standards and Guidelines

7.3         Assessment Methodology

7.4         Scope and Content of the Study

7.5         Review of Planning and Development Control Framework

7.6         Baseline Study

7.7         Landscape Impact Assessment

7.8         Visual Impact Assessment

7.9         Landscape and Visual Mitigation Measures

7.10       Residual Impacts

7.11       Environmental Monitoring and Audit

7.12       Conclusion

 

8.           LANDFILL GAS HAZARD ASSESSMENT

8.1         Introduction

8.2         Environmental Legislation, Standards and Guidelines

8.3         Evaluation of Environmental Impacts

8.4         Conclusion

9.           IMPACT ON CULTURAL HERITAGE

9.1         Introduction

9.2         Environmental Legislations and Standards

9.3         Assessment Criteria and Methodology

9.4         Results of the Desk-Based Study

9.5         Impact Assessment

9.6         Recommended Mitigation Measures

9.7         Environmental Monitoring and Audit

9.8         Conclusion

10.         ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS

10.1       Introduction

10.2       Air Quality

10.3       Noise

10.4       Water Quality

10.5       Waste Management and Land Contamination

10.6       Landscape and Visual

10.7       Landfill Gas Hazard

10.8       Impact on Cultural Heritage

11.         ENVIRONEMNTAL OUTCOMES AND CONCLUSIONS

11.1       Introduction

11.2       Summary of Environmental Outcomes. 11-1

11.3       Principal Findings of the EIA Study

11.4       Environmental Monitoring and Audit

11.5       Overall Conclusion

12.         IMPLEMENTATION SCHEDULE AND RECOMMENDED MITIGATION MEASURES.

 

 


LIST OF TABLES

 

Table 2-1         Consideration on Permanent Traffic Arrangement

Table 2-2         Consideration on Alignment Design Standard

Table 2-3         Consideration on Traffic Impact at Construction Stage

Table 2-4         Consideration on Other Operational Factors

Table 2-5         Consideration on Bridge Scheme

Table 2-6         Consideration on Noise Mitigation Measure

Table 2-7         Consideration on Bridge Scheme

Table 2-8         Consideration on Other Elements

Table 2-9         Consideration on Land Requirement

Table 2-10a      Consideration on Environmental Impact

Table 2-10b     Rankings of Factors of Environmental Impacts

Table 2-11        Consideration on Capital and Recurrent Cost

Table 2-12       Consideration on Maintenance Consideration

Table 2-13       Consideration on Time for Completion

Table 2-14       Overall Marking and Overall Ranking for Identified Options

Table 2-15       Major Concurrent Projects

Table 3-1         Hong Kong Air Quality Objectives

Table 3-2         5-year Background Air Quality Data from Kwai Chung Air Quality Monitoring Station

Table 3-3         Representative Air Sensitive Receivers

Table 3-4         Comparison of Road Traffic Flows and Traffic Speeds between “With Project” and “Without Project” Scenarios

Table 3-5         Total Emission Inventory for “Without” Project Scenario

Table 3-6         Total Emission Inventory for “With” Project Scenario

Table 3-7         Predicted Total Traffic Volume in Assessment Years

Table 3-8         Summary of Predicted Results from PATH Model in Year 2021

Table 3-9         Predicted Cumulative Air Pollutants Concentrations under “Without Project” Scenario at 1.5m above Ground in Year 2021

Table 3-10       Predicted Cumulative Air Pollutants Concentrations under “Without Project” Scenario at 5m above Ground in Year 2021

Table 3-11       Predicted Cumulative Air Pollutants Concentrations under “Without Project” Scenario at 10m above Ground in Year 2021

Table 3-12       Breakdown of Total NO2 Annual Average Concentration under “Without Project” Scenario in Year 2021

Table 3-13       Numbers of Predicted Annual Average NO2 Concentration in Compliance of AQOs under “Without Project” Scenario in Different Grids

Table 3-14       Predicted Cumulative Air Pollutants Concentrations under “With Project” Scenario at 1.5m above Ground in Year 2021

Table 3-15       Predicted Cumulative Air Pollutants Concentrations under “With Project”Scenario at 5m above Ground in Year 2021

Table 3-16       Predicted Cumulative Air Pollutants Concentrations under “With Project” Scenario at 10m above Ground in Year 2021

Table 3-17       Breakdown of Total NO2 Annual Average Concentration under “With Project” Scenario in Year 2021

Table 3-18       Difference of Annual Average NO2 between “Without Project” and “With Project” Scenarios in Year 2021

Table 4-1         Basic Noise Levels (BNLs) for ANLs

Table 4-2         Construction Noise Standards during Non-restricting Hours

Table 4-3         Road Traffic Noise Assessment Criteria Specified in the EIAO-TM

Table 4-4         Identified Representative Noise Sensitive Receivers

Table 4-5         Road Types of the Project Roads

Table 4-6         Maximum Noise Levels (dB(A)) during Construction without Noise Mitigation Measures

Table 4-7         Predicted Road Traffic Noise Levels at Each Identified NSR under the Unmitigated Scenario

Table 4-8         Maximum SWLs for Selected “Quiet” PME and Alternative Plants

Table 4-9         Noise Mitigation Measures for Certain PME during Construction Phase

Table 4-10       Maximum Noise Levels (dB(A)) during Construction with Noise Mitigation Measures Adopted

Table 4-11       Summary of Proposed Noise Mitigation Measures

Table 4-12       Predicted Road Traffic Noise Levels at Each Identified NSR under the Mitigated Scenario

Table 4-13       Total Number of Dwellings, Classrooms and Other Noise Sensitive Elements that will be Benefited From and be Protected by Provision of the Direct Noise Mitigation Measures

Table 4-14       Predicted Residual Construction Noise Period during Examination Period

Table 5-1         Summary of WQOs for Victoria Harbour (Phase One) WCZ

Table 5-2         WSD Standards at Flushing Water Intakes

Table 5-3         Marine Water Quality for Victoria Harbour (Phase One) WCZ in 2012 at VM12, VM14 and VT8

Table 6-1         Summary of Estimated Quantities of Waste Arising from Construction Phase

Table 6-2         Findings of Aerial Photographs Reviewed for the Site with Possible Excavation of Marine Sediment

Table 6-3         Tentative Estimated Timing of Waste Arising

Table 6-4         Findings of Aerial Photographs Reviewed for Project site

Table 6-5         List of Registered Chemical Waste Producers

Table 6-6         Potentially Contaminative Land Use along the Site

Table 7-1         Significance Thresholds

Table 7-2         Summaries of the Tree Survey Recommendations

Table 7-3         Potential Sources of Landscape Impacts during Construction Phase

Table 7-4         Potential Sources of Landscape Impacts during Operation Phase

Table 7-5         Magnitude of Landscape Impacts during Construction and Operation Phases

Table 7-6         Potential Sources of Visual Impacts during Construction Phase

Table 7-7         Potential Sources of Visual Impacts during Operation Phase

Table 7-8         Visual Sensitive Receivers (VSRs) and their Sensitivity

Table 7-9         Magnitude of Change on Visually Sensitive Receivers before Mitigation

Table 7-10       Proposed Construction Phase Mitigation Measures

Table 7-11       Proposed Operation Phase Mitigation Measures

Table 7-12       Significance of Landscape Impacts in Construction and Operation Phases (LRs & LCAs)

Table 7-13       Significance of Visual Impacts during Construction and Operation Phases (VSRs)

Table 11-1       Summary of Key Environmental Outcomes / Benefits

Table 12-1       Implementation Schedule for Air Quality Control

Table 12-2       Implementation Schedule for Noise Control

Table 12-3       Implementation Schedule for Water Quality Control

Table 12-4       Implementation Schedule of Waste Management and Land Contamination

Table 12-5       Implementation Schedule for Landscape and Visual Impact

 

 


APPENDICES

 

Appendix 2-1      Tentative Construction Programme

Appendix 3-1      Construction Area of Heavy Construction Activities

Appendix 3-2      Road Links and Traffic Breakdown of 16 Vehicle Types

Appendix 3-3      Chimney Survey and Emission Inventory

Appendix 3-4      Summary of 2020 Hong Kong Emission Inventory for the PATH Model

Appendix 3-5      Assumptions on the Adjusted PATH Model for Year 2021

Appendix 3-6      Estimation of Emission Factor

Appendix 3-7      Hourly Emission Factors in Grams per Miles per Vehicles

Appendix 3-8      Cumulative Results for Separated Grids at Different Levels for “Without Project” Scenario in Year 2021

Appendix 3-9      Detailed Breakdown from Background, Road and Chimney Emissions for "Without Project" Scenario in Year 2021

Appendix 3-10    Comparison of Cumulative Impact Result of NO2 Annual Average of Different Levels in “Without Project” in the Year of 2021, 2029 and 2036

Appendix 3-11    Cumulative Results for Separated Grids at Different Levels for “With Project” Scenario in Year 2021

Appendix 3-12    Detailed Breakdown from Background, Road and Chimney Emissions for "With Project" Scenario in Year 2021

Appendix 3-13    Comparison of Cumulative Impact Result of NO2 Annual Average between “Without Project” and “With Project” Scenarios at 1.5m, 5m and 10m in Year 2021

Appendix 4-1      Photographs of Identified Noise Sensitive Receivers

Appendix 4-2      Traffic Forecast for Assessment Year 2036

Appendix 4-3      Endorsement Letter from Traffic Department regarding Traffic Forecast

Appendix 4-4      Correspondence with Highways Department regarding Existing or Planned Noise Mitigation Measures

Appendix 4-5      Road-Plots of Road Traffic Noise Model

Appendix 4-6      Correspondence for the Concurrent Project - Replacement and Rehabilitation of Water Mains Stage 4

Appendix 4-7      Detailed Construction Noise Calculations (Unmitigated Scenario)

Appendix 4-8      Detailed Predicted Road Traffic Noise Results at Each Noise Assessment Point under the Unmitigated Scenario

Appendix 4-9      Detailed Construction Noise Calculations (Mitigated Scenario)

Appendix 4-10    Detailed Predicted Road Traffic Noise Results at Each Noise Assessment Point under the Mitigated Scenario

Appendix 6-1      Risk-Based Remediation Goals (RBRGs) for Soil & Soil Saturation Limit

Appendix 6-2      Aerial Photograph Interpretation

Appendix 6-3      Letters for LandsD, EPD and FSD

Appendix 6-4      Site Walkover Checklist and Photographs

Appendix 6-5      Memo between LandsD and CGE/Standards & Testing of CEDD regarding Land Contamination Issue of Public Works Regional Laboratory of Tsuen Wan

Appendix 8-1      Consultation Zone of Gin Drinkers Bay Landfill

 

                           

 

VOLUME 2 of 2


LIST OF FIGURES

 

Figure 2.1            Proposed Road Works

Figure 2.2            Sections of Proposed Road Works

Figure 2.3            Option 1: Separate Viaduct on East Side of TWR (design speed 50 km/h)

Figure 2.4            Option 1A: Separate Viaduct on East Side of TWR (design speed 70 km/h)

Figure 2.5            Option 2: Separate Viaduct on West Side of TWR (design speed 50 km/h)

Figure 2.6            Option 2A: Separate Viaduct on West Side of TWR (design speed 70 km/h)

Figure 2.7            Option 2B: Separate Viaduct on West Side of TWR and merging nearside lane of TWR with KCR Upramp (design speed 70 km/h)

Figure 2.8            Option 3: Widening along both Nearside and Offside Lanes of TWR (design speed 70 km/h)

Figure 2.9            Option 3A: Widening along both Nearside and Offside Lanes of TWR and Merging Nearside Lane of TWR with KCR Upramp (design speed 70 km/h)

Figure 3.1            Locations of Air Sensitive Receivers (ASRs)

Figure 3.2            Road Links of Vehicular Emission Model

Figure 3.3            Major Roads with Predicted Traffic Flow Changes Due to the Project

Figure 3.4            Locations of Chimneys within the 500m Study Area

Figure 3.5            Grids of PATH Model Data within the 500m Study Area

Figure 3.6            Open Roads at Ground Level

Figure 3.7            Open Roads on Lai King Hill

Figure 3.8            Contour of Cumulative Maximum Hourly Average NO2 at 10m above ground (Without Project Scenario in year 2021)

Figure 3.9            Contour of Cumulative 19th Highest Hourly Average NO2 at 10m above ground (Without Project Scenario in year 2021)

Figure 3.10          Contour of Cumulative Annual Average NO2 at 10m above ground (Without Project Scenario in year 2021)

Figure 3.11          Contour of Cumulative Maximum Daily Average RSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.12          Contour of Cumulative 10th Highest Daily Average RSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.13          Contour of Cumulative Annual Average RSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.14          Contour of Cumulative Maximum Daily Average FSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.15          Contour of Cumulative 10th Highest Daily Average FSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.16          Contour of Cumulative Annual Average FSP at 10m above ground (Without Project Scenario in year 2021)

Figure 3.17          Contour of Cumulative 19th Highest Hourly Average NO2 at 10m above ground (Without Project Scenario in year 2029)

Figure 3.18          Contour of Cumulative Annual Average NO2 at 10m above ground (Without Project Scenario in year 2029)

Figure 3.19          Contour of Cumulative 19th Highest Hourly Average NO2 at 10m above ground (Without Project Scenario in year 2036)

Figure 3.20          Contour of Cumulative Annual Average NO2at 10m above ground (Without Project Scenario in year 2036)

Figure 3.21          Contour of Cumulative Maximum Hourly Average NO2 at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.22          Contour of Cumulative 19th Highest Hourly Average NO2 at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.23          Contour of Cumulative Annual Average NO2 at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.24          Contour of Cumulative Maximum Daily Average RSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.25          Contour of Cumulative 10th Highest Daily Average RSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.26          Contour of Cumulative Annual Average RSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.27          Contour of Cumulative Maximum Daily Average FSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.28          Contour of Cumulative 10th Highest Daily Average FSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.29          Contour of Cumulative Annual Average FSP at 1.5m above ground (With Project Scenario in year 2021)

Figure 3.30          Contour of Cumulative Maximum Hourly Average NO2 at 10m above ground (With Project Scenario in year 2021)

Figure 3.31          Contour of Cumulative 19th Highest Hourly Average NO2 at 10m above ground (With Project Scenario in year 2021)

Figure 3.32          Contour of Cumulative Annual Average NO2 at 10m above ground (With Project Scenario in year 2021)

Figure 3.33          Contour of Cumulative Maximum Daily Average RSP at 10m above ground (With Project Scenario in year 2021)

Figure 3.34          Contour of Cumulative 10th Highest Daily Average RSP at 10m above ground (With Project Scenario in year 2021)

Figure 3.35          Contour of Cumulative Annual Average RSP at 10m above ground (With Project Scenario in year 2021)

Figure 3.36          Contour of Cumulative Maximum Daily Average FSP at 10m above ground (With Project Scenario in year 2021)

Figure 3.37          Contour of Cumulative 10th Highest Daily Average FSP at 10m above ground (With Project Scenario in year 2021)

Figure 3.38          Contour of Cumulative Annual Average FSP at 10m above ground (With Project Scenario in year 2021)

Figure 4.1            Project Boundary, 300m Study Boundary, and Locations of Noise Sensitive Receivers

Figure 4.2            Locations of Assessment Points of Each NSR (Key Plan, Sheets 1 and 2)

Figure 4.3            Locations of Construction Work areas and Noise Assessment Points

Figure 4.4A         Proposed Locations of Noise Mitigation Measures

Figure 4.4B          Section Views of Proposed Vertical and Cantilevered Barriers

Figure 5.1            Water Control Zone and Water Sensitive Receivers

Figure 6.1            Proposed Locations of Works with Possible Marine Sediment Excavation

Figure 6.2            Location of Public Works Regional Laboratory of Tsuen Wan

Figure 7.1            Layout Plan for LVIA

Figure 7.2            Landscape Resources Plan

Figure 7.3            Landscape Character Areas Plans

Figure 7.4            Visual Sensitive Receivers Plans

Figure 7.5A         Photographic Records of Key Landscape Resources (Sheet 1 of 2)

Figure 7.5B          Photographic Records of Key Landscape Resources (Sheet 2 of 2)

 

Figure 7.6            Photographic Records of Landscape Character Areas

Figure 7.7A         Photographic Records of Key Visually Sensitive Receivers (Sheet 1 of 3)

Figure 7.7B          Photographic Records of Key Visually Sensitive Receivers (Sheet 2 of 3)

Figure 7.7C          Photographic Records of Key Visually Sensitive Receivers (Sheet 3 of 3)

Figure 7.8A         Tree Survey Layout Plan

Figure 7.8B          Landscape Master Plan

Figure 7.9            Mitigation Details

Figure 7.10          Potential Landscape Impacts without Mitigation in Construction Phase

Figure 7.11          Potential Landscape Impacts without Mitigation in Operation Phase

Figure 7.12          Potential Visual Impacts and Sensitivities without Mitigation in Construction Phase

Figure 7.13          Potential Visual Impacts and Sensitivities without Mitigation in Operation Phase

Figure 7.14          Residual Landscape Impacts and Sensitivities with Mitigation in Construction Phase

Figure 7.15A       Residual Landscape Impacts and Sensitivities with Mitigation in Operation Phase (Day 1)

Figure 7.15B        Residual Landscape Impacts and Sensitivities with Mitigation in Operation Phase (Year 10)

Figure 7.16          Residual Visual Impacts and Sensitivities with Mitigation in Construction Phase

Figure 7.17A       Residual Visual Impacts and Sensitivities with Mitigation in Operation Phase (Day 1)

Figure 7.17B        Residual Visual Impacts and Sensitivities with Mitigation in Operation Phase(Year 10)

Figure 7.18          Photomontages of Proposed Flyover from Kwai Tsing Interchange Upramp to Kwai Chung Road

Figure 8.1A         Gin Drinkers Bay Landfill Consultation Zone and Project Construction Boundary

Figure 8.1B          Gin Drinkers Bay Landfill Consultation Zone and Project Construction Boundary (zoom in)

Figure 9.1            Assessment Areas for Cultural Heritage

 


LIST OF ABBREVIATIONS

 

AAB                    Antiquities Advisory Board

AMO                   Antiquities and Monuments Office

ANLs                  Acceptable Noise Levels

AOI                     Area of Influence

APCO                 Air Pollution Control Ordinance

API                      Aerial Photograph Interpretation

AQOs                  Air Quality Objectives

ASR                    Air Sensitive Receiver in air section; Area Sensitivity Rating in noise section

bgl                       Below Ground Level

BHIA                  Built Heritage Impact Assessment

CAC                    Community Affairs Committee

CDG                    Completely Decomposed Granite

CEDD                 Civil Engineering and Development Department

CHIA                  Cultural Heritage Impact Assessment

C&D                    Construction and Demolition

CNLs                   Corrected Noise Levels

CNP                    Construction Noise Permit

CP                       Construction Phase

CRTN                  Calculation of Road Traffic Noise

CWTC                 Chemical Waste Treatment Centre

DA-TM               Technical Memorandum on Noise from Construction Work in Designated Areas

DASO                 Dumping at Sea Ordinance

DCS                    Drake Chemical Superfund

DCVs                  Diesel Commercial Vehicles

DevB                   Development Bureau

DNMM               Direct Noise Mitigation Measure

DP                       Designated Project

DO                      Dissolved Oxygen

DSD                    Drainage Services Department

EIA                     Environmental Impact Assessment

EIAO                  Environmental Impact Assessment Ordinance

EIAO-TM           Technical Memorandum on Environmental Impact Assessment Process

EM&A                Environmental Monitoring and Audit

EMP                    Environmental Management Plan

EP                        Environmental Permit

EPD                     Environmental Protection Department

ETWB TC(W)     Environment Transport and Works Bureau Technical Circular (Works)

FSD                     Fire Services Department

GCO                    Geotechnical Control Office

GEO                    Geotechnical Engineering Office

GI                        Geotechnical Investigation

GIU                     Geotechnical Information Unit

GW-TM               Noise from Construction Work Other Than Percussive Piling

GN-CH               Guidance Notes on Assessment of Impact on Site of Cultural Heritage in Environmental Impact Assessment Studies

HATS                  Harbour Area Treatment Scheme

HD                      Housing Department

HDG                   Highly Decomposed Granite

HIA                     Heritage Impact Assessment

HOS                    Home Ownership Scheme

HyD                    Highways Department

HKGS                 Hong Kong Geological Survey

HKPSG               Hong Kong Planning Standards and Guidelines

HKUST               Hong Kong University of Science and Technology

IAQM                 Institute of Air Quality Management

KCAQMS           Kwai Chung Air Quality Monitoring Station

KCCT                  Kwai Chung Container Terminal

KCR                    Kwai Chung Road

KTDC                 Kwai Tsing District Council

KT I/C                 Kwai Tsing Interchange

L                          Leisure

LandsD               Lands Department

LCA                    Landscape Character Area

LCSD                  Leisure and Cultural Services Department

LFG                     Landfill Gas

LNRS                  Low Noise Road Surfacing

LPG                     Liquefied Petroleum Gas

LPMIS                Landslip Preventive Measures Information System

LR                       Landscape Resource

LVIA                  Landscape and Visual Impact Assessment

MDG                   Moderately Decomposed Granite

MTRCL               Mass Transit Railway Corporation Limited

NAAQS              National Ambient Air Quality Standards

NCA                    Noise Control Authority

NCO                    Noise Control Ordinance

NIW                    Noise Insulation Works

NMM                  Noise Mitigation Measures

NSR                    Noise Sensitive Receivers

O                         Occupational

OGV                   Ocean Going Vessels

OLM                   Ozone Limiting Method

OP                       Operation Phase

OVTs                   Old and Valuable Trees

OZP                     Outline Zoning Plan

PAHs                   Polycyclic Aromatic Hydrocarbons

PCB                     Polychlorinated Biphenyl

PCW                    Prescribed Construction Works

PCRs                   Petroleum Carbon Ranges

PFA                     Pulverised Fuel Ash

PFC                     Public Fill Committee

PFRFs                 Public Fill Reception Facilities

PlanD                  Planning Department

PME                    Powered Mechanical Equipment

PRD                    Pearl River Delta

ProPECC PN 1/9        Practice Note for Professional Persons on Construction Site Drainage

RBRGs                Risk-Based Remediation Goals

PPE                     Personal Protective Equipment

PP-TM                 Technical Memoranda on Noise from Percussive Piling

PSPS                   Private Sector Participation Scheme

QPME                 Quiet Powered Mechanical Equipment

R                          Residential

SB                       Southbound

SCISTW              Stonecutters Island Sewage Treatment Works

SDG                    Slightly Decomposed Granite

SI                         Site Investigation

SIL                      Significant Impact Level

SIS                      Slope Information System

SMRIS                Slope Maintenance Responsibility Information System

SPME                  Specified Powered Mechanical Equipment

SPT                      Standard Penetration Test

SW                      Scott Wilson Limited

SW-NE                Southwest & Northeast

SWL                    Sound Power Level

SVOCs                Semi-volatile Organic Compounds

T                          Transportation

TBT                     Tributyltin

TC                       Technical Circular

TD                       Transport Department

TIA                      Traffic Impact Assessment

TIN                      Total Inorganic Nitrogen

TK H/W              Tsing Kwai Interchange

TM                       Technical Memorandum

TM-DSS              Technical Memorandum on Standards for Effluents Discharged into Drainage and Sewerage Systems, Inland and Coastal Waters

TPDM                 Transport Planning and Design Manual

TMR                    Turn Mun Road

TWR                    Tsuen Wan Road

T&TC                  Transport & Traffic Committee

UCS                    Unconfined Compressive Strength

ULSD                  Ultra Low Sulphur Diesel

USEPA               US Environmental Protection Agency

UTS                     Universal Treatment Standards

v/c                        Volume/Capacity

VE                       Visual Envelope

VIC                     Visual Impacts during Construction Phase

VIO                     Visual Impacts during Operation Phase

VKT                    Vehicle Kilometres Travelled

VOCs                  Volatile Organic Compounds

VSRs                   Visual Sensitive Receivers

WBTC                 Works Branch Technical Circular

WCZs                  Water Control Zones

WDO                   Waste Disposal Ordinance

WMP                   Waste Management Plan

WPCO                 Water Pollution Control Ordinance (Cap.358)

WQOs                 Water Quality Objectives

WSD                   Water Supplies Department

WSRs                  Water Sensitive Receivers

UIA                     Utility Impact Assessment

ZVI                     Zone of Visual Influence