Contents

Nomenclature and Abbreviations

              

1             Introduction                                                                                                                  

2             Project Description                                                                                                       

3             Consideration of Alternatives and Implementation Programme                                  

4             Air Quality Impact                                                                                                        

5             Noise Impact                                                                                                                 

6             Water Quality Impact                                                                                                   

7             Waste Management                                                                                                      

8             Land Contamination                                                                                                     

9             Ecology                                                                                                                         

10           Landscape and Visual Impact Assessment                                                                   

11           Cultural Heritage                                                                                                          

12           Environmental Monitoring & Auditing Requirements                                                 

13           Summary of Environmental Outcomes                                                                         

14           Conclusion                                                                                                                    

 

 

 


Figures

Figure 2.1            Location of the Project

Figure 2.2            Pedestrian Corridor along Yuen Long Town Nullah Pedestrian Interchange General Arrangement Sheet 1 of 2

Figure 2.3            Pedestrian Corridor along Yuen Long Town Nullah Pedestrian Interchange General Arrangement Sheet 2 of 2

Figure 3.1            Concurrent Projects

Figure 3.2            Foundation Location

Figure 4.1            Locations of Representative Air Sensitive Receivers

Figure 5.1            Locations of Representative Noise Sensitive Receivers and Assessment Point

Figure 6.1            Locations of Water Quality Sensitive Receivers

Figure 7.1            As-Built Land-based Sediment Sampling Location

Figure 9.1            Locations of Recognized Sites of Conservation Importance

Figure 9.2            Habitat Map

Figure 10.1101    Landscape and Visual Impact Study Area

Figure 10.1102    Aerial Photos

Figure 10.1103    Review of Planning and Development Framework Plan

Figure 10.1201    Baseline Landscape Resources

Figure 10.1202    Baseline Landscape Resources Photos (Sheet 1 of 3)

Figure 10.1203    Baseline Landscape Resources Photos (Sheet 2 of 3)

Figure 10.1204    Baseline Landscape Resources Photos (Sheet 3 of 3)

Figure 10.1301    Baseline Landscape Character Areas

Figure 10.1302    Baseline Landscape Character Areas Photos (Sheet 1 of 2)

Figure 10.1303    Baseline Landscape Character Areas Photos (Sheet 2 of 2)

Figure 10.1401    Baseline Key VSRs and Viewpoints at Local Level with Development Proposal Overlaid During Construction

Figure 10.1401a  Baseline Key VSRs and Viewpoints at Local Level with Development Proposal Overlaid During Construction

Figure 10.1402    Baseline Key VSRs Photo at Local Level (Sheet 1 of 6)

Figure 10.1403    Baseline Key VSRs Photo at Local Level (Sheet 2 of 6)

Figure 10.1404    Baseline Key VSRs Photo at Local Level (Sheet 3 of 6)

Figure 10.1405    Baseline Key VSRs Photo at Local Level (Sheet 4 of 6)

Figure 10.1406    Baseline Key VSRs Photo at Local Level (Sheet 5 of 6)

Figure 10.1407    Baseline Key VSRs Photo at Local Level (Sheet 6 of 6)

Figure 10.1601    Residual Impacts on Landscape Resources with Mitigation Measures in Year 10

Figure 10.1611    Residual Impacts on Landscape Character Areas with Mitigation Measures in Year 10

Figure 10.1621    Residual Impacts on VSRs at Local Level with Mitigation Measures in Year 10

Figure 10.1621a   Residual Impacts on VSRs at Local Level with Mitigation Measures in Year 10

Figure 10.1701    Key Plan of Photomontage and Model Viewpoints

Figure 10.1701a   Key Plan of Photomontage and Model Viewpoints

Figure 10.1702    Viewpoint No.1 Photomontage from REC1 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1703    Viewpoint No.1 Photomontage from REC1 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1704    Viewpoint No.2 Photomontage from REC3 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1705    Viewpoint No.2 Photomontage from REC3 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1706    Viewpoint No.3 Photomontage from REC4 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1707    Viewpoint No.3 Photomontage from REC4 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1708    Viewpoint No.4 Photomontage from REC7 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1709    Viewpoint No.4 Photomontage from REC7 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1710    Viewpoint No.5 Photomontage from REC9 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1711    Viewpoint No.5 Photomontage from REC9 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1712    Viewpoint No.6 Photomontage from REC2 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1713    Viewpoint No.6 Photomontage from REC2 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1714    Viewpoint No.7 Photomontage from REC5 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1715    Viewpoint No.7 Photomontage from REC5 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1716    Viewpoint No.8 Photomontage from REC6 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1717    Viewpoint No.8 Photomontage from REC6 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1718    Viewpoint No.9 Photomontage from REC8 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1719    Viewpoint No.9 Photomontage from REC8 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1720    Viewpoint No.10 Photomontage from REC10 Existing and without Mitigation Measures (Sheet 1 of 2)

Figure 10.1721    Viewpoint No.10 Photomontage from REC10 Day 1 and Year 10 with Mitigation Measures (Sheet 2 of 2)

Figure 10.1801    Master Landscape Plan (Sheet 1 of 6)

Figure 10.1802    Master Landscape Plan (Sheet 2 of 6)

Figure 10.1803    Master Landscape Plan (Sheet 3 of 6)

Figure 10.1804    Master Landscape Plan (Sheet 4 of 6)

Figure 10.1805    Master Landscape Plan (Sheet 5 of 6)

Figure 10.1806    Master Landscape Plan (Sheet 6 of 6)

Figure 10.1807    Landscape Section (Sheet 1 of 2)

Figure 10.1808    Landscape Section (Sheet 2 of 2)

Figure 11.1          Locations of Historic Buildings

Figure 11.2          Boundary of Historic Building CH01

Figure 11.3          Boundary of Historic Building CH02

 

Appendices

Appendix 1.1      Technical Memorandum and Study Brief Compliance Checklist

Appendix 4.1      Details of Construction Programme and Active Working Area

Appendix 5.1      Photos of selected representative NSRs

Appendix 5.2      SWL of PME

Appendix 5.3      Plant Inventory

Appendix 5.4      Locations of work Fronts

Appendix 5.5      Notional Distances between work fronts and NSRs

Appendix 5.6      Unmitigated Construction Noise Impact

Appendix 5.7      Sketch of Typical Temporary Noise Barrier or Enclosure

Appendix 5.8      Mitigated Construction Noise Impact

Appendix 7.1      Sediment Sampling and Testing Plan

Appendix 7.2      Summary of Sediment Chemical Testing Result

Appendix 7.3      Laboratory Report

Appendix 7.4      Ground Investigation Report

Appendix 8.1      Historical Aerial Photographs

Appendix 8.2      Correspondences with Government Departments

Appendix 10.1    Tree Survey Information

Appendix 10.2    Drainage and Sewerage Layout Plan

Appendix 11.1    Detail Information of Histroic Building CH01

Appendix 11.2    Detail Information of Histroic Building CH02

Appendix 12.1    Project Implementation Schedule