1      Introduction.. 1-1

1.1      Background. 1-1

1.2      The Project 1-1

1.3      Designated Projects. 1-1

1.4      Objectives of the EIA Study. 1-2

1.5      Scope of the EIA Study. 1-3

1.6      Structure of EIA Report 1-4

2      project description.. 2-1

2.1      General Description of the Project 2-1

2.2      Need of the Project 2-1

2.3      Project Programme. 2-2

2.4      Concurrent Projects. 2-2

2.5      Consideration of Alternative Development Options. 2-3

2.6      Consideration of Alternative Construction Methods and Sequences of Works. 2-5

2.7      Selection of Preferred Scenario. 2-7

3      Air Quality Impact Assessment.. 3-1

3.1       Introduction. 3-1

3.2       Environmental Legislation, Policies, Plans, Standards and Criteria. 3-1

3.3       Identification of Key Air Pollution Parameters. 3-3

3.4       Air Sensitive Receivers. 3-5

3.5       Projected Background Air Quality Result of Year 2021 by PATH Model 3-8

3.6       Sensitivity test for Determination of the Worst Assessment Year 3-8

3.7       Construction Phase Assessment 3-10

3.8       Operational Phase Assessment 3-19

3.9       Conclusion. 3-38

4.     Hazard to life Assessment.. 4-1

4.1      Introduction. 4-1

4.2      Legislation, Standards and Criteria. 4-1

4.3      Review of Hazard to Life assessment Findings in Previous EIA Study. 4-1

4.4      Review of Existing and Planned Hazard Source in KTD.. 4-4

4.5      Conclusion. 4-5

5      Noise Impact Assessment.. 5-1

5.1       Introduction. 5-1

5.2       Environmental Legislation, Policies, Standards and Criteria. 5-1

5.3       Description of the Environment 5-5

5.4       Noise Sensitive Receivers. 5-5

5.5       Assessment Methodology. 5-11

5.6       Acoustic Design for the Project 5-17

5.7       Identification of Environmental Impacts. 5-18

5.8       Prediction and Evaluation of Environmental Impacts. 5-19

5.9       Mitigation of Environmental Impacts. 5-29

5.10     Evaluation of Residual Impacts. 5-36

5.11     Environmental Monitoring and Audit 5-37

5.12     Conclusion. 5-38

6        Water Quality Impact Assessment.. 6-1

6.1        Introduction. 6-1

6.2        Water Quality Objectives. 6-2

6.3        Description of Environment 6-4

6.4        Water Quality Sensitive Receivers. 6-9

6.5        Assessment Methodology. 6-9

6.6        Identification of Water Quality Impacts. 6-10

6.7        Mitigation Measures for Adverse Environmental Impacts. 6-14

6.8        Cumulative Impacts. 6-19

6.9        Residual Impacts. 6-20

6.10     Conclusion. 6-21

6.11     Recommendation. 6-21

7      SEWERAGE AND SEWAGE TREATMENT IMPLICATIONS. 7-1

7.1      Introduction. 7-1

7.2      Sewerage Layout 7-1

7.3      Population and Employment Data. 7-2

7.4      Sewage Flow Estimation. 7-5

7.5      Preliminary Sewerage Design. 7-9

7.6      Conclusion. 7-10

8        Waste management Implications. 8-1

8.1        Introduction. 8-1

8.2        Environmental Legislation, Policies, Plans, Standards and Criteria. 8-1

8.3        Assessment Methodology. 8-3

8.4        Identification of Key Environmental Impacts. 8-7

8.5        Mitigation Measures of Environmental Impacts. 8-16

8.6        Recommendation. 8-18

9        Land contamination assessment.. 9-1

9.1        Introduction. 9-1

9.2        Methodology. 9-1

9.3        Land Uses. 9-1

9.4        Review of Previous EIA Studies. 9-2

9.5        Potential Contaminative Land Uses. 9-5

9.6        Impact Assessment 9-6

9.7        Summary of Findings. 9-8

9.8        Conclusion. 9-9

10    Terrestrial Ecological Impact Assessment.. 10-1

10.1    Introduction. 10-1

10.2    Relevant Legislations, Standards & Guidelines. 10-1

10.3    Study Area & Site of Conservation Importance. 10-2

10.4    Literature Review.. 10-2

10.5    Methodology for Terrestrial Surveys. 10-7

10.6    Survey Results – Habitats & Vegetation. 10-9

10.7    Survey Results – Fauna. 10-11

10.8    Evaluation of Habitat 10-14

10.9    Identification of Ecological Impacts. 10-16

10.10  Evaluation of Ecological Impacts. 10-20

10.11  Recommendations & Mitigation Measures. 10-22

10.12  Evaluation of Residual Impacts. 10-23

10.13  Environmental Monitoring and Audit Programme. 10-23

10.14  Conclusion. 10-23

10.15  References. 10-24

11    landscape and visual Impact Assessment.. 1

11.1    Introduction. 11-1

11.2    Criteria and Methodology. 11-3

11.3    Landscape Impact 11-6

11.4    Visual Impact 11-8

11.5    Glare Impact 11-11

11.6    Acceptability of Impacts. 11-13

11.7    Review of Planning and Development Control Framework. 11-14

11.8    Baseline Condition. 11-20

11.9    Impact Assessment 11-63

11.10  Cumulative Impacts. 11-106

11.11  Environmental Monitoring and Audit 11-106

11.12  Recommendation. 11-107

12     cultural heritage Impact Assessment.. 12-1

12.1     Introduction. 12-1

12.2     Methodology. 12-1

12.3     Desktop Study. 12-2

12.4     Historical Review.. 12-8

12.5     Impact Assessment 12-13

12.6     Recommendation. 12-13

12.7     Reference. 12-14

13    ENVIRONMENTAL MONITORING and AUDIT REQUIREMENTs. 13-1

13.1    Introduction. 13-1

13.2    Air Quality Impact 13-1

13.3    Hazard to Life. 13-1

13.4    Noise Impact 13-1

13.5    Water Quality Impact Assessment 13-1

13.6    Sewerage and Sewage Treatment Implications. 13-2

13.7    Waste Management Implications. 13-2

13.8    Land Contamination Assessment 13-2

13.9    Terrestrial Ecological Impact Assessment 13-3

13.10  Landscape and Visual Impact Assessment 13-3

13.11  Cultural Heritage Impact Assessment 13-4

14    Implementation Schedule of Mitigation Measures. 14-1

14.1     Introduction. 14-1

15    ENVIRONMENTAL outcomes. 15-1

15.1     Environmental Designs Recommended and Environmentally Friendly Options Considered  15-1

15.2    Documentation of Key Assessment Assumptions, Limitation of Assessment Methodologies and Related Prior Agreement(s) with the Director 15-3

15.3    Individual Environmental Concerns and Key Environmental Problems Avoided/Minimized  15-3

16    conclusions. 16-1

16.1    General 16-1

16.2    Air Quality Impact Assessment 16-1

16.3    Hazard to Life Assessment 16-2

16.4    Noise Impact Assessment 16-3

16.5    Water Quality Impact Assessment 16-4

16.6    Sewerage and Sewage Treatment Implications. 16-4

16.7    Waste Management Implications. 16-5

16.8    Land Contamination Assessment 16-5

16.9    Terrestrial Ecological Impact Assessment 16-6

16.10  Landscape and Visual Impact Assessment 16-6

16.11  Cultural Heritage Impact Assessment 16-7

16.12  Environmental Monitoring and Audit Requirement 16-7

 


 

LIST OF TABLES

 

Table 2-1                List of Concurrent Projects

Table 3-1                Hong Kong Air Quality Objectives

Table 3-2                Summary of Air Sensitive Receivers

Table 3-3                Summary of Predicted Results from PATH Model in Year 2020

Table 3-4                Emission Factors for Dusty Construction Activities

Table 3-5                Unmitigated Cumulative Hourly TSP at ASRs (With Background)

Table 3-6                Unmitigated Cumulative Daily and Annual RSP at ASRs (With Background)

Table 3-7                Unmitigated Cumulative Daily and Annual FSP at ASRs (With Background)

Table 3-8                Mitigated Cumulative Hourly TSP at ASRs (With Background)

Table 3-9                Mitigated Cumulative Daily and Annual RSP at ASRs (With Background)

Table 3-10              Mitigated Cumulative Daily and Annual FSP at ASRs (With Background)

Table 3-11              Predicted Cumulative Air Pollutants Concentrations under “Without Project” Scenario at the Worst Level in Year 2023

Table 3-12              Predicted Cumulative Air Pollutants Concentrations under “With Project” Scenario at the Worst Level in Year 2023

Table 3-13              Details of Exceedance Zones at the Worst Level in the Worst Assessment Year (2023)

Table 3-14              Comparison of Annual NO2 Concentrations between “With Project” and “Without Project” (Year 2023) for ASRs with Annual NO2 Exceedance

Table 3-15              Comparison of Annual NO2 Concentrations between “With Project” and “Without Project” (Year 2036)

Table 3-16              Number of Representative ASRs exceeding AQO Criteria for Annual NO2

Table 3-17              Details of Exceedance Zones in Year 2036

Table 4-1                Hazardous Sources Identified in the Kai Tak Development EIA Report

Table 5‑1                Construction Noise Standards during Non-Restricted Hours

Table 5‑2                Acceptable Noise Levels and Adopted Criteria for Fixed Noise Sources

Table 5‑3                Area Sensitivity Ratings

Table 5‑4                Representative Noise Sensitive Receivers for Construction Noise Assessment

Table 5‑5                Representative Noise Sensitive Receivers for Operational Noise Assessment

Table 5‑6                Assessment Criteria for Representative Noise Sensitive Receivers

Table 5‑7                Noise Sensitive Receivers for Induced Traffic Noise Assessment

Table 5‑8                Concurrent Projects Considered during the Construction Phase

Table 5‑9                Parameters of PA Systems in the Main Stadium and the Public Sports Ground Assessment

Table 5‑10              Average SWL for the Air Handling Unit for Different Buildings

Table 5‑11              Parameters of Loudspeakers of Music Events in the Main Stadium

Table 5‑12              Unmitigated Construction Noise Impact, dB(A)

Table 5‑13              Unmitigated Road Traffic Noise Impact, dB(A)

Table 5‑14              Noise Levels from Sports Events at Main Stadium (Retractable Roof Fully Opened)

Table 5‑15              Noise Levels from Sports Events at Public Sports Ground

Table 5‑16              Unmitigated Fixed Plants Noise Level, dB(A)

Table 5‑17              Cumulative Noise Levels from Sports Events at Main Stadium and Fixed Plant

Table 5‑18              Cumulative Noise Levels from Sports Events at Public Sports Ground and the Fixed Plant

Table 5‑19              Noise Levels from Musical Events at Main Stadium (Retractable Roof Fully Opened)

Table 5‑20              Complaint Record of Noise from Crowds on Streets

Table 5‑21              Quality PME or Quiet Plant for Construction Work

Table 5‑22              Mitigated Construction Noise Impact from the Project, dB(A)

Table 5‑23              Cumulative Construction Noise Impact (Mitigated)

Table 5‑24              Breakdown of Cumulative Construction Noise Impact for the NSRs with Exceedance

Table 5‑25              Noise Levels at the Representative NSRs for Fixed Plants

Table 5‑26              Mitigated Cumulative Noise Levels from Sports Events at Main Stadium (Retractable Roof Fully Opened) and the Fixed Plant

Table 5‑27              Mitigated Cumulative Noise Levels from Sports Events at Public Sports Ground and the Fixed Plant

Table 6-1                Summary of Water Quality Objectives for Victoria Harbour WCZ

Table 6-2                WSD’s Water Quality Criteria for Flushing Water at Sea Water Intakes

Table 6-3                Assessment Criteria for Local Marine Biota and Fisheries Resources

Table 6-4                Summary Statistics of 2006 Marine Water Quality at the Kwun Tong and To Kwa Wan Typhoon Shelter

Table 6-5                Summary of EPD’s Routine Water Quality Data (VM1, VM2 and VT4) for Victoria Harbour WCZ (Kwun Tong Typhoon Shelter) (2010 and 2014)

Table 6-6                Summary of Pollution Load Surveys in 2005/06 and 2015

Table 6-7                Average DO Level at KTAC/KTTS (Unit: mg/l)

Table 6-8                Permeability Coefficient

Table 6-9                Relevant Marine Based and Land Based Projects Related to Water Quality

Table 7-1                Design Parameters of the Project

Table 7-2                Population Estimation of the Project

Table 7-3                Unit Flow Factors Adopted for the Project

Table 7-4                Estimated Sewage Flow from the Project

Table 7-5                Average Dry Weather Flows for Year 2031 and Ultimate Scenarios

Table 7-6                Projected Peak Flows for Year 2031 and Ultimate Scenarios in To Kwa Wan Preliminary Treatment Works, in m3/sec

Table 8-1                Development Parameters and Population Estimation of the Project

Table 8-2                Breakdown of Covered Area (Building Footprint) in m2

Table 8-3                Estimated Quantities of Inert C&D Materials

Table 8-4                Estimated Quantities of Non-inert C&D Materials

Table 8-5                Estimated Quantities of C&D Materials Generated

Table 8-6                Annual Disposal of C&D Materials during Construction

Table 8-7                Waste Generation Rates of Occupants

Table 8-8                Breakdown of Solid Waste Generated during Operation with Full House Sports Events

Table 9-1                Summary of Findings in Relevant EIA Reports

Table 9-2                Information on the EMSD Workshops at Sung Wong Toi Road (Extracted from KTD EIA)

Table 10-1              Conservation Statuses of Birds with Conservation Importance Recorded within/near the Study Area in Past Studies

Table 10-2              Conservation Statuses of Plants Recorded in the Study Area

Table 10-3              Conservation Statuses of Birds with Conservation Importance Recorded within the Study Area in Recent Surveys

Table 10-4              Ecological Value of Construction Sites

Table 10-5              Ecological Value of Developed Area and Abandoned Area

Table 10-6              Ecological Value of Watercourse and Artificial Coastline

Table 10-7              Evaluation of the Significance of Ecological Impact on Construction Sites

Table 10-8              Evaluation of the Significance of Ecological Impact on Developed Area and Abandoned Area

Table 10-9              Evaluation of the Significance of Ecological Impact on Watercourse and Artificial Coastline

Table 11-1              Relationship between Receptor Sensitivity and Impact Magnitude in Defining Impact Significance

Table 11-2              A Subjective Interpretation of the CIE’s Glare Rating System

Table 11-3              Limiting GRL Value for Lighting Installations

Table 11-4              Schedule of Administrative Planning Zones in 500m Study Area

Table 11-5              Schedule of Landscape Resources

Table 11-6              Landscape Resources and Their Sensitivity

Table 11-7              Schedule of Landscape Character Areas

Table 11-8              Summary of Assessment of Sensitivity of Landscape Character Areas

Table 11-9              Schedule of Identified Visually Sensitive Receivers (VSRs)

Table 11-10            Summary of Assessment of Sensitivity of Visually Sensitive Receivers (VSRs)

Table 11-11            The Environmental Zones Classifications E0 to E4

Table 11-12            Obtrusive Light Limitations for Exterior Lighting Installations in Zone E3

Table 11-13            Identified VSRs for Glare Impact Assessment

Table 11-14            Lighting from MPSC, According to Lighting Layout

Table 11-15            Schedule of Landscape Resources and Landscape Character Areas Impacted during Construction and Operation Phases

Table 11-16            Summary of Magnitude of Impacts to Landscape Resources before Mitigation

Table 11-17            Summary of Magnitude of Impacts on Landscape Character Areas Before Mitigation

Table 11-18            Summary of Magnitude of Impacts on Visually Sensitive Receivers Before Mitigation

Table 11-19            Predicted Glare Rating for VSRs near MPSC

Table 11-20            Significance Threshold of Landscape Resources and Landscape Character

Table 11-21            Significance Threshold of Visually Sensitive Receivers

Table 11-22            Recommended Construction Phase Landscape and Visual Mitigation / Enhancement Measures

Table 11-23            Recommended Operation Phase Landscape and Visual Mitigation / Enhancement Measures

Table 11-24            Significance of Residual Landscape Impacts

Table 11-25            Significance of Residual Visual Impacts

Table 12-1              Key Findings of Previous Archaeological Works (Extracted from Interim Report of an Archaeological Survey-cum-excavation and Additional Investigation in Sacred Hill (North) Area)

Table 14-1              Environment Mitigation Implementation Schedule

Table 15-1              Summary of Environmental Designs and Environmental Friendly Measures

Table 15-2              Environmental Concerns and Key Environmental Problems Avoided/ Minimized


 

LIST OF FIGURES

 

Figure 1-1              Location and Layout Plan of Proposed Kai Tak MPSC

Figure 2-1a             Master Layout Plan of the Kai Tak MPSC

Figure 2-1b            Master Layout Plan of the Kai Tak MPSC

Figure 2-2              Construction Phasing Plan

Figure 3-1              Study Area and Project Boundary

Figure 3-2A           Locations of Air Sensitive Receivers during Construction Phase

Figure 3-2B            Locations of Air Sensitive Receivers during Operational Phase

Figure 3-3              Locations of Dust Sources

Figure 3-4              Locations of Portals, Ventilation Buildings, Industrial Chimneys and Typhoon Shelter

Figure 3-5A           Cumulative Unmitigated Max. 1-hour TSP Concentration at 1.5 m above Ground in 2017

Figure 3-5B            Cumulative Unmitigated 10th Highest 24-hour RSP Concentration at 1.5 m above Ground in 2017

Figure 3-5C            Cumulative Unmitigated Annual Average RSP Concentration at 1.5 m above Ground in 2017

Figure 3-5D           Cumulative Unmitigated 10th Highest 24-hour FSP Concentration at 1.5 m above Ground in 2017

Figure 3-5E            Cumulative Unmitigated Annual Average FSP Concentration at 1.5 m above Ground in 2017

Figure 3-5F            Cumulative Mitigated Max. 1-hour TSP Concentration at 1.5 m above Ground in 2017

Figure 3-5G           Cumulative Mitigated 10th Highest 24-hour RSP Concentration at 1.5 m above Ground in 2017

Figure 3-5H           Cumulative Mitigated Annual Average RSP Concentration at 1.5 m above Ground in 2017

Figure 3-5I             Cumulative Mitigated 10th Highest 24-hour FSP Concentration at 1.5 m above Ground in 2017

Figure 3-5J             Cumulative Mitigated Annual Average FSP Concentration at 1.5 m above Ground in 2017

Figure 3-6A           19th maximum 1-hour NO2 concentration at 1.5mAG (“With Project and Full Event”)

Figure 3-6B            Annual NO2 concentration at 1.5mAG (“With Project and 60 Days Full Event”)

Figure 3-6C            10th maximum 24-hour RSP concentration at 1.5mAG (“With Project and Full Event”)

Figure 3-6D           Annual RSP concentration at 1.5mAG (“With Project and Full Event”)

Figure 3-6E            10th maximum 24-hour FSP concentration at 1.5mAG (“With Project and Full Event”)

Figure 3-6F            Annual FSP concentration at 1.5mAG (“With Project and Full Event”)

Figure 3-6G           4th maximum 10-minute SO2 concentration at 70mAG

Figure 3-6H           4th maximum 24-hour SO2 concentration at 70mAG

Figure 3-6I             19th maximum 1-hour NO2 concentration at 9.5mAG (“With Project and Full Event”)

Figure 3-6J             Annual NO2 concentration at 9.5mAG (“With Project and 60 Days Full Event”)

Figure 3-6K           Annual NO2 concentration at 1.5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2023

Figure 3-6L            Annual NO2 concentration at 5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2023

Figure 3-6M           Annual NO2 concentration at 1.5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2026

Figure 3-6N           Annual NO2 concentration at 5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2026

Figure 3-6O           Annual NO2 concentration at 1.5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2036

Figure 3-6P            Annual NO2 concentration at 5mAG for “Without Project” and “With Project and 60 Days Full Event” Scenarios in 2036

Figure 5-1a             Location of Noise Sensitive Receivers and Construction Zones of the Project

Figure 5-1b            Location of Noise Sensitive Receivers and Construction Zones of the Concurrent Projects

Figure 5-2              Location of Selected Representative NSRs for Operational Noise Impact Assessment

Figure 5-3              Prevailing Background Noise Measurement Location

Figure 5-4              Location of Noise Sensitive Receivers and Roads with Induced Traffic

Figure 5-5              Road Index Plan

Figure 5-6              Crowd Dispersion Route from Main Stadium in Night-time

Figure 5-7              Location of Noise Sensitive Receivers and the Planned Locations of the intake/exhaust of the District Cooling System

Figure 5-8              Constraints for Pedestrian’s Tunnel

Figure 5-9              Road Surface Type for the Traffic Noise Model

Figure 6-1-1           Study Area within 500m from Project Site Boundary

Figure 6-1-2           Water Control Zones in Hong Kong

Figure 6-3-1           Water Quality Monitoring Stations in Victoria Harbour

Figure 6-3-2           Location of Monitoring Stations in Kai Tak Approach Channel, To Kwa Wan Typhoon Shelter and Kwun Tong Typhoon Shelter

Figure 6-4-1           Water Quality Sensitive Receivers

Figure 6-7-1           Schematic Diagram for Stormwater Re-use Management System

Figure 6-7-2           Schematic Flow of Percolated Surface Water

Figure 6-7-3           Permeated Flow and Flow Estimation

Figure 6-7-4           Flow Chart for Self-contained Stormwater Re-use Management System

Figure 7-1-1           Location Plan

Figure 7-1-2           Master Layout Plan of the MPSC at +13.00 mPD

Figure 7-2-1           Sewerage Layout Plan – KTD

Figure 7-2-2           Sewerage Layout Plan – MPSC and Related Areas

Figure 8-1-1           Location Plan

Figure 8-1-2           Master Layout Plan of MPSC

Figure 8-3-1           Traffic Route to Barging Point Prior to Construction of Road D2 & D3

Figure 8-3-2           Traffic Route to Barging Point When Road D2 & D3 is not Available

Figure 8-4-1           Basement Layout

Figure 8-4-2           Existing GI Record

Figure 8-4-3           Borehole BH18

Figure 9-1              Location Plan of MPSC

Figure 9-2              Overlaying Layout Plan of MPSC on Study Area of NAKTA EIA

Figure 9-3              Overlaying Layout Plan of MPSC on Overall Remediation Area of NAKTA EIA

Figure 9-4              Potential Contaminated Sites near to MPSC Area

Figure 9-5              Locations of Potential Contaminated Sites Identified within / at close proximity to the Project Area

Figure 10-1            Ecological Survey Plan

Figure 10-2            Habitat Map and Locations of Species with Conservation Importance

Figure 11-1-1         Landscape Impact Study Area

Figure 11-3-1         Planning and Development Framework

Figure 11-4-1         Physical and Cultural Landscape Resources

Figure 11-4-2         Photographic Record of Identified Landscape Resources - 1

Figure 11-4-3         Photographic Record of Identified Landscape Resources - 2

Figure 11-4-4         Photographic Record of Identified Landscape Resources - 3

Figure 11-4-5         Landscape Character Areas

Figure 11-4-6         Photographic Record of Landscape Character Areas

Figure 11-4-7         Strategic and District Level Visual Receivers within the Secondary Zone of Visual Influence

Figure 11-4-8         Local Level Visual Receivers within the Primary Zone of Visual Influence - Construction Phase

Figure 11-4-9         Local Level Visual Receivers within the Primary Zone of Visual Influence - Operation Phase

Figure 11-4-10       Photographic Record of Identified Visual Receivers at Local Level

Figure 11-4-11       Photographic Record of Identified Visual Receivers at District and Local Level

Figure 11-4-12       Photographic Record of Baseline Viewpoints from Key VSRs at Strategic Level - 1

Figure 11-4-13       Photographic Record of Baseline Viewpoints from Key VSRs at Strategic Level - 2

Figure 11-5-1         Key Plan for Photomontages and Viewpoints

Figure 11-5-2         Photomontage 01:  Key Viewpoint VP01 from Future Metro Park

Figure 11-5-3         Photomontage 02: Key Viewpoint VP02 from Future Station Square

Figure 11-5-4         Photomontage 03: Key Viewpoint VP03 from Sky Tower

Figure 11-5-5         Photomontage 04: Key Viewpoint VP04 from Grand Waterfront

Figure 11-5-6         Photomontage 05: Key Viewpoint VP05 from Future Residential at Northeast of MPSC

Figure 11-5-7         Photomontage 06: Key Viewpoint VP06 from Future Residential at Northwest of MPSC

Figure 11-5-8         Indicative Landscape Master Plan with Potential Mitigation Measures

Figure 12-1-1         Study Area for Archaeological Impact Assessment and Location of Archaeological Sites and Built Heritage

Figure 12-3-1         Overlaying Layout Plan 2014 on 1904 Survey Map

Figure 12-3-2         An aerial photograph showing the Kai Tak Airport in 1963

Figure 12-3-3         An aerial photograph showing the Kai Tak Airport in 1972

Figure 12-3-4         An aerial photograph showing the Kai Tak Airport in 1988

Figure 12-3-5         An aerial photograph showing the area of Old Kai Tak Airport on October 1998

Figure 12-3-6         An aerial photograph showing the area of Old Kai Tak Airport on July 2000

Figure 12-3-7         An aerial photograph showing the area of Old Kai Tak Airport on January 2014

Figure 12-3-8         Study Area of Sacred Hill (North) for Archaeological Survey-cum-excavation and Additional Investigation (carried out by ERM)

Figure 12-5-1         Layout Plan 2014

Figure 12-5-2         Extract from Great Britain, Ordnance Survey Map-Lion Hill, Sheet No. 8 (1904)

 

 

 

LIST OF PHOTOS

 

Photo No. 9-3-1     Panorama of the former Kai Tak Airport Site (2010)

Photo No. 9-3-2     Aerial Photo Taken in 2013

Photo No. 9-3-3     Aerial Photo Taken in 2014-2015

 

 

 

LIST OF APPENDICES

 

Appendices Vol. 1

Appendix 2A         Tentative Construction Programme for EIA Submission

Appendix 2B         Latest Recommended Outline Development Plan

Appendix 3.1         Details of Dust Emission Sources and Calculations

Appendix 3.2         Assumptions of EMFAC-HK

Appendix 3.3         Vehicular Emission Factors

Appendix 3.4         Calculation of Emissions from Portal and Ventilation Building

Appendix 3.5         Emissions of Chimneys

Appendix 3.6         Calculation of Emissions from Cruise Terminal

Appendix 3.7         Calculation of Emissions from Typhoon Shelter

Appendix 3.8         Detailed Assessment Results of Construction Phase

Appendix 3.9         Detailed Assessment Results of Operational Phase

Appendix 3.10       Estimated Communities within the Exceedance Zone of Annual NO2

 

Appendices Vol. 2

Appendix 4.1         The Societal Risk Guidelines

Appendix 4.2         The Locations of Hazardous Facilities

Appendix 5.1A      Prevailing Background Noise Levels

Appendix 5.1B      Photographic Records for the Noise Sensitive Receivers

Appendix 5.2A      Construction Plant Inventory (Unmitigated)

Appendix 5.2B      Programme of Construction Activities

Appendix 5.2C      SWL of Construction Activities (Unmitigated)

Appendix 5.2D      Notional Distance, Correction and Screening of NSRs

Appendix 5.2E      Construction Noise Calculation (Unmitigated)

Appendix 5.2F       Construction Noise Level from the Project (Unmitigated)

Appendix 5.2G      Construction Plant Inventory (Mitigated)

Appendix 5.2H      SWL of Construction Activities (Mitigated)

Appendix 5.2I       Construction Noise Calculation (Mitigated)

Appendix 5.2J       Construction Noise Level from the Project (Mitigated)

Appendix 5.2K      SWL of Construction Activities from Concurrent Projects

Appendix 5.2L      Notional Distance, Correction and Screening of NSRs for Concurrent Projects

Appendix 5.2M     Construction Noise Calculation for Concurrent Projects

Appendix 5.2N      Construction Noise Levels from the Concurrent Projects

Appendix 5.2O      Cumulative Construction Noise Levels (Unmitigated)

Appendix 5.2P       Cumulative Construction Noise Levels (Mitigated)

Appendix 5.3A      Year 2036 Traffic Forecast

Appendix 5.3B      Detailed Calculation Results of Traffic Noise

Appendix 5.3C      Detailed Location of NSR TPN14

Appendix 5.3D      Traffic Forecast Endorsement by Transport Department

Appendix 5.4A      Noise Assessment for Main Stadium Fixed Noise and Music, Singing and Instrument Performing Activities

Appendix 5.4B      Human Noise Level Determination

Appendix 5.4C      Fixed Noise Assessment for Public Sports Ground

Appendix 5.4D      Noise Level Calibration of Acoustic Modelling Software

Appendix 5.4E      Directivity of Loudspeakers

Appendix 5.5         Noise from Building Servicing and Ventilation System Operation

Appendix 5.6         Assessment Report for Noise Impact from Crowd Dispersion at Public Places

Appendix 6A         Relevant Environmental and Safety Standards for Marine Transportation

Appendix 6B         Practice Notes ProPECC PN 1/94 and APP-46

Appendix 6C         Estimation of Residual Fertilizer and Washable Deposited Pesticides and Volume of Storage Tanks

Appendix 6D         Content of Stormwater Re-use Management Plan

Appendix 7.1         Number of Temporary Staff Working in H.K. Stadium during H.K. Sevens 2014

Appendix 7.2         Extract from Infrastructure Review Report (Table 4.17 and 4.18) & Flow Comparison and Back Analysis

Appendix 7.3         Sewer Sub-Catchments of Pumping Station NPS and PS2 & Preliminary Sewerage Calculation

Appendix 7.4         Email from CEDD/Consultant Confirming Roughness of Coefficients (Ks)

Appendix 8A         Practice Note for Registered Contractors No. 17

Appendix 9A         Study Area of Kai Tak Airport North Apron Decommissioning EIA

Appendix 9B         Remediation Areas of Kai Tak Airport North Apron Decommissioning EIA

Appendix 9C         Concrete Batching Plant, APP-120, Practice Note for Authorized Persons and Registered Structural Engineers, Buildings Department

Appendix 9D         Extract from CLP Power Hong Kong Limited Code of Practice No.101

Appendix 10.1       Representative Photos of Habitats in the Study Area

Appendix 10.2       Species List

Appendix 10.3       Photographic Record of Species with Conservation Importance

Appendix 11A       Overlaying Layout Plan 2014 on 1904 Survey Map

Appendix 11B       Urban Design Framework

Appendix 11C       Vantage Points Proposed in the study on Urban Design Guidelines for Hong Kong

Appendix 11D       Detail of Broad Brush Tree Groups

Appendix 11E       A Broad Tree Survey within the 500m Study Boundary

Appendix 11F        CIE’s Standard Observer

Appendix 11G       MPSC Preliminary Lighting Layout and Lighting Fittings Characters

Appendix 11H       Context Renderings of the Project within the Surrounding Open Space

Appendix 12A       CV of Archaeologist, Mr. Yeung Chun Tong

Appendix 12B       Master Plan for the Development of Kai Tak Airport

Appendix 12C       Ground Investigation Report and Geological Map

Appendix 15.1       Key Assessment Assumptions, Limitation of Assessment Methodologies and Related Prior Agreement(s)