TABLE OF CONTENT
1.1 Project Background
1.2 Designated Projects under EIAO
1.3 Purpose of the EIA Study
1.4 Objectives of this EIA Study
1.5 Structure of the EIA Report
2.1 Description
of Site Location and Site History of the Project
2.2 Size,
Scale, Shape and Design of the Project 2-1
2.3 Purpose,
Objective and Benefits of the Project 2-1
2.4 The
Need for the Project
2.5 Scenario without the Project
2.6 Consideration of Alternative Design and Layout of Road
2.7 Selected
Option
2.8 Fine-tuned
Enhanced NER Arrangement (Option 4)
2.9 Consequences
of Not Proceeding with the Project
2.10 Consideration
of Alternative Construction Methods
2.11 Construction
Programme
2.12 Concurrent
Projects
2.13 Public
Concern
3.1 Introduction
3.2 Environmental Legislations, Standards and Guidelines
3.3 Description of Environment
3.4 Identification of Air Sensitive Receivers
3.5 Identification of Environmental Impacts
3.6 Assessment Methodology
3.7 Prediction and Evaluation of Environmental Impacts
3.8 Mitigation of Adverse Environmental Impacts. 3-20
3.9 Evaluation of Residual Impacts
3.10 Environmental Monitoring and Audit
3.11 Conclusion
4.1 Introduction
4.2 Environmental Legislation, Standards and
Criteria
4.3 Description of Environment
4.4 Noise Sensitive Receivers
4.5 Identification of Environmental Impacts
4.6 Assessment Methodology
4.7 Prediction and Evaluation of Environmental
Impacts
4.8 Mitigation of
Adverse Environmental Impacts
4.9 Evaluation of Residual Impacts
4.10 Environmental Monitoring and Audit
4.11 Conclusion
5.1 Introduction
5.2 Environmental Legislation, Standards and Criteria
5.3 Description of Environment
5.4 Water Sensitive Receivers (WSRs)
5.5 Identification of Potential Impacts
5.6 Assessment Methodology
5.7 Water Quality Impact Assessment
5.8 Cumulative Impacts from Concurrent Project
5.9 Water Quality Mitigation Measures
5.10 Residual Water Quality Impacts
5.11 Environmental Monitoring and Audit Requirements
5.12 Conclusion
6 WASTE
MANAGEMENT IMPLICATION
6.1 Introduction
6.2 Environmental Legislations, Standards and Guidelines
6.3 Description of Environment
6.4 Identification of Waste Management Implications
6.5 Assessment Methodology
6.6 Prediction and Evaluation of Waste Management Implications
6.7 Mitigation of Adverse Environmental Impacts. 6-10
6.8 Evaluation of Residual Impacts
6.9 Environmental Monitoring and Audit Requirements
6.10 Conclusion
7.1 Introduction
7.2 Environmental Legislation, Standards and Criteria
7.3 Assessment
Methodology
7.4 Description of Environment
7.5 Site Appraisal
7.6 Prediction and Evaluation of Land Contamination Impacts
7.7 Evaluation of Residual Impacts. 7-5
7.8 Environmental Monitoring and Audit
7.9 Conclusion
8.1 Introduction
8.2 Environmental Legislation, Standards and Criteria
8.3 Assessment Methodologies
8.4 Review of the Planning and Development Control Framework
8.5 Baseline Study
8.6 Landscape Impact Assessment
8.7 Visual Impact Assessment
8.8 Landscape and Visual Mitigation Measures
8.9 Residual Impact
8.10 Cumulative Impacts Assessment from Concurrent Project
8.11 Environmental Monitoring and Audit
8.12 Conclusion
9 Environmental
Monitoring and Audit Requirements
9.1 Introduction
9.2 Air Quality Impact
9.3 Noise Impact
9.4 Water Quality Impact
9.5 Waste Management Implications
9.6 Land Contamination
9.7 Landscape and Visual Impacts
10 SUMMARY
OF ENVIRONMENTAL OUTCOMES
10.1 Overview
10.2 Environmental Benefits of the Project
10.3 Incorporation of Environmentally Friendly Options
10.4 Environmental Design Recommended
10.5 Key Environmental Problems Avoided and Environmentally Sensitive
Areas Protected
10.6 Environmental Protection Measures Recommended. 10-3
10.7 Estimation of Population Protected
11.1 Conclusion of EIA Study
List
of Tables
Table 2.1 Summary of
Comparison under Traffic Requirement
Table 2.2 Summary of
Comparison under Constructability, and Land and Statutory Feasibility
Table 2.3 Summary of
Environmental Considerations
Table 2.4 Comparison of
Construction Methods
Table 3.1 Hong Kong Air Quality Objectives
Table 3.2 Average Concentrations of Pollutants in the
Recent Five Years (Year 2015 ¡V 2019) at Sham Shui Po EPD Air Quality Monitoring
Station
Table 3.3 Background Air Pollutants Concentrations in
Year 2020 Extracted from the PATH-2016 Model
Table 3.4 Representative Air Sensitive Receivers in
the vicinity of the Project
Table 3.5 Tentative Transportation Routings
Table 3.6 Predicted Worst-case Cumulative
Concentrations at Representative Air Sensitive Receivers under Revised Austin
Road Flyover Scenario
Table 3.7 Comparison of Annual Average NO2
Concentrations between 2 Scenarios at Selected ASRs and Assessment Levels with
Exceedances of AQOs
Table 4.1 Area Sensitivity
Ratings (ASRs)
Table 4.2 Construction Noise
Criteria for Activities Other Than Percussive Piling
Table 4.3 Details of
Representative Noise Sensitive Receivers
Table 4.4 Summary of
Unmitigated Construction Noise Assessment Results due to the Project
Table 4.5 Summary of
Unmitigated Cumulative Construction Noise Assessment Results
Table 4.6 Summary of
Unmitigated Road Traffic Noise Assessment Results
Table 5.1 Summary of Water
Quality Objectives for Victoria Harbour (Phase Two) WCZ
Table 5.2 Water Quality
Criteria of Sea Water for Flushing Supply
Table 5.3 Summary Statistics
of Marine Water Quality of Victoria Harbour WCZ Collected by EPD in 2018
Table 5.4 Summary Statistics
of Marine Water Quality of New Yau Ma Tei Typhoon Shelter Collected by EPD in
2018
Table 6.1 Estimated Quantities of C&D Materials
during Construction Phase
Table 6.2 C&D Materials Generated from Demolition
of Existing Carriageways
Table 6.3 C&D Materials Generated from Site
Clearance / Set-up / Plant Mobilization, Underground Utilities Protection and
Diversion Works, Piling Works, Pile Cap / Pier / Abutment Construction
Table 6.4 C&D Materials Generated from Falsework
/ Deck Construction
Table 6.5 C&D Materials Generated from Drainage
and Pavement Construction
Table 6.6 Tentative Transportation Routings for Waste
Disposal During Construction Phase
Table 6.7 Summary of Waste Generation, Waste Handling Procedures
and Disposal Outlets
Table 7.1 Aerial Photographs
Reviewed
Table 7.2 Registered Chemical
Waste Producers
Table 8.1 Relationship
between Landscape Sensitivity and Magnitude of Change in Defining Impact
Significance
Table 8.2 Relationship
between VSRs Sensitivity and Magnitude of Change in Defining Impact
Significance
Table 8.3 Summary of the
Review of Planning and Development Control Framework
Table 8.4 Baseline LRs and
their Sensitivity
Table 8.5 Baseline LCAs
and their Sensitivity
Table 8.6 Baseline VSRs
and their Sensitivity
Table 8.7 Magnitude of
Landscape Impacts during Construction and Operation
Table 8.8 Magnitude of
Visual Impacts during Construction and Operation
Table 8.9 Landscape and
Visual Mitigation Measures for Construction Phase
Table 8.10 Landscape and
Visual Mitigation Measures for Operation Phase
Table 8.11 Significance of
Landscape Impacts Before and After Mitigation Measures in Construction and
Operation Phases
Table 8.12 Significance of
Visual Impacts Before and After Mitigation Measures in the Construction Phase
and Operation Phase
Table 10.1 Summary of Key
Environmental Problems Avoided and Sensitive Areas Protected
Table 10.2 Key
Recommended Mitigation Measures
Table 11.1 Summary of Key Environmental Outcomes and Benefits
List
of Drawings
Location Plan of the Proposed Revised Austin Road Flyover |
|
Revision of Project Boundary |
|
Land Uses in the Vicinity of the Project |
|
Original Austin Road Flyover |
|
Schematic Road Alignment of Option 1 |
|
Schematic Road Alignment of Option 2 |
|
Schematic Road Alignment of Option 3 |
|
Schematic Road Alignment of the Project |
|
Vertical Alignment of the Project |
|
Phasing of Construction Works |
|
Locations of Concerned PATH Grids |
|
Locations of Representative Air Sensitive Receivers |
|
Locations of Portals, Underpass Top Openings, Ventilation Building and Ventilation Exhausts |
|
Locations of Marine Emission Sources |
|
Original Austin Road Flyover Scenario and Revised Austin Road Flyover Scenario |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 1) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 2) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 1) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 2) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 1) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 2) |
|
Contours of Cumulative 19th Highest 1-hour NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 1) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 2) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 1) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 2) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 1) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 2) |
|
Contours of Cumulative Annual NO2 Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily RSP Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily RSP Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily RSP Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual RSP Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual RSP Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual RSP Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily FSP Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily FSP Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative 10th Highest Daily FSP Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual FSP Concentration (µg/m3) at 1.5m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual FSP Concentration (µg/m3) at 15m Above Ground (Scenario 3) |
|
Contours of Cumulative Annual FSP Concentration (µg/m3) at 20m Above Ground (Scenario 3) |
|
Locations of Noise Sensitive Receivers |
|
Extent of ¡§Project¡¨ Roads Under the Project |
|
Extent of Low Noise Road Surface on Existing Roads within Study Area |
|
Locations of Marine Water Sensitive Receivers and EPD Monitoring Stations |
|
Tentative Location of Stockpiling Area |
|
General Layout Plan of Revised Austin Road Flyover |
|
Photographic Records of Site Reconnaissance (Sheet 1 of 2) |
|
Photographic Records of Site Reconnaissance (Sheet 2 of 2) |
|
Review of Planning and Development Control Framework (OZP) |
|
Landscape Resources |
|
Landscape Resources Photos |
|
Landscape Character Areas |
|
Landscape Character Areas Photos (Sheet 1 of 2) |
|
Landscape Character Areas Photos (Sheet 2 of 2) |
|
Visual Envelope and Visually Sensitive Receivers |
|
Landscape and Visual Mitigation Plan |
|
General Arrangement of New Exit Road Sections |
|
Photomontage Viewpoint Location |
|
Photomontage P1 |
|
Photomontage P2 |
|
Photomontage P3 |
|
Photomontage P4 |
|
Photomontage P5 |
|
Photomontage P6 |
|
Photomontage P7 |
List
of Appendices
Tentative Master Construction Programme |
|
Traffic Forecast for Air Quality
Assessment |
|
EMFAC-HK Model Assumptions |
|
Summary of Vehicular Emission
Factors of 16 Vehicle Classes |
|
Summary of Composite Vehicular Emission Factors for CALINE4 Model |
|
Detailed Calculation of
Emissions from Portals, Underpass Top Openings, Ventilation Building and
Ventilation Exhausts |
|
Detailed Calculation of
Emissions Associated with Bus, Minibus and Coach Terminuses |
|
Detailed Calculation of Marine
Emission |
|
Detailed Emission Removal for
PATH Re-run |
|
Determination of Surface
Characteristics Parameters for AERMET |
|
Detailed Assessment Results |
|
Comparison between Revised
Austin Road Flyover Scenario and Original Austin Road Flyover Scenario |
|
Agreement and Confirmation
Letters from Relevant Government Departments and Authorities |
|
Photographs of the Existing
Representative Noise Sensitive Receivers |
|
Construction Programme |
|
Construction Plant Inventory
(Unmitigated Scenario) |
|
2040 Peak Hour Traffic Forecast |
|
Construction Noise Calculation
(Unmitigated Scenario) |
|
Cumulative Construction Noise
Calculation (Unmitigated Scenario) |
|
Detailed Results of Road Traffic
Noise Assessment (Unmitigated Scenario) |
|
Layout of Road Plots |
|
Relevant Historical Aerial
Photographs |
|
Extract of Geotechnical
Appraisal Report for Ground Investigation |
|
Acquisition of Information from
Government Departments |
|
Site Walkover Checklist
(Assessment Area except Yau Ma Tei
Public Cargo Working Area) |
|
Site Walkover Checklist (Yau Ma Tei Public Cargo Working
Area) |
|
Broad Brush Tree Survey Findings
and Tree Group Schedule |
|
Implementation Schedule of
Recommended Mitigation Measures |
|
Summary of Environmental Impacts |
|
Key Assessment Assumptions,
Limitations of Assessment Methodologies and Prior Agreements with the
Director |