TABLE OF CONTENTS

 

1.           INTRODUCTION

1.1         Project Background

1.2         Objectives of this Report

1.3         Structure of the Report

2.           PROJECT DESCRIPTION           

2.1         Location and Description of the Project                                                             

2.2         Need for the Project                      

2.3         Scenarios With and Without the Project                                                            

2.4         Consideration of Alternative Design and Layout                                                

2.5         Consideration of Alternative Construction Methods and Sequences of Work   

2.6         Project Implementation Programme                                                                   

2.7         Project Interface / Concurrent Projects                                                              

2.8         Public Consultation to Date           

3.           AIR QUALITY IMPACT ASSESSMENT                                                            

3.1         Introduction                                    

3.2         Relevant Legislations, Standards & Guidelines                                                 

3.3         Baseline Environmental Conditions                                                                   

3.4         Future Air Quality Conditions        

3.5         Study Area and Air Sensitive Receivers                                                             

3.6         Assessment Methodology             

3.7         Air Quality Impact Assessment     

3.8         Recommendation of Mitigation Measures

3.9         Residual Impact                             

3.10       Potential Cumulative Impact         

3.11       Summary                                       

4.           NOISE IMPACT ASSESSMENT  

4.1         Introduction                                    

4.2         Relevant Legislations, Standards & Guidelines                                                 

4.3         Baseline Environmental Conditions                                                                   

4.4         Assessment Area and Noise Sensitive Receivers                                             

4.5         Assessment Methodology             

4.6         Noise Impact Assessment             

4.7         Good Site Practices                       

4.8         Residual Construction Noise Impacts                                                                

4.9         Cumulative Noise Impact              

4.10       Summary                                       

5.           ECOLOGICAL IMPACT ASSESSMENT                                                           

5.1         Introduction                                    

5.2         Relevant Legislations, Standards & Guidelines                                                 

5.3         Study Approach                             

5.4         Recognized Site of Conservation Importance                                                   

5.5         Existing Ecological Baseline Condition                                                              

5.6         Evaluation of Ecological Values    

5.7         Impact Identification                      

5.8         Impact Evaluation

5.9         Mitigation Measures                      

5.10       Cumulative and Residual Impact  

5.11       Environmental Monitoring and Audit Requirements                                           

5.12       Summary                                       

5.13       References                                    

6.           WATER QUALITY IMPACT ASSESSMENT                                                     

6.1         Introduction                                    

6.2         Relevant Legislations, Standards & Guidelines                                                 

6.3         Assessment Methodology             

6.4         Study Area and Water Sensitive Receivers (WSRs)                                         

6.5         Baseline Water Quality Conditions

6.6         Water Quality Impact Assessment

6.7         Mitigation Measures                      

6.8         Cumulative Impact                         

6.9         Evaluation of Residual Impact      

6.10       Environmental Monitoring and Audit Requirements                                           

6.11       Summary                                       

7.           WASTE MANAGEMENT IMPLICATION                                                           

7.1         Introduction                                    

7.2         Relevant Legislations, Standards & Guidelines                                                 

7.3         Assessment Methodology             

7.4         Waste Generation                          

7.5         Mitigation Measures                      

7.6         Residual Impact                             

7.7         Summary                                       

8.           LAND CONTAMINATION             

8.1         Introduction                                    

8.2         Relevant Legislations, Standards & Guidelines                                                 

8.3         Assessment Methodology             

8.4         Description of Existing Condition of the Project Area                                        

8.5         Future Land Use                            

8.6         Identification and Evaluation of Potential Impacts                                             

8.7         Site Investigation                           

8.8         Precautionary Measures to Be Undertaken during Construction                      

8.9         Residual Environmental Impact    

8.10       Conclusion                                     

9.           LANDSCAPE AND VISUAL IMPACT ASSESSMENT                                     

9.1         Introduction                                    

9.2         Landscape and Visual Legislation, Standard and Guidelines                           

9.3         Assessment Area                          

9.4         Methodology for Assessment of Landscape and Visual Impacts                      

9.5         Review of Relevant Guidelines on Landscape Strategies and Framework and Land Use Zoning       

9.6         Existing Trees within the Project Boundary                                                        

9.7         Landscape Baseline Study            

9.8         Visual Baseline Study                    

9.9         Potential Sources of Landscape and Visual Impact                                          

9.10       Landscape Impact Assessment    

9.11       Visual Impact Assessment            

9.12       Visual Enhancement and Landscape Mitigation Measures                               

9.13       Residual Landscape Impact          

9.14       Residual Visual Impact                  

9.15       Cumulative Impact                         

9.16       Summary and Conclusion             

10.         CULTURAL HERITAGE IMPACT ASSESSMENT                                            

10.1       Introduction                                    

10.2       Relevant Legislations, Standards & Guidelines                                                 

10.3       Baseline Review                            

10.4       Archaeological Impact Assessment Methodology                                             

10.5       Evaluation of Archaeological Potential                                                               

10.6       Archaeological Impact Assessment                                                                   

10.7       Mitigation recommendations for Archaeology                                                    

10.8       Evaluation of Built Heritage Potential                                                                 

10.9       Built Heritage Impact Assessment 292

10.10     Mitigation Measures for Built Heritage                                                               

10.11     Cumulative Impact                         

10.12     Residual Impact                             

10.13     Environmental Monitoring and Audit Requirements                                           

10.14     Summary                                       

10.15     References                                    

11.         ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS                

11.1       Overview                                        

11.2       Air Quality                                      

11.3       Noise                                              

11.4       Ecology                                          

11.5       Water Quality                                 

11.6       Waste Management                      

11.7       Land Contamination                      

11.8       Landscape and Visual                   

11.9       Cultural Heritage                           

12.         IMPLEMENTATION SCHEDULE OF RECOMMENDED MITIGATION MEASURES 

12.1       Introduction                                    

13.         ENVIRONMENTAL OUTCOME AND CONCLUSIONS                                    

13.1       Summary of Mitigation Measures Proposed                                                      

13.2       Key Environmental Outcomes      

13.3       Overall Conclusion                        

 

 

 

 

List of Figures

Figure 2.1

Figure 2.2  

Figure 2.3  

Figure 2.4A  

Figure 2.4B  

Figure 2.5A  

Figure 2.5B  

Figure 3.1

Figure 3.2

Figure 3.3

Figure 3.4A

Figure 3.4B

Figure 3.5A

Figure 3.5B

Figure 4.1

Figure 4.2

Figure 4.3

Figure 4.4

Figure 4.5

Figure 4.6

Figure 4.7

Figure 4.8a

Figure 4.8b

Figure 4.9

Figure 5.1

Figure 5.2

Figure 5.3

Figure 5.4

Figure 5.5

Figure 5.6

Figure 5.7a

Figure 5.7b

Figure 5.8a

Figure 5.8b

Figure 5.9

Figure 5.10

Figure 5.11a

Figure 5.11b

Figure 5.12a

Figure 5.12b

Figure 5.13

Figure 5.14

Figure 5.15

Figure 5.16

Figure 5.17

Figure 5.18

Figure 5.19

Figure 5.20

Figure 5.21

Figure 6.1

Figure 6.2

Figure 6.3

Figure 6.4

Figure 6.5

Figure 9.01

Figure 9.02

Figure 9.03

Figure 9.04

Figure 9.05

Figure 9.06

Figure 9.07

Figure 9.08

Figure 9.09

Figure 9.10

Figure 9.11

Figure 9.12

Figure 9.13

Figure 9.14

Figure 9.15

Figure 9.16

Figure 9.17

Figure 9.18

Figure 9.19

Figure 9.20

Figure 9.21

Figure 9.22

Figure 9.23

Figure 9.24

Figure 9.25

Figure 9.26

Figure 9.27

Figure 9.28

Figure 9.29

Figure 9.30

Figure 9.31

Figure 9.32

Figure 9.33

Figure 9.34

Figure 9.35

Figure 9.36

Figure 9.37

Figure 9.38

Figure 9.39

Figure 9.40

Figure 9.41

Figure 9.42

Figure 9.43

Figure 9.44

Figure 9.45

Figure 9.46

Figure 9.47

Figure 9.48

Figure 9.49

Figure 9.50

Figure 9.51

Figure 9.52

Figure 9.53

Figure 9.54

Figure 9.55

Figure 9.56

Figure 9.57

Figure 9.58

Figure 9.59

Figure 9.60

Figure 9.61

Figure 9.62

Figure 9.63

Figure 9.64

Figure 9.65

Figure 9.66

Figure 9.67

Figure 9.68

Figure 9.69

Figure 9.70

Figure 9.71

Figure 9.72

Figure 9.73

Figure 9.74

Figure 9.75

Figure 9.76

Figure 9.77

Figure 9.78

Figure 9.79

Figure 9.80

Figure 9.81

Figure 9.82

Figure 9.83

Figure 9.84

Figure 9.85

Figure 9.86

Figure 9.87

Figure 9.88

Figure 9.89

Figure 9.90

Figure 9.91

Figure 9.92

Figure 9.93

Figure 9.94

Figure 9.95

Figure 9.96

Figure 9.97

Figure 9.98

Figure 9.99

Figure 9.100

Figure 9.101

Figure 9.102

Figure 9.103

Figure 9.104

Figure 9.105

Figure 9.106

Figure 9.107

Figure 9.108

Figure 9.109

Figure 9.110

Figure 9.111

Figure 9.112

Figure 9.113

Figure 9.114

Figure 9.115

Figure 9.116

Figure 9.117

Figure 9.118

Figure 9.119

Figure 9.120

Figure 9.121

Figure 9.122

Figure 9.123

Figure 9.124

Figure 9.125

Figure 9.126

Figure 9.127

Figure 9.128

Figure 9.129

Figure 9.130

Figure 10.1

Figure 10.2

Figure 10.3

Figure 10.4

Figure 10.5

Figure 10.6

Figure 10.7

Figure 10.8

Figure 10.9

Figure 10.10

Figure 10.11

Figure 10.12

Figure 10.13

Figure 10.14

Figure 10.15

Figure 10.16

Figure 10.17

Figure 10.18

Figure 10.19

Figure 10.20

Site Location Plan

Proposed Drainage Improvement Works at Sung Shan New Village

Proposed Drainage Improvement Works at Tai Wo

Proposed Drainage Improvement Works at Lin Fa Tei (Sheet 1 of 2)

Proposed Drainage Improvement Works at Lin Fa Tei (Sheet 2 of 2)

Proposed Drainage Improvement Works at Ha Che (Sheet 1 of 2)

Proposed Drainage Improvement Works at Ha Che (Sheet 2 of 2)

Air Quality Impact Assessment – Key Plan

Location of Representative Air Sensitive Receivers at Sung Shan New Village

Location of Representative Air Sensitive Receivers at Tai Wo

Location of Representative Air Sensitive Receivers at Lin Fa Tei (Sheet 1 of 2)

Location of Representative Air Sensitive Receivers at Lin Fa Tei (Sheet 2 of 2)

Location of Representative Air Sensitive Receivers at Ha Che (Sheet 1 of 2)

Location of Representative Air Sensitive Receivers at Ha Che (Sheet 2 of 2)

Noise Impact Assessment – Key Plan

Location of Representative Noise Sensitive Receivers at Sung Shan New Village

Location of Representative Noise Sensitive Receivers at Tai Wo

Location of Representative Noise Sensitive Receivers at Lin Fa Tei

Location of Representative Noise Sensitive Receivers at Ha Che

Photographs of Representative Noise Sensitive Receivers at Sung Shan New Village

Photographs of Representative Noise Sensitive Receivers at Tai Wo

Photographs of Representative Noise Sensitive Receivers at Lin Fa Tei (Sheet 1 of 2)

Photographs of Representative Noise Sensitive Receivers at Lin Fa Tei (Sheet 2 of 2)

Photographs of Representative Noise Sensitive Receivers at Ha Che

Verification Survey Transect at Sung Shan New Village

Verification Survey Transect at Tai Wo

Verification Survey Transect at Lin Fa Tei

Verification Survey Transect at Ha Che

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Sung Shan New Village

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Tai Wo

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Lin Fa Tei (Sheet 1 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Lin Fa Tei (Sheet 2 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Ha Che (Sheet 1 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Ha Che (Sheet 2 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Sung Shan New Village

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Tai Wo

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Lin Fa Tei (Sheet 1 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Lin Fa Tei (Sheet 2 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Ha Che (Sheet 1 of 2)

Updated Habitat map and locations of flora and non-bird fauna species of conservation concern recorded within the Study Area and Identified Site boundary (updated to 2019) at Ha Che (Sheet 2 of 2)

Potential Loss of Watercourse Habitat Outside the Site Boundary at Sung Shan New Village

Potential Loss of Watercourse Habitat Outside the Site Boundary at Tai Wo

Potential Loss of Watercourse Habitat Outside the Site Boundary at Lin Fa Tei

Potential Loss of Watercourse Habitat Outside the Site Boundary at Ha Che

Illustration of vegetative elements in greening design

Profiles of original watercourse and proposed green channel at Sung Shan New Village

Profiles of original watercourse and proposed green channel at Lin Fa Tei

Profiles of original watercourse and proposed green channel at Ha Che

Indicative Locations and Conceptual Details of Proposed Escape Ramp

Water Sensitive Receivers at Sung Shan New Village

Water Sensitive Receivers at Tai Wo

Water Sensitive Receivers at Lin Fa Tei

Water Sensitive Receivers at Ha Che

EPD’s Monitoring Station

General site location plan

Aerial Photograph – Sung Shan New Village (2017)

Future Planning Context (OZP) – Sung Shan New Village

Landscape Resources Plan – Sung Shan New Village

Landscape Resources Photographs – Sung Shan New Village

Landscape Character Areas Plan – Sung Shan New Village

Landscape Character Areas Photographs – Sung Shan New Village

Location of Visually Sensitive Receivers and Visual Envelope – Sung Shan New Village

Existing VSR Views – Sung Shan New Village

Existing VSR Views – Sung Shan New Village

Existing VSR Views – Sung Shan New Village

Existing VSR Views – Sung Shan New Village

Preliminary Landscape Master Plan – Sung Shan New Village

Landscape and Visual Mitigation Measures – Plan – Sung Shan New Village

Not Used

Landscape and Visual Mitigation Measures – Sections – Sung Shan New Village

Residual Impact on Landscape Resources during Construction and Operation – Sung Shan New Village

Residual Impact on Landscape Character Areas during Construction and Operation – Sung Shan New Village

Residual Visual Impact during Construction and Operation – Sung Shan New Village

Vantage Points for Photomontages – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Photomontage of Vantage Points – Sung Shan New Village

Aerial Photograph – Tai Wo (2017)

Future Planning Context (OZP) – Tai Wo

Landscape Resources Plan – Tai Wo

Landscape Resources Photographs – Tai Wo

Landscape Character Areas Plan – Tai Wo

Landscape Character Areas Photographs – Tai Wo

Location of Visually Sensitive Receivers and Visual Envelope – Tai Wo

Existing VSR Views – Tai Wo

Existing VSR Views – Tai Wo

Existing VSR Views – Tai Wo

Existing VSR Views – Tai Wo

Preliminary Landscape Master Plan – Tai Wo

Landscape and Visual Mitigation Measures – Plan – Tai Wo

Landscape and Visual Mitigation Measures – Sections – Tai Wo

Residual Impact on Landscape Resources during Construction and Operation – Tai Wo

Residual Impact on Landscape Character Areas during Construction and Operation – Tai Wo

Residual Visual Impact during Construction and Operation – Tai Wo

Vantage Points for Photomontages – Tai Wo

Photomontage of Vantage Points – Tai Wo

Photomontage of Vantage Points – Tai Wo

Photomontage of Vantage Points – Tai Wo

Photomontage of Vantage Points – Tai Wo

Photomontage of Vantage Points – Tai Wo

Photomontage of Vantage Points – Tai Wo

Aerial Photograph – Lin Fa Tei (2017)

Future Planning Context (OZP) – Lin Fa Tei (W)

Future Planning Context (OZP) – Lin Fa Tei (E)

Landscape Resources Plan – Lin Fa Tei (W)

Landscape Resources Plan – Lin Fa Tei (E)

Landscape Resources Photographs – Lin Fa Tei

Landscape Character Areas Plan – Lin Fa Tei (W)

Landscape Character Areas Plan – Lin Fa Tei (E)

Landscape Character Areas Photographs – Lin Fa Tei

Location of Visually Sensitive Receivers and Visual Envelope – Lin Fa Tei

Existing VSR Views – Lin Fa Tei

Existing VSR Views – Lin Fa Tei

Existing VSR Views – Lin Fa Tei

Existing VSR Views – Lin Fa Tei

Existing VSR Views – Lin Fa Tei

Preliminary Landscape Master Plan – Lin Fa Tei (W)

Preliminary Landscape Master Plan – Lin Fa Tei (E)

Landscape and Visual Mitigation Measures – Plan – Lin Fa Tei (W)

Landscape and Visual Mitigation Measures – Plan – Lin Fa Tei (E)

Landscape and Visual Mitigation Measures – Sections – Lin Fa Tei

Landscape and Visual Mitigation Measures – Sections – Lin Fa Tei

Landscape and Visual Mitigation Measures – Sections – Lin Fa Tei

Residual Impact on Landscape Resources during Construction and Operation – Lin Fa Tei (W)

Residual Impact on Landscape Resources during Construction and Operation – Lin Fa Tei (E)

Residual Impact on Landscape Character Areas during Construction and Operation – Lin Fa Tei (W)

Residual Impact on Landscape Character Areas during Construction and Operation – Lin Fa Tei (E)

Residual Visual Impact during Construction and Operation – Lin Fa Tei

Vantage Points for Photomontages – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Photomontage of Vantage Points – Lin Fa Tei

Aerial Photograph – Ha Che (N) (2017)

Aerial Photograph – Ha Che (S) (2017)

Future Planning Context (OZP) – Ha Che (N)

Future Planning Context (OZP) – Ha Che (S)

Landscape Resources – Ha Che (N)

Landscape Resources – Ha Che (S)

Landscape Resources Photographs – Ha Che

Landscape Character Areas – Ha Che (N)

Landscape Character Areas – Ha Che (S)

Landscape Character Areas Photographs – Ha Che

Location of Visually Sensitive Receivers and Visual Envelope – Ha Che (N)

Location of Visually Sensitive Receivers and Visual Envelope – Ha Che (S)

Existing VSR Views – Ha Che

Existing VSR Views – Ha Che

Existing VSR Views – Ha Che

Existing VSR Views – Ha Che

Existing VSR Views – Ha Che

Preliminary Landscape Master Plan – Ha Che (N)

Preliminary Landscape Master Plan – Ha Che (S)

Landscape and Visual Mitigation Measures – Plan – Ha Che (N)

Landscape and Visual Mitigation Measures – Plan – Ha Che (S)

Landscape and Visual Mitigation Measures – Sections – Ha Che

Landscape and Visual Mitigation Measures – Sections – Ha Che

Not Used

Residual Impact on Landscape Resources during Construction and Operation – Ha Che (N)

Residual Impact on Landscape Resources during Construction and Operation – Ha Che (S)

Residual Impact on Landscape Character Areas during Construction and Operation – Ha Che (N)

Residual Impact on Landscape Character Areas during Construction and Operation – Ha Che (S)

Residual Visual Impact during Construction and Operation – Ha Che (N)

Residual Visual Impact during Construction and Operation – Ha Che (S)

Vantage Points for Photomontages – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Photomontage of Vantage Points – Ha Che

Proposed Works within Geological Context

Proposed Works within Geological Context at Sung Shan New Village

Locations of Previous Archaeological Investigations at Lin Fa Tei and Shui Lau Tin

Detail of the 1866 San On District Map

Detail of 1899 – 1904 Map showing Historical Villages

Detail of the 1957 Topographical Map at Ha Che Area

Detail of the 1915 Topographical Map

Aerial Photograph dated to 1949 at Lin Fa Tei

Detail of 1967 Topographical Map at Lin Fa Tei

Detail of 1963 Aerial Photograph at Ha Che River Area

Detail of 1963 Aerial Photograph at Tai Wo Area

Detail of 1963 Aerial Photograph at Sung Shan New Village

Graded Historic Building within Lin Fa Tei Area

Graded Historic Building within Ha Che Area

Graded Historic Building within Tai Wo Area

Area Identified for Archaeological Survey at Lin Fa Tei

Study Area for Cultural Heritage at Sung Shan New Village

Study Area for Cultural Heritage at Tai Wo

Study Area for Cultural Heritage at Lin Fa Tei

Study Area for Cultural Heritage at Ha Che

 

 

List of Drawings

 

Drawing No.

Drawing Title

5124336-GLP-OE-0002

General Notes and Legends

5124336-GLP-OE-1031

Proposed Drainage Works at Sung Shan New Village – Option 1

5124336-GLP-OE-1032

Proposed Drainage Works at Sung Shan New Village – Option 2

5124336-GLP-OE-1033

Proposed Drainage Works at Sung Shan New Village – Option 3

5124336-GLP-OE-1041

Proposed Drainage Works at Tai Wo – Option 1

5124336-GLP-OE-1042

Proposed Drainage Works at Tai Wo – Option 2

5124336-GLP-OE-1043

Proposed Drainage Works at Tai Wo – Option 3

5124336-GLP-OE-1051

Proposed Drainage Works at Lin Fa Tei – Option 1 (Sheet 1 of 2)

5124336-GLP-OE-1052

Proposed Drainage Works at Lin Fa Tei – Option 1 (Sheet 2 of 2)

5124336-GLP-OE-1055

Proposed Drainage Works at Lin Fa Tei – Option 2 (Sheet 1 of 2)

5124336-GLP-OE-1056

Proposed Drainage Works at Lin Fa Tei – Option 2 (Sheet 2 of 2)

5124336-GLP-OE-1057

Proposed Drainage Works at Lin Fa Tei – Option 3 (Sheet 1 of 2)

5124336-GLP-OE-1058

Proposed Drainage Works at Lin Fa Tei – Option 3 (Sheet 2 of 2)

5124336-GLP-OE-1059

Proposed Drainage Works at Lin Fa Tei – Option 4 (Sheet 1 of 2)

5124336-GLP-OE-1060

Proposed Drainage Works at Lin Fa Tei – Option 4 (Sheet 2 of 2)

5124336-GLP-OE-1071

Proposed Drainage Works at Ha Che – Option 1 (Sheet 1 of 2)

5124336-GLP-OE-1072

Proposed Drainage Works at Ha Che – Option 1 (Sheet 2 of 2)

5124336-GLP-OE-1073

Proposed Drainage Works at Ha Che – Option 2 (Sheet 1 of 2)

5124336-GLP-OE-1074

Proposed Drainage Works at Ha Che – Option 2 (Sheet 2 of 2)

5124336-GLP-OE-1075

Proposed Drainage Works at Ha Che – Option 3 (Sheet 1 of 2)

5124336-GLP-OE-1076

Proposed Drainage Works at Ha Che – Option 3 (Sheet 2 of 2)

5124336-GLP-OE-1077

Proposed Drainage Works at Ha Che – Option 4 (Sheet 1 of 2)

5124336-GLP-OE-1078

Proposed Drainage Works at Ha Che – Option 4 (Sheet 2 of 2)

 

List of Appendices

Appendix 3-1       PATH-2016 Grid covered

Appendices 4-1a – 1d    Locations of Works Areas

Appendix 4-2a     Plant Inventory (Unmitigated Scenario)

Appendix 4-2b     Predicted Construction Noise Levels (Unmitigated Scenario)

Appendix 4-3a     Plant Inventory (Mitigated Scenario)

Appendix 4-3b     Predicted Construction Noise Levels (Mitigated Scenario)

Appendix 4-4       Potential Overlapping Works Areas with Other Projects

Appendix 4-5       Typical Section Drawing of Temporary/Movable Noise Barrier

Appendix 5-1       Baseline Ecological Survey Report

Appendix 5-2       Supplementary Report on Nesting Activities at Ha Che Egretry

Appendix 6-1       Baseline Water Quality Monitoring Result

Appendix 6-2       Supplementary Baseline Water Quality Monitoring Result

Appendix 8-1       Final Contamination Assessment Plan

Appendix 9-1       Updated Tree Schedule

Appendix 10-1     Built Heritage Catalogue