TABLE OF CONTENTS
1.1 Project Background
1.2 Objectives of this
Report
1.3 Structure of the Report
2.1 Location and
Description of the Project
2.2 Need for the Project
2.3 Scenarios With and Without the Project
2.4 Consideration of
Alternative Design and Layout
2.5 Consideration of
Alternative Construction Methods and Sequences of Work
2.6 Project Implementation
Programme
2.7 Project Interface /
Concurrent Projects
2.8 Public Consultation to
Date
3. AIR QUALITY IMPACT ASSESSMENT
3.1 Introduction
3.2 Relevant Legislations,
Standards & Guidelines
3.3 Baseline Environmental
Conditions
3.4 Future Air Quality
Conditions
3.5 Study Area and Air
Sensitive Receivers
3.6 Assessment Methodology
3.7 Air Quality Impact
Assessment
3.8 Recommendation of
Mitigation Measures
3.9 Residual Impact
3.10 Potential Cumulative
Impact
3.11 Summary
4.1 Introduction
4.2 Relevant Legislations,
Standards & Guidelines
4.3 Baseline Environmental
Conditions
4.4 Assessment Area and
Noise Sensitive Receivers
4.5 Assessment Methodology
4.6 Noise Impact Assessment
4.7 Good Site Practices
4.8 Residual Construction
Noise Impacts
4.9 Cumulative Noise Impact
4.10 Summary
5. ECOLOGICAL IMPACT ASSESSMENT
5.1 Introduction
5.2 Relevant Legislations,
Standards & Guidelines
5.3 Study Approach
5.4 Recognized Site of
Conservation Importance
5.5 Existing Ecological
Baseline Condition
5.6 Evaluation of
Ecological Values
5.7 Impact Identification
5.8 Impact Evaluation
5.9 Mitigation Measures
5.10 Cumulative and Residual
Impact
5.11 Environmental Monitoring
and Audit Requirements
5.12 Summary
5.13 References
6. WATER QUALITY IMPACT ASSESSMENT
6.1 Introduction
6.2 Relevant Legislations,
Standards & Guidelines
6.3 Assessment Methodology
6.4 Study Area and Water
Sensitive Receivers (WSRs)
6.5 Baseline Water Quality
Conditions
6.6 Water Quality Impact
Assessment
6.7 Mitigation Measures
6.8 Cumulative Impact
6.9 Evaluation of Residual
Impact
6.10 Environmental Monitoring
and Audit Requirements
6.11 Summary
7. WASTE MANAGEMENT IMPLICATION
7.1 Introduction
7.2 Relevant Legislations,
Standards & Guidelines
7.3 Assessment Methodology
7.4 Waste Generation
7.5 Mitigation Measures
7.6 Residual Impact
7.7 Summary
8.1 Introduction
8.2 Relevant Legislations,
Standards & Guidelines
8.3 Assessment Methodology
8.4 Description of Existing
Condition of the Project Area
8.5 Future Land Use
8.6 Identification and
Evaluation of Potential Impacts
8.7 Site Investigation
8.8 Precautionary Measures
to Be Undertaken during Construction
8.9 Residual Environmental
Impact
8.10 Conclusion
9. LANDSCAPE AND VISUAL IMPACT
ASSESSMENT
9.1 Introduction
9.2 Landscape and Visual
Legislation, Standard and Guidelines
9.3 Assessment Area
9.4 Methodology for
Assessment of Landscape and Visual Impacts
9.5 Review of Relevant
Guidelines on Landscape Strategies and Framework and Land Use Zoning
9.6 Existing Trees within
the Project Boundary
9.7 Landscape Baseline
Study
9.8 Visual Baseline Study
9.9 Potential Sources of
Landscape and Visual Impact
9.10 Landscape Impact
Assessment
9.11 Visual Impact Assessment
9.12 Visual Enhancement and
Landscape Mitigation Measures
9.13 Residual Landscape
Impact
9.14 Residual Visual Impact
9.15 Cumulative Impact
9.16 Summary and Conclusion
10. CULTURAL HERITAGE IMPACT ASSESSMENT
10.1 Introduction
10.2 Relevant Legislations,
Standards & Guidelines
10.3 Baseline Review
10.4 Archaeological Impact
Assessment Methodology
10.5 Evaluation of
Archaeological Potential
10.6 Archaeological Impact
Assessment
10.7 Mitigation
recommendations for Archaeology
10.8 Evaluation of Built
Heritage Potential
10.9 Built Heritage Impact
Assessment 292
10.10 Mitigation Measures for
Built Heritage
10.11 Cumulative Impact
10.12 Residual Impact
10.13 Environmental Monitoring
and Audit Requirements
10.14 Summary
10.15 References
11. ENVIRONMENTAL MONITORING AND AUDIT
REQUIREMENTS
11.1 Overview
11.2 Air Quality
11.3 Noise
11.4 Ecology
11.5 Water Quality
11.6 Waste Management
11.7 Land Contamination
11.8 Landscape and Visual
11.9 Cultural Heritage
12. IMPLEMENTATION SCHEDULE OF RECOMMENDED
MITIGATION MEASURES
12.1 Introduction
13. ENVIRONMENTAL OUTCOME AND CONCLUSIONS
13.1 Summary of Mitigation
Measures Proposed
13.2 Key Environmental
Outcomes
13.3 Overall Conclusion
List of Figures
Figure 9.15 Figure 9.114 |
Site Location Plan Proposed Drainage Improvement
Works at Sung Shan New Village Proposed Drainage Improvement
Works at Tai Wo Proposed Drainage Improvement
Works at Lin Fa Tei (Sheet 1 of 2) Proposed Drainage Improvement
Works at Lin Fa Tei (Sheet 2 of 2) Proposed Drainage Improvement
Works at Ha Che (Sheet 1 of 2) Proposed Drainage Improvement
Works at Ha Che (Sheet 2 of 2) Air Quality Impact Assessment –
Key Plan Location of Representative Air
Sensitive Receivers at Sung Shan New Village Location of Representative Air
Sensitive Receivers at Tai Wo Location of Representative Air
Sensitive Receivers at Lin Fa Tei (Sheet 1 of 2) Location of Representative Air
Sensitive Receivers at Lin Fa Tei (Sheet 2 of 2) Location of Representative Air
Sensitive Receivers at Ha Che (Sheet 1 of 2) Location of Representative Air
Sensitive Receivers at Ha Che (Sheet 2 of 2) Noise Impact Assessment – Key
Plan Location of Representative
Noise Sensitive Receivers at Sung Shan New Village Location of Representative
Noise Sensitive Receivers at Tai Wo Location of Representative
Noise Sensitive Receivers at Lin Fa Tei Location of Representative
Noise Sensitive Receivers at Ha Che Photographs of Representative
Noise Sensitive Receivers at Sung Shan New Village Photographs of Representative Noise
Sensitive Receivers at Tai Wo Photographs of Representative
Noise Sensitive Receivers at Lin Fa Tei (Sheet 1 of
2) Photographs of Representative
Noise Sensitive Receivers at Lin Fa Tei (Sheet 2 of
2) Photographs of Representative
Noise Sensitive Receivers at Ha Che Verification Survey Transect at
Sung Shan New Village Verification Survey Transect at
Tai Wo Verification Survey Transect at
Lin Fa Tei Verification Survey Transect at
Ha Che Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern recorded
within the Study Area and Identified Site boundary (updated to 2019) at Sung
Shan New Village Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Tai Wo Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Lin Fa Tei (Sheet 1 of 2) Updated Habitat map and locations
of flora and non-bird fauna species of conservation concern recorded within
the Study Area and Identified Site boundary (updated to 2019) at Lin Fa Tei (Sheet 2 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Ha Che (Sheet 1 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Ha Che (Sheet 2 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Sung Shan New Village Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Tai Wo Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Lin Fa Tei (Sheet 1 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Lin Fa Tei (Sheet 2 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Ha Che (Sheet 1 of 2) Updated Habitat map and
locations of flora and non-bird fauna species of conservation concern
recorded within the Study Area and Identified Site boundary (updated to 2019)
at Ha Che (Sheet 2 of 2) Potential Loss of Watercourse
Habitat Outside the Site Boundary at Sung Shan New Village Potential Loss of Watercourse
Habitat Outside the Site Boundary at Tai Wo Potential Loss of Watercourse
Habitat Outside the Site Boundary at Lin Fa Tei Potential Loss of Watercourse
Habitat Outside the Site Boundary at Ha Che Illustration of vegetative
elements in greening design Profiles of original
watercourse and proposed green channel at Sung Shan New Village Profiles of original
watercourse and proposed green channel at Lin Fa Tei Profiles of original watercourse
and proposed green channel at Ha Che Indicative Locations and
Conceptual Details of Proposed Escape Ramp Water Sensitive Receivers at
Sung Shan New Village Water Sensitive Receivers at
Tai Wo Water Sensitive Receivers at
Lin Fa Tei Water Sensitive Receivers at Ha
Che EPD’s Monitoring Station General site location plan Aerial Photograph – Sung Shan
New Village (2017) Future Planning Context (OZP) –
Sung Shan New Village Landscape Resources Plan – Sung
Shan New Village Landscape Resources Photographs
– Sung Shan New Village Landscape Character Areas Plan
– Sung Shan New Village Landscape Character Areas
Photographs – Sung Shan New Village Location of Visually Sensitive
Receivers and Visual Envelope – Sung Shan New Village Existing VSR Views – Sung Shan
New Village Existing VSR Views – Sung Shan
New Village Existing VSR Views – Sung Shan
New Village Existing VSR Views – Sung Shan
New Village Preliminary Landscape Master
Plan – Sung Shan New Village Landscape and Visual Mitigation
Measures – Plan – Sung Shan New Village Not Used Landscape and Visual Mitigation
Measures – Sections – Sung Shan New Village Residual Impact on Landscape
Resources during Construction and Operation – Sung Shan New Village Residual Impact on Landscape
Character Areas during Construction and Operation – Sung Shan New Village Residual Visual Impact during
Construction and Operation – Sung Shan New Village Vantage Points for
Photomontages – Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Photomontage of Vantage Points
– Sung Shan New Village Aerial Photograph – Tai Wo
(2017) Future Planning Context (OZP) –
Tai Wo Landscape Resources Plan – Tai
Wo Landscape Resources Photographs
– Tai Wo Landscape Character Areas Plan
– Tai Wo Landscape Character Areas
Photographs – Tai Wo Location of Visually Sensitive
Receivers and Visual Envelope – Tai Wo Existing VSR Views – Tai Wo Existing VSR Views – Tai Wo Existing VSR Views – Tai Wo Existing VSR Views – Tai Wo Preliminary Landscape Master
Plan – Tai Wo Landscape and Visual Mitigation
Measures – Plan – Tai Wo Landscape and Visual Mitigation
Measures – Sections – Tai Wo Residual Impact on Landscape
Resources during Construction and Operation – Tai Wo Residual Impact on Landscape
Character Areas during Construction and Operation – Tai Wo Residual Visual Impact during
Construction and Operation – Tai Wo Vantage Points for
Photomontages – Tai Wo Photomontage of Vantage Points
– Tai Wo Photomontage of Vantage Points
– Tai Wo Photomontage of Vantage Points
– Tai Wo Photomontage of Vantage Points
– Tai Wo Photomontage of Vantage Points
– Tai Wo Photomontage of Vantage Points
– Tai Wo Aerial Photograph – Lin Fa Tei (2017) Future Planning Context (OZP) –
Lin Fa Tei (W) Future Planning Context (OZP) –
Lin Fa Tei (E) Landscape Resources Plan – Lin
Fa Tei (W) Landscape Resources Plan – Lin
Fa Tei (E) Landscape Resources Photographs
– Lin Fa Tei Landscape Character Areas Plan
– Lin Fa Tei (W) Landscape Character Areas Plan
– Lin Fa Tei (E) Landscape Character Areas
Photographs – Lin Fa Tei Location of Visually Sensitive
Receivers and Visual Envelope – Lin Fa Tei Existing VSR Views – Lin Fa Tei Existing VSR Views – Lin Fa Tei Existing VSR Views – Lin Fa Tei Existing VSR Views – Lin Fa Tei Existing VSR Views – Lin Fa Tei Preliminary Landscape Master
Plan – Lin Fa Tei (W) Preliminary Landscape Master
Plan – Lin Fa Tei (E) Landscape and Visual Mitigation
Measures – Plan – Lin Fa Tei (W) Landscape and Visual Mitigation
Measures – Plan – Lin Fa Tei (E) Landscape and Visual Mitigation
Measures – Sections – Lin Fa Tei Landscape and Visual Mitigation
Measures – Sections – Lin Fa Tei Landscape and Visual Mitigation
Measures – Sections – Lin Fa Tei Residual Impact on Landscape
Resources during Construction and Operation – Lin Fa Tei
(W) Residual Impact on Landscape
Resources during Construction and Operation – Lin Fa Tei
(E) Residual Impact on Landscape
Character Areas during Construction and Operation – Lin Fa Tei (W) Residual Impact on Landscape Character
Areas during Construction and Operation – Lin Fa Tei
(E) Residual Visual Impact during
Construction and Operation – Lin Fa Tei Vantage Points for
Photomontages – Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Photomontage of Vantage Points
– Lin Fa Tei Aerial Photograph – Ha Che (N)
(2017) Aerial Photograph – Ha Che (S)
(2017) Future Planning Context (OZP) –
Ha Che (N) Future Planning Context (OZP) –
Ha Che (S) Landscape Resources – Ha Che
(N) Landscape Resources – Ha Che
(S) Landscape Resources Photographs
– Ha Che Landscape Character Areas – Ha
Che (N) Landscape Character Areas – Ha
Che (S) Landscape Character Areas
Photographs – Ha Che Location of Visually Sensitive
Receivers and Visual Envelope – Ha Che (N) Location of Visually Sensitive
Receivers and Visual Envelope – Ha Che (S) Existing VSR Views – Ha Che Existing VSR Views – Ha Che Existing VSR Views – Ha Che Existing VSR Views – Ha Che Existing VSR Views – Ha Che Preliminary Landscape Master
Plan – Ha Che (N) Preliminary Landscape Master
Plan – Ha Che (S) Landscape and Visual Mitigation
Measures – Plan – Ha Che (N) Landscape and Visual Mitigation
Measures – Plan – Ha Che (S) Landscape and Visual Mitigation
Measures – Sections – Ha Che Landscape and Visual Mitigation
Measures – Sections – Ha Che Not Used Residual Impact on Landscape
Resources during Construction and Operation – Ha Che (N) Residual Impact on Landscape
Resources during Construction and Operation – Ha Che (S) Residual Impact on Landscape
Character Areas during Construction and Operation – Ha Che (N) Residual Impact on Landscape
Character Areas during Construction and Operation – Ha Che (S) Residual Visual Impact during
Construction and Operation – Ha Che (N) Residual Visual Impact during
Construction and Operation – Ha Che (S) Vantage Points for
Photomontages – Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points –
Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Photomontage of Vantage Points
– Ha Che Proposed Works within
Geological Context Proposed Works within
Geological Context at Sung Shan New Village Locations of Previous
Archaeological Investigations at Lin Fa Tei and
Shui Lau Tin Detail of the 1866 San On District Map Detail of 1899 – 1904 Map
showing Historical Villages Detail of the 1957
Topographical Map at Ha Che Area Detail of the 1915
Topographical Map Aerial Photograph dated to 1949
at Lin Fa Tei Detail of 1967 Topographical
Map at Lin Fa Tei Detail of 1963 Aerial
Photograph at Ha Che River Area Detail of 1963 Aerial
Photograph at Tai Wo Area Detail of 1963 Aerial
Photograph at Sung Shan New Village Graded Historic Building within
Lin Fa Tei Area Graded Historic Building within
Ha Che Area Graded Historic Building within
Tai Wo Area Area Identified for
Archaeological Survey at Lin Fa Tei Study Area for Cultural
Heritage at Sung Shan New Village Study Area for Cultural
Heritage at Tai Wo Study Area for Cultural
Heritage at Lin Fa Tei Study Area for Cultural
Heritage at Ha Che |
List of Drawings |
|
Drawing No. |
Drawing Title |
General
Notes and Legends |
|
Proposed
Drainage Works at Sung Shan New Village – Option 1 |
|
Proposed
Drainage Works at Sung Shan New Village – Option 2 |
|
Proposed
Drainage Works at Sung Shan New Village – Option 3 |
|
Proposed
Drainage Works at Tai Wo – Option 1 |
|
Proposed
Drainage Works at Tai Wo – Option 2 |
|
Proposed
Drainage Works at Tai Wo – Option 3 |
|
Proposed
Drainage Works at Lin Fa Tei – Option 1 (Sheet 1 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 1 (Sheet 2 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 2 (Sheet 1 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 2 (Sheet 2 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 3 (Sheet 1 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 3 (Sheet 2 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 4 (Sheet 1 of
2) |
|
Proposed
Drainage Works at Lin Fa Tei – Option 4 (Sheet 2 of
2) |
|
Proposed
Drainage Works at Ha Che – Option 1 (Sheet 1 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 1 (Sheet 2 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 2 (Sheet 1 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 2 (Sheet 2 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 3 (Sheet 1 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 3 (Sheet 2 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 4 (Sheet 1 of 2) |
|
Proposed
Drainage Works at Ha Che – Option 4 (Sheet 2 of 2) |
List of Appendices
Appendix 3-1 PATH-2016 Grid covered
Appendices 4-1a
– 1d Locations of Works Areas
Appendix 4-2a Plant Inventory (Unmitigated Scenario)
Appendix 4-2b Predicted Construction Noise Levels
(Unmitigated Scenario)
Appendix 4-3a Plant Inventory (Mitigated Scenario)
Appendix 4-3b Predicted Construction Noise Levels
(Mitigated Scenario)
Appendix 4-4 Potential Overlapping Works Areas with
Other Projects
Appendix 4-5 Typical Section Drawing of
Temporary/Movable Noise Barrier
Appendix
5-1 Baseline Ecological Survey
Report
Appendix 5-2 Supplementary Report on Nesting
Activities at Ha Che Egretry
Appendix
6-1 Baseline Water Quality
Monitoring Result
Appendix 6-2 Supplementary Baseline Water Quality
Monitoring Result
Appendix 8-1 Final Contamination Assessment Plan
Appendix 9-1 Updated Tree Schedule
Appendix
10-1 Built Heritage Catalogue