Table of contents

 

EXECUTIVE SUMMARY.. 1

Introduction. 1

Environmental Monitoring Works. 1

Key Information in the Reporting Month. 2

Environmental License and Permits. 2

Future Key Issues. 3

1        introduction.. 4

Background. 4

Project Organizations. 4

Construction Activities undertaken during the Reporting Month. 5

Summary of EM&A Requirements. 7

2        AIR QUALITY.. 8

Monitoring Requirements. 8

3        WATER QUALITY.. 8

Monitoring Requirements. 8

4        NOISE.. 9

Monitoring Requirements. 9

Monitoring Locations. 9

Monitoring Equipment 9

Monitoring Parameters and Frequency. 10

Monitoring Methodology and QA/QC Procedures. 10

Maintenance and Calibration. 11

Results and Observations. 11

5        Comparison of em&a Results with eia predictions. 13

6        Ecology and Fisheries. 14

7        LANDSCAPE AND VISUAL IMPACT.. 14

8        ENVIRONMENTAL AUDIT.. 15

Site Audits. 15

Review of Environmental Monitoring Procedures. 15

Statues of Environmental Licensing and Permitting. 15

Status of Waste Management 17

Implementation Status of Environmental Mitigation Measures. 17

Implementation Status of Event and Action Plans. 17

Summary of Complaint, Warning, Notification of any Summons and Successful Prosecution. 18

9        FUTURE KEY ISSUES. 19

Monitoring Schedule for the Next Month. 20

10     CONCLUSIONS AND RECOMMENDATIONS. 21

Conclusions. 21

Recommendations. 21


lIST OF TABLES

 

Table I             Non-compliance Record for the Project in the Reporting Month

Table II           Summary Table for Key Information in the Reporting Month

Table 1.1         Key Project Contacts

Table 1.2         Construction Programme Showing the Inter-Relationship with Environmental Protection/Mitigation Measures

Table 4.1         Noise Monitoring Stations

Table 4.2         Noise Monitoring Equipment

Table 4.3         Frequency and Parameters of Noise Monitoring

Table 4.4         Other Noise Sources Identified Which Might Affect the Noise Monitoring Results

Table 4.5         Baseline Noise Level and Noise Limit Level for Monitoring Stations

Table 5.1         Comparison of Noise Monitoring Data with predictions in EIA Report and ERR

Table 8.1         Summary of Environmental Licensing and Permit Status

Table 8.2         Observations and Recommendations of Site Audit

 

 

lIST OF FIGUREs

 

Figure 1a-1h    Layout Plan of the Project Site

Figure 2           Locations of Construction Noise Monitoring Stations

Figure 3           Organization Chart

 

 

lIST OF APPENDIces

 

A            Work Programme

B             Action and Limit Levels for Noise

C             Copies of Calibration Certificates

D            Environmental Monitoring Schedules

E             Noise Monitoring Results and Graphical Presentations

F              Summary of Exceedance

G            Site Audit Summary

H            Event and Action Plans

I               Environmental Mitigation Implementation Schedule (EMIS)

J               Record of Environmental Complaint, Warning, Summon and Notification of Successful

Prosecution

K            Summary of Waste Generation and Disposal Record