Table
of contents
Environmental
Monitoring Works
Key
Information in the Reporting Month
Environmental
License and Permits
Construction
Activities undertaken during the Reporting Month
Monitoring
Parameters and Frequency
Monitoring Methodology and
QA/QC Procedures
5 Comparison of em&a Results with eia predictions
Review
of Environmental Monitoring Procedures
Statues
of Environmental Licensing and Permitting
Implementation
Status of Environmental Mitigation Measures
Implementation
Status of Event and Action Plans
Summary
of Complaint, Warning, Notification of any Summons and Successful Prosecution
Monitoring
Schedule for the Next Month
10 CONCLUSIONS
AND RECOMMENDATIONS
lIST OF TABLES
Table I Non-compliance Record for the Project in the Reporting Month
Table II Summary Table for Key Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Frequency and Parameters of Noise Monitoring
Table 4.4 Other Noise Sources Identified Which Might Affect the Noise Monitoring Results
Table 4.5 Baseline Noise Level and Noise Limit Level for Monitoring Stations
Table 5.1 Comparison of Noise Monitoring Data with predictions in EIA Report and ERR
Table 8.1 Summary of Environmental Licensing and Permit Status
Table 8.2 Observations and Recommendations of Site Audit
lIST
OF FIGUREs
Figure 1a-1h Layout Plan of the Project Site
Figure 2 Locations of Construction Noise
Monitoring Stations
Figure 3 Organization Chart
lIST
OF APPENDIces
B
Action and Limit Levels for Noise
C
Copies of Calibration Certificates
D
Environmental Monitoring Schedules
E
Noise Monitoring Results and Graphical
Presentations
I
Environmental Mitigation Implementation
Schedule (EMIS)
J
Record
of Environmental Complaint, Warning, Summon and Notification of Successful