Section            Contents                                                                                             Pages.

 


1.                     INTRODUCTION                                                                                1-1

 

2.                     PROJECT DESCRIPTION                                                                   2-1

 

3.                     AIR QUALITY                                                                                    3-1

 

4.                     NOISE                                                                                                  4-1

 

5.                     WATER QUALITY                                                                               5-1

 

6.                     WASTE MANAGEMENT                                                                      6-1

 

7.                     LAND CONTAMINATION                                                                   7-1

 

8.                     ECOLOGY                                                                                            8-1

 

9.                     FISHERIES                                                                                            9-1

 

10.                    CULTURAL HERITAGE                                                                     10-1

 

11.                     LANDSCAPE AND VISUAL IMPACT ASSESSMENT                        11-1

 

12.                    ENVIRONMENTAL MONITORING AND AUDIT                             12-1

 

13.                    CONCLUSIONS                                                                                  13-1

 

 

           

List of Figure for Report

 

Figure 2.1a

Elements for the yuen long and kam tin sewerage and sewage disposal stage I

Figure 2.1b

Study Areaa of designated and potentially designated elements of the project

Figure 3.3a

Locstion of air sensitive receivers (D1, D3, D4, D5, D6, D8, D17, D22, - D27) (1 of 6)

Figure 3.3b

Location of air sensitive receivers (D10) (2 of 6)

Figure 3.3c

Location of air sensitive receivers (D11, D19, D21) (3 of 6)

Figure 3.3d

Location of air sensitive receivers (D12 – D16, D42) (4 of 6)

Figure 3.3e

Location of air sensitive receivers (D28, D29) (5 of 6)

Figure 3.3f

Location of air sensitive receivers (D30, D31, D32, D33, D38, D39, D41) (6 of 6)

Figure 3.7a

Location of dust monitoring stations (AM4, AM6 & AM10)

Figure 3.7b

Location of dust monitoring station (AM5)

Figure 3.7c

Location of dust monitoring stations (AM1, AM2, & AM7)

Figure 3.7d

Location of dust monitoring station (AM11)

Figure 3.7e

Location of dust monitoring stations ( AM3, AM8 & AM9)

Figure 4.3a

Location of noise sensitive receivers (D1, D3, D4, D5, D6, D8, D17, D22 – D27) (1 of 6)

Figure 4.3b

Location of noise sensitive receivers (D9) (2 of 6)

Figure 4.3c

Location of noise sensitive receivers (D11, D18, D19, D21) (3 of 6)

Figure 4.3d

Location of noise sensitive receivers (D12 – D15, D42) (4 of 6)

Figure 4.3e

Location of noise sensitive receivers (D28, D29) (5 of 6)

Figure 4.3f

Location of noise sensitive receivers (D30, D31, D32, D33, D36, D38, D39, D41) (6 of 6)

Figure 5.2a

Location of deep bay WCZ

Figure 5.3a

Location of EPD rouine river and water quality monitoring stations

Figure 5.3b

Location of stream crossings and marine sensitive areas

Figure 5.4a

Deep bay water quality model grid

Figure 5.4b

Locaiton of Polluting Discharges in the Pollution Load Inventory

Figure 5.4c

Location of catchment Area

Figure 5.6a

Location of water quality modelling output points

Figure 7.4a

Potential Land contamination sites at yuen long and kam tim

Figure8.3a

Location of bird point count sites and channel gillnet sampling

Figure 8.4a

Country parks, SSSIs, and area covered by previous studies within and the vicinity if the study areas

Figure 8.4b-1

Habitat map and location of humped fig tree recorded within the study area

Figure 8.4b-2

Habitat map and location of humped fig tree recorded within the study area

Figure 8.4b-3

Habitat map and location of humped fig tree recorded within the study area

Figure 8.4c

Photographic records of various habitats within the study area

Figure 8.4d

Photographic records of various habitats within the study area

Figure 8.4e

Rare/restricted and protected plant species recorded within the study area

Figure 8.4f

Temporal trends of bird abundance and richness within the study area

Fgirue 8.4g

Temporal trends of bird abundance and richness within WCA and WBA

Figure 8.4h

Location of flora and fauna of conservation interst, as well as breeding birds, within the study area

Figure 8.4i

Stream courses within the study area

Figure 8.4j

Photographic records of pumping station sites P1-P7

Figure 8.4k

Location of proposed pumping station P2

Figure 8.7a

Location and extent of Sewer pipeline that have no work within winter period (november to march)

Figure 9.4a

Aquacul ture fisheries resources and operations within the study area and vicinity

Figure 9.4b

Representative images of fish ponds in the study area

Figure 10.4a

Heritage sits within study area

Figure 10.4b

Heritage sits within study area

Figure 10.6a

Sites inspection of Ng Ka Tseun 22 November 2001

Figure 11.3a

BASELINE STUDY – LANDSCAPE CHARACTER UNIT & svrS

Figure 11.3b

BASELINE STUDY – LANDSCAPE CHARACTER UNIT & svrS

Figure 11.3c

type of sensitive visual receivers (type photographics)

Figure 11.4a

Approximate locations of pumping stations

Figure 11.4b

Study area

Figure 11.4c

Landscape Character units – photographic Record

Figure 11.4d

planning and development control framework

Figure 11.4e

planning and development control framework

Figure 11.5a

Landscape impacts

Figure 11.5b

lANDSCAPE IMPACTS

Figure 11.5ci

Trees may be affected by the project

Figure 11.5cii

Trees may be affected by the project

Figure 11.5d

visual impacts

Figure 11.5e

visual impacts

Figure 11.6a

landscape mitigation measures of kam tin pumping station (p1)

Figure 11.6b

landscape mitigation measures of sha po pumping station (p2)

Figure 11.6c

landscape mitigation measures of nam Sang Wai pumping station (p3)

Figure 11.6d

landscape mitigation measures of shui tsan tin pumping station (p4)

Figure 11.6e

landscape mitigation measures of ng ka tsuen pumping station (p5)

Figure 11.6e2

Photomontage showing mitigation measures of ng ka tsuen punping station

Figure 11.6f

landscape mitigation measures of pang ka tsuen pumping station (p6)

Figure 11.6g

landscape mitigation measures of leung uk tsuen pumping station (p7)

 

 

                                                                                                                                                                               

 

 

ANNEXES

 

Annex A

Noise

Annex B

Water Quality Modelling

Annex C

Contamination Assessment Plan

Annex D

Findings of 12-Month Ecological Survey

Annex E

Cultural Heritage Biblography

Annex F1

Archaeological Survey Report and Historical Building and

Features Location Maps and Photographic Record

Annex F2

Location Maps and Photographics Records of Identified Historical Building and Features

Annex G

Implementation Schedule

 

 

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               


               

 

List of figure for Annexs

 

Figure 1a

Elements for the yuen long  and kam tin sewerage dosposal stage I

Figure 2a

Deep bay water quality model grid

Figure 2b

Location of polluting discharges in the Pollution load Inventory

Figure 4.1a

Locations of catchment area

Figure 5a

Locations of water quality modelling outpiut points

Annex B2

Contour Plots of water quality Modelling

Figure A

Elements for the yuen long  and kam tin sewerage and sewage dIsposal stage I

Figure B

Section of the cultural layer exposed in old settlement site (lan wai) section

Figure C

The archaeological auger holes and test pits locations at non-designated elements study ares

Figure D

The archaeological auger holes and test pits locations at Designated/potentially designated elements study ares

Figure E

Auger holes location at ha tsuen

Figure F

Section of the old settlement site (lan wal) and auger hole 03, 04, 05 and 06

Figure G

The tp2, 3, 4, ah7, 8, 9, 10, 11, 17, 18, 19, 28 and 29 location

Figure H

Land use changes of P1

Figure I

The finds revealed from test pit4 and ah15

Figure J

Section drawing of tp1, tp2, tp3 and tp4

Figure K

The section of test pits

Figure L

The song dynasty pottery shards and song to ming root tile of content 3, tp4

Figure M

The artifacts of content 2 and 3 of tip3

Figure N

The aRtIfacts of lan wai, ha tsuen

Figure O

Harris Matrix of TP1, 2, 3, 4.

Annex F2

Location Maps and Photographic Records of Identified Historical Building and Features

 

SitE A, Site B, Site B1, Site C, Site D, Site D1,  Site E, Site F,  Site F&G, Site G, Site H & I

 

 

 

                                                                                                Back to Main