Emissions Control Project at Castle Peak Power Station “B” Units

ENVIRONMENTAL IMPACT ASSESSMENT

TABLE OF CONTENTS

Chapter

Title

 

 

1.

INTRODUCTION

2.

Consideration of Alternatives

3.

Air Quality Assessment

4.

NOISE

5.

WATER QUALITY ASSESSMENT

6.

WASTE MANAGEMENT

7.

LAND CONTAMINATION

8.

ECOLOGICAL ASSESSMENT

9

VISUAL ILLUSTRATION

10.

EM&A REQUIREMENT AND IMPLEMENTATION OF MITIGATION

11.

SUMMARY OF ENVIRONMENTAL OUTCOMES AND CONCLUSIONS

 

 

ANNEXES

 

 

Annex A

Wind Tunnel Test Methodology and Result

 

 

Annex B

Noise Assessment Supporting Information

 

Annex B1 – Measured Prevailing Noise Levels at NSRs

 

Annex B2 – Construction Programme for Noise Assessment

 

Annex B3 – Construction Plant Inventory

 

Annex B4 – Construction Noise Assessment

 

Annex B5 – Equipment Inventory during Operational Phase

 

Annex B6 – Operational Noise Assessment

 

 

Annex C

Supplementary Information to Water Quality Impact Assessment

 

Annex C1 – Results of Elutriate Test

 

Annex C2 – Details of Model Refinement

 

Annex C3 – Results of Water Quality Model

 

 

Annex D

Marine Sediment Quality Documents

 

Annex D1 – Marine Sediment Quality Plan

 

Annex D1a – Drawings

 

Annex D1b – Proposed Sample Containers

 

Annex D1c – Standard Operating Procedure (SOP) for Extrusion & Homogenization of Sediment Samples

 

Annex D1d – Analytical Methods

 

Annex D2 – Marine Sediment Testing Results

 

 

Annex E

Land Contamination Assessment Documents

 

Remediation Action Plan

 

Annex E1 – Contamination Assessment Report

 

Annex E1a – Contamination Assessment Plan

 

Annex A – Selected Site Photographs

 

Annex B – Landfill Disposal Criteria

 

Annex E1b – Borehole Logs

 

Annex E1c – Groundwater Monitoring Wells

 

Annex E1d – Selected Site Photographs

 

Annex E1e – Laboratory Reports

 

Annex E1f – Dutch List

 

 

Annex F

Photomontages