Background of the Project
The
Assignment
Objectives
of the Assignment
Assessment
Area
Structure
of the Report
Project Location
Need
of the Project
Consideration
of Alternatives
Project
Description
Project
Programme
Interactions
with Other Projects
Introduction
Environmental
Legislation, Policies, Plans, Standards and Criteria
Description
of the Environment
Air
Sensitive Receivers
Identification
of Environmental Impacts
Assessment
Methodology
Prediction
and Evaluation of Environmental Impacts
Mitigation
of Adverse Environmental Impact
Evaluation
of Residual Impacts
Environmental
Monitoring and Audit
Conclusion
Introduction
Environmental
Legislation, Policies, Plans, Standards and Criteria
Description
of the Environment
Noise
Sensitive Receivers
Identification
of Environmental Impacts
Assessment
Methodology
Prediction
and Evaluation of Environmental Impacts
Mitigation
of Adverse Environmental Impacts
Evaluation
of Residual Impacts
Environmental
Monitoring and Audit
Conclusion
Introduction
Environmental
Legislation and Guidelines
Baseline
Conditions
Identification
of Sensitive Receivers
Assessment
Methodology
Identification
of Potential Impacts
Evaluation
of Potential Impacts
Mitigation
Measures
Evaluation
of Residual Impact
Environmental
Monitoring and Audit Requirements
Conclusion
Introduction
Environmental
Legislation and Guidelines
Assessment
Methodology
Identification
and Evaluation of Potential Impacts
Mitigation
Measures
Evaluation
of Residual Impact
Environmental
Monitoring and Audit Requirements
Conclusion
Introduction
Review
of Planning and Development Control Framework
Environmental
Legislation and Standards
Assessment
Methodology
Baseline
Study
Landscape
Impact Assessment (LIA)
Visual
Impact Assessment (VIA)
Conclusion
Introduction
Environmental
Legislation and Criteria
Desk-based
Review
Impact
Assessment
Mitigation
Recommendations
Conclusions
9
ENVIRONMENTAL MONITORING AND
AUDIT
Introduction
Air
Quality Impact
Noise
Impact
Water
Quality Impact
Waste
Management Implications
Landscape
and Visual Impact
Cultural
Heritage
10
CONCLUSION
Introduction
Environmental
Outcomes
Air
Quality Impact
Noise
Impact
Water
Quality Impact
Waste
Management Implications
Landscape
and Visual Impact
Cultural
Heritage Impact
Overall
Conclusion
Introduction
List of Tables
Table
2.1 Comparison of Alternative
Locations - Engineering Considerations and Public Concern
Table 2.2 Comparison of Alternative Locations -
Environmental Considerations
Table 3.1
Table 3.3 Summary of Representative Air
Sensitive Receivers
Table 3.4 Predicted maximum odour levels at
ASRs (Unmitigated)
Table 3.5 Predicted maximum odour levels at
ASRs (Mitigated)
Table 4.1 Area Sensitivity Ratings (ASRs)
Table 4.2 Acceptable Noise Levels (ANLs)
(dB(A))
Table 4.3 Details of Noise Sensitive Receivers
Table 5.2 Summary of Water Quality Monitoring
Results for
Table 6.1 Summary of Waste Handling Procedures
and Disposal Routes
Table 7.2 Visual Sensitive Receivers (VSRs) and
their Sensitivity to Change
Table 7.3 VSRs and Their Magnitude of Impacts
Table 7.4 Significance of Landscape Adverse
Impacts in the Construction and Operation Phases
Table 7.5 Significance of Visual Adverse
Impacts in the Construction and Operational Phases
Table 7.6 Proposed Landscape and Visual
Mitigation Measures in Construction Phase
Table 7.7 Proposed Landscape and Visual Mitigation
Measures in Operation Phase
Table 10.1 Summary of Key Environmental
Outcomes/Benefits
Table 11.1 Implementation Schedule for Air
Quality Impact
Table 11.2 Implementation Schedule for Noise
Impact
Table 11.3 Implementation Schedule for Water
Quality Impact
Table 11.4 Implementation Schedule for Waste
Management Implications
Table 11.5 Implementation Schedule for Landscape
and Visual Impact
Table 11.6 Implementation Schedule for Cultural
Heritage Impact
List of Figures
Figure 1.1 Location
of Proposed Tuen Mun Area 54 Sewage Pumping Station
Figure 2.1 Location of Proposed Tuen Mun Area 54 Sewage Pumping Station at Site 4A
Figure 2.2 Alternative
Sites Considered for Tuen Mun Area 54 Sewage Pumping Station
Figure 2.3 Tentative
Construction Programme
Figure 3.1 Locations of Representative Air
Sensitive Receivers
Figure 4.1 Locations of Representative Noise
Sensitive Receivers
Figure 5.1 Location of EPD River Water Quality Monitoring Stations
Figure 7.1.1 Existing Aerial Photography
Figure 7.1.2 Planning & Development Framework (OZP)
Figure 7.2.1 Landscape Resources
Figure 7.2.2 Photos of Landscape Resources
Figure 7.3.1 Landscape Character Area
Figure 7.3.2 Photos of Landscape Character Area
Figure 7.4.1 Visual Sensitive Receiver
Figure 7.4.2 Photos of Visual Sensitive Receivers Group
Figure 7.4.3 View for Visual Sensitive Receivers
Figure 7.4.4 View for Visual Sensitive Receivers
Figure 7.5.1 Residual Landscape Resource Impacts in
Construction Phase
Figure 7.5.2 Residual Landscape Resource Impacts in
Operation Phase
Figure 7.5.3 Residual Landscape Character Area Impacts
in Construction Phase
Figure 7.5.4 Residual Landscape Character Area Impacts
in Operation Phase
Figure 7.5.5 Residual Visual Impacts in Construction
Phase
Figure 7.5.6 Residual Visual Impacts in Operation Phase
Figure 7.6.1 Tuen Mun Area 54 - Landscape and Visual
Mitigation Measures
Figure 7.7.1 Photomontage from View Point 2
Figure 8.1 Extent of Kei Lun Wai Archaeological
Site
List of Appendices
Appendix 3.1 Calculation
of Emission Rate and Information of Vent Pipes
Appendix 3.2 Details
of Operational Phase Air Quality Impact Assessment
Appendix 3.3 Tentative School Layout with Larger Buffer Distance
Appendix 4.1 Construction
Noise Impact Assessment