1 |
||
1.1 |
Project Background |
|
1.2 |
Background to this EIA |
|
1.3 |
Purpose and Approach of the EIA Study |
|
1.4 |
Structure of this EIA Study Report |
|
2 |
||
2.1 |
Location and Description of the Project |
|
2.2 |
Need of the Project |
|
2.3 |
Scenarios With and Without the Project |
|
2.4 |
Consideration of Alternative Design and
Layout |
|
2.5 |
Consideration of Alternative
Construction Methods and Sequences of Work |
|
2.6 |
Selected of Preferred Scenario |
|
2.7 |
Effluent Reuse |
|
2.8 |
Human Health Impacts due to Effluent
Reuse |
|
2.9 |
Project Implementation Programme |
|
2.10 |
Public Consultations |
|
2.11 |
Project Interface / Concurrent Projects |
|
3 |
||
3.1 |
Introduction |
|
3.2 |
Relevant Legislations, Standards &
Guidelines |
|
3.3 |
Baseline Environmental Conditions |
|
3.4 |
Air Sensitive Receivers |
|
3.5 |
Identification of Pollution Sources |
|
3.6 |
Construction Dust Impact Assessment
Methodology |
|
3.7 |
Prediction of Construction Dust Impact |
|
3.8 |
Operational Phase Odour Assessment
Methodology |
|
3.9 |
Prediction of Odour Impact |
|
3.10 |
Mitigation Measures |
|
3.11 |
Environmental Monitoring and Audit
Requirements |
|
3.12 |
Conclusion |
|
4 |
||
4.1 |
Introduction |
|
4.2 |
Relevant Legislations, Standards and
Guidelines |
|
4.3 |
Description of the Existing Noise
Environment |
|
4.4 |
Construction Noise Impact Assessment |
|
4.5 |
Operational Noise Impact Assessment |
|
4.6 |
Environmental Monitoring and Audit Requirements |
|
4.7 |
Conclusion |
|
5 |
||
5.1 |
Introduction |
|
5.2 |
Relevant Legislations, Standards &
Guidelines |
|
5.3 |
Assessment Methodology |
|
5.4 |
Study Area and Sensitive Receivers |
|
5.5 |
Baseline Water Quality |
|
5.6 |
Water Quality Impact Assessment |
|
5.7 |
Water Pollution Mitigation and
Management |
|
5.8 |
Residual Impacts |
|
5.9 |
Environmental Monitoring and Audit
Requirements |
|
5.10 |
Conclusion |
|
6 |
||
6.1 |
Introduction |
|
6.2 |
Relevant Legislations, Standards &
Guidelines |
|
6.3 |
Assessment Methodology |
|
6.4 |
Construction Phase Waste Generation and
Potential Impacts |
|
6.5 |
Operational Phase Waste Generation and
Potential Impacts |
|
6.6 |
Mitigation Measures |
|
6.7 |
Residual Impacts |
|
6.8 |
Environmental Monitoring and Audit
Requirements |
|
6.9 |
Conclusion |
|
7 |
||
7.1 |
Introduction |
|
7.2 |
Relevant Legislation, Standards &
Guidelines |
|
7.3 |
Assessment Methodology |
|
7.4 |
Baseline Environmental Condition |
|
7.5 |
Site History |
|
7.6 |
Review of Environmental Information from
the Government |
|
7.7 |
Identification of Sensitive Receivers |
|
7.8 |
Identification and Evaluation of
Potential Impacts |
|
7.9 |
Residual Impacts |
|
7.10 |
Environmental Monitoring and Audit
Requirements |
|
7.11 |
Conclusion |
|
8 |
||
8.1 |
Introduction |
|
8.2 |
Relevant Legislations, Standards &
Guidelines |
|
8.3 |
Assessment Methodology |
|
8.4 |
Description of Existing Ecological
Baseline Conditions |
|
8.5 |
Evaluation of Habitats and Species of
Ecological Importance |
|
8.6 |
Impact Identification |
|
8.7 |
Impact Evaluation |
|
8.8 |
Impact Avoidance and Mitigation Measures |
|
8.9 |
Residual Impacts |
|
8.10 |
Environmental Monitoring and Audit
Requirements |
|
8.11 |
Conclusion |
|
8.12 |
References |
|
9 |
||
9.1 |
Introduction |
|
9.2 |
Relevant Legislations, Standards &
Guidelines |
|
9.3 |
Study Area and Sensitive Receivers |
|
9.4 |
Methodology for Baseline Establishment
and Assessment |
|
9.5 |
Description of Physical Environment
Background |
|
9.6 |
Environmental Impacts to Fisheries |
|
9.7 |
Mitigation Measures |
|
9.8 |
Residual Impacts |
|
9.9 |
Environmental Monitoring and Audit
Requirements |
|
9.10 |
Conclusion |
|
9.11 |
References |
|
10 |
||
10.1 |
Introduction |
|
10.2 |
Relevant Legislations, Standards &
Guidelines |
|
10.3 |
Archaeological Impact Assessment |
|
10.4 |
Built Heritage Impact Assessment |
|
11 |
||
11.1 |
Introduction |
|
11.2 |
Project Summary |
|
11.3 |
Review of Planning and Development
Control Framework |
|
11.4 |
Relevant Legislations, Standards & Guidelines |
|
11.5 |
Landscape and Visual Impact Assessment
Methodology |
|
11.6 |
Existing Landscape and Visual Baseline |
|
11.7 |
Landscape and Visual Impact Assessment |
|
11.8 |
Recommended Mitigation Measures |
|
11.9 |
Residual Impacts |
|
11.10 |
Conclusion |
|
12 |
||
12.1 |
Introduction |
|
12.2 |
Air Quality |
|
12.3 |
Noise |
|
12.4 |
Water Quality |
|
12.5 |
Waste Management |
|
12.6 |
Land Contamination |
|
12.7 |
Ecology |
|
12.8 |
Fisheries |
|
12.9 |
Cultural Heritage |
|
12.10 |
Landscape and Visual |
|
13 |
||
13.1 |
Introduction |
|
14 |
||
14.1 |
Key Environmental Outcomes |
|
14.2 |
Overall Conclusions |
List of
Figures |
||
Proposed Works in Cheung Chau |
||
Proposed General Layout of Cheung Chau
STW |
||
Cheung Chau Sewerage System Alternatives
to KYW SPS - Deep Sewer Option |
||
Schematic Flow Diagram of Upgraded
Cheung Chau STW |
||
Layout Plan of Emergency Outfall of Pak
She SPS |
||
Air Sensitive Receivers (Sheet 1 of 15) |
||
Air Sensitive Receivers (Sheet 2 of 15) |
||
Air Sensitive Receivers (Sheet 3 of 15) |
||
Air Sensitive Receivers (Sheet 4 of 15) |
||
Air Sensitive Receivers (Sheet 5 of 15) |
||
Air Sensitive Receivers (Sheet 6 of 15) |
||
Air Sensitive Receivers (Sheet 7 of 15) |
||
Air Sensitive Receivers (Sheet 8 of 15) |
||
Air Sensitive Receivers (Sheet 9 of 15) |
||
Air Sensitive Receivers (Sheet 10 of 15) |
||
Air Sensitive Receivers (Sheet 11 of 15) |
||
Air Sensitive Receivers (Sheet 12 of 15) |
||
Air Sensitive Receivers (Sheet 13 of 15) |
||
Air Sensitive Receivers (Sheet 14 of 15) |
||
Air Sensitive Receivers (Sheet 15 of 15) |
||
Air Sensitive Receivers Key Plan |
||
Location of Proposed Concrete Batching
Plant and Emission Sources at Cheung Chau STW |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 1.5m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 5m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 10m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 15m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 20m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 25m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP Concentration
in µg/m3 at 1.5m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 5m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 10m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 15m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP Concentration
in µg/m3 at 20m above ground (Unmitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 25m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 1.5m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 5m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 10m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 15m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 20m above ground (Unmitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 25m above ground (Unmitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 1.5m above ground (Mitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 5m above ground (Mitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 10m above ground (Mitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 15m above ground (Mitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 20m above ground (Mitigated) |
||
Contour Plot of 1-Hour TSP Concentration
in µg/m3 at 25m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 1.5m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 5m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 10m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 15m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 20m above ground (Mitigated) |
||
Contour Plot of 24-Hour TSP
Concentration in µg/m3 at 25m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 1.5m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 5m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 10m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 15m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 20m above ground (Mitigated) |
||
Contour Plot of Annual TSP Concentration
in µg/m3 at 25m above ground (Mitigated) |
||
Potential Odour Sources Identified in
the Pak She SPS |
||
Contour Plot of 5-second Odour
concentration in OU unit at 1.5m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 5m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 10m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour concentration
in OU unit at 15m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 20m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 25m above ground (Unmitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 1.5m above ground (Mitigated) |
||
Contour Plot of 5-second Odour concentration
in OU unit at 5m above ground (Mitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 10m above ground (Mitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 15m above ground (Mitigated) |
||
Contour Plot of 5-second Odour
concentration in OU unit at 20m above ground (Mitigated) |
||
Contour Plot of 5-second Odour concentration
in OU unit at 25m above ground (Mitigated) |
||
Location of Background Noise Measurement |
||
Noise Sensitive Receivers (Sheet 1 of
14) |
||
Noise Sensitive Receivers (Sheet 2 of 14) |
||
Noise Sensitive Receivers (Sheet 3 of
14) |
||
Noise Sensitive Receivers (Sheet 4 of
14) |
||
Noise Sensitive Receivers (Sheet 5 of
14) |
||
Noise Sensitive Receivers (Sheet 6 of
14) |
||
Noise Sensitive Receivers (Sheet 7 of
14) |
||
Noise Sensitive Receivers (Sheet 8 of
14) |
||
Noise Sensitive Receivers (Sheet 9 of
14) |
||
Noise Sensitive Receivers (Sheet 10 of
14) |
||
Noise Sensitive Receivers (Sheet 11 of
14) |
||
Noise Sensitive Receivers (Sheet 12 of
14) |
||
Noise Sensitive Receivers (Sheet 13 of
14) |
||
Noise Sensitive Receivers (Sheet 14 of
14) |
||
Cheung Chau Sewage Treatment Works
Location of Operational Fixed Plant Noise Source |
||
Water Sensitive Receivers |
||
Layout Plan of Submarine Outfall and
Emergency Outfall of Cheung Chau STW |
||
Model Output Locations |
||
Potential Contaminated Site |
||
Year 1924 Aerial Photo Photo No: 16 |
||
Year 1977 Aerial Photo Photo No: 18327 |
||
Year 1980 Aerial Photo Photo No: 29188 |
||
Year 1984 Aerial Photo Photo No: 57247 |
||
Year 1990 Aerial Photo Photo No: A20681 |
||
Year 1996 Aerial Photo Photo No: A43432 |
||
Year 2011 Aerial Photo Photo Nos:
CW89340 & CW89559 |
||
Site of Conservation Importance within
Southern Water Control Zone |
||
Distribution of Finless Porpoise
Sightings in Marine Ecological Assessment Area in 2012-2013 |
||
Distribution of Adult Fish Production |
||
Distribution of Fish Fry Production |
||
The Value of Fisheries Production |
||
Zones for Culture Fisheries in Hong Kong |
||
Important Spawning Ground for Commercial
Species in Hong Kong |
||
Important Nursery Ground for Commercial
Species in Hong Kong |
||
Location of Site of Archaeological
Interest - Key Plan |
||
Location of Tung Wan Site of
Archaeological Interest and Cheung Chau Rock Carving |
||
Location of Tai Kwai Wan Site of
Archaeological Interest |
||
Location of Sai Wan Site of
Archaeological Interest |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 1 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 2 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 3 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 4 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 5 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 6 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 7 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 8 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 9 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 10 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 11 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 12 of 15) |
||
Assessment of Archaeological Potential within
Project in Cheung Chau (Sheet 13 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 14 of 15) |
||
Assessment of Archaeological Potential
within Project in Cheung Chau (Sheet 15 of 15) |
||
Location of Built Heritage Resources
(Sheet 1 of 15) |
||
Location of Built Heritage Resources
(Sheet 2 of 15) |
||
Location of Built Heritage Resources
(Sheet 3 of 15) |
||
Location of Built Heritage Resources
(Sheet 4 of 15) |
||
Location of Built Heritage Resources
(Sheet 5 of 15) |
||
Location of Built Heritage Resources
(Sheet 6 of 15) |
||
Location of Built Heritage Resources
(Sheet 7 of 15) |
||
Location of Built Heritage Resources
(Sheet 8 of 15) |
||
Location of Built Heritage Resources
(Sheet 9 of 15) |
||
Location of Built Heritage Resources
(Sheet 10 of 15) |
||
Location of Built Heritage Resources
(Sheet 11 of 15) |
||
Location of Built Heritage Resources
(Sheet 12 of 15) |
||
Location of Built Heritage Resources
(Sheet 13 of 15) |
||
Location of Built Heritage Resources
(Sheet 14 of 15) |
||
Location of Built Heritage Resources
(Sheet 15 of 15) |
||
Location of Landscape Resource |
||
Location of Landscape Character Areas |
||
Location of Visually Sensitive Receivers
and Visual Envelop |
||
Photo of Landscape Resources, Landscape Character
Areas and Visually Sensitive Receivers (Sheet 1 of 3) |
||
Photo of Landscape Resources, Landscape
Character Areas and Visually Sensitive Receivers (Sheet 2 of 3) |
||
Photo of Landscape Resources, Landscape
Character Areas and Visually Sensitive Receivers (Sheet 3 of 3) |
||
Photomontage of the Proposed Cheung Chau
STW (View from VSR1) |
||
Photomontage of the Proposed Cheung Chau
STW (View from VSR2) |
||
Photomontage of the Proposed Cheung Chau
STW (View from VSR3) |
||
Photomontage of the Proposed Cheung Chau
STW (View from VSR4) |
||
Photomontage of the Proposed Cheung Chau
STW (View from VSR5) |
List of
Appendices
Appendix 3.1 Odour
Survey Results
Appendix 3.2 TSP
Emissions Factors Calculations
Appendix 3.3 TSP
Modelling Output File Sample
Appendix 3.4 Odour
Emissions Factors Calculations
Appendix 3.5 Odour
Modelling Output File Sample
Appendix 3.6 Correspondences
with Interfacing Projects
Appendix 4.1 Construction
Plant Inventory – Unmitigated Scenario
Appendix 4.2 Photographs
of NSRs
Appendix 4.3 Detailed
Calculation of Construction Noise Levels at Representative NSRs – Unmitigated
Scenario
Appendix 4.4 Construction
Plant Inventory – Mitigated Scenario
Appendix 4.5 Detailed
Calculation of Construction Noise Levels at Representative NSRs – Mitigated
Scenario
Appendix 4.6 Detailed
Calculation of Construction Stage Noise Levels at Representative NSRs –
Mitigated Scenario
Appendix 4.7 Detailed
Calculation of Operation Noise Levels at Representative NSRs – Unmitigated
Scenario
Appendix 4.8 Detailed
Calculation of Operation Noise Levels at Representative NSRs – Mitigated Scenario
Appendix 5A Details on Hydrodynamic and Water Quality Modelling
Appendix 5B Pollution Loads Calculations
Appendix 5C Output Figures from Water Quality Modelling
Appendix 7.1 Correspondences with Government Department for Potential Land Contamination Sites
Appendix 8.1 Ecological Baseline Survey Report
Appendix
10.1 Methodology for Archaeological
Watching Brief
Appendix 10.2 Built Heritage Catalogue
Appendix 11.1 Existing Trees Conditions and Tree Schedule for the Trees at the Development Site Extracted from the Tree Survey Report under “Agreement No. CE 31/2007(DS) Upgrading of Cheung Chau and Tai O Sewage Collection, Treatment and Disposal Facilities – Investigation”
Appendix 11.2 Proposed Tree Planting Plan of Cheung Chau STW