Table of Contents
1.1 Project Background
1.2 Designated Projects under the EIA Ordinance
1.3 Objectives of the EIA Study
1.4 Report Structure
2.1 Location and Scale of Project
2.2 Site History
2.3 The Need and Justification of the Project
2.4 Consideration of Alternative Options
2.5 Selection of Preferred Scenario
2.6 Benefits of the Project
2.7 With and Without the Project Scenarios
2.8 Construction Methodology
2.9 Works Programme
2.10 Interactions with Other Projects
3.1 Introduction
3.2 Environmental Legislation, Standards and Guidelines
3.3 Description of the Environment
3.4 Identification and Evaluation of Environmental Impacts
3.5 Recommended Mitigation Measures
3.6 Evaluation of Residual Impacts
3.7 Environmental Monitoring and Audit Requirements
3.8 Conclusion
4.1 Introduction
4.2 Environmental Legislation, Standards and Guidelines
4.3 Description of the Environment
4.4 Identification of Potential Environmental Impacts
4.5 Assessment Methodology
4.6 Prediction and Evaluation of Environmental Impacts
4.7 Recommended Mitigation Measures
4.8 Evaluation of Residual Impacts
4.9 Environmental Monitoring and Audit Requirements
4.10 Conclusion
5.1 Introduction
5.2 Environmental Legislation, Standards and Guidelines
5.3 Study Approach
5.4 Risk Acceptability Criteria
5.5 Cases to be Studied
5.6 Meteorological Data
5.7 Review of the Current Site
5.8 Review of SMBWTW
5.9 Population Assumptions Adopted in this Study
5.10 Modelling Approach and Calibration
5.11 Hazard Identification
5.12 Frequency Assessment
5.13 Consequence Assessment
5.14 Risk Assessment
5.15 Uncertainty Analysis
5.16 Risk Mitigation Measures Identification and Analysis
5.17 Conclusion
5.18 Reference
6.1 Introduction
6.2 Environmental Legislation, Policies, Plans, Standards and Criteria
6.3 Water Sensitive Receivers
6.4 Description of the Environment and Baseline Conditions
6.5 Assessment Methodology
6.6 Identification of Potential Impacts
6.7 Prediction and Evaluation of Environmental Impacts
6.8 Mitigation of Environmental Impacts
6.9 Evaluation of Residual Impacts
6.10 Environmental Monitoring and Audit
6.11 Conclusion
7.
WASTE MANAGEMENT IMPLICATIONS
7.1 Introduction
7.2 Environmental Legislation, Standards & Guidelines
7.3 Assessment Methodology
7.4 Identification of Potential Environmental Impacts
7.5 Predicted and Evaluation of Environmental Impacts
7.6 Recommended Mitigation Measures for Construction Phase
7.7 Evaluation of Residual Impacts
7.8 Environmental Monitoring and Audit Requirements
7.9 Conclusion
8.1 Introduction
8.2 Environmental Legislation, Standards and Guidelines
8.3 Assessment Methodology
8.4 Description of the Environment
8.5 Evaluation of Baseline Ecological Value
8.6 Impact Assessment and Evaluation
8.7 Mitigation Measures
8.8 Residual Impacts
8.9 Environmental Monitoring and Audit Requirements
8.10 Conclusion
9.
LANDSCAPE AND VISUAL IMPACT
9.1 Introduction
9.2 Environmental Legislation, Standards and Criteria
9.3 Assessment Methodology
9.4 Review of Planning and Development Control Framework
9.5 Baseline Study
9.6 Landscape Impact Assessment
9.7 Visual Impact Assessment
9.8 Landscape and Visual Mitigation Measures
9.9 Residual Impact
9.10 Environmental Monitoring and Audit
9.11 Conclusion
10.
ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS
10.1 Introduction
10.2 Air Quality
10.3 Noise
10.4 Hazard to Life
10.5 Water Quality
10.6 Waste Management Implications
10.7 Ecological Impact
10.8 Landscape and visual
11.
IMPLEMENTATION SCHEDULE AND RECOMMENDED MITIGATION MEASURES
11.1 Introduction
12.1 Introduction
12.2 Summary of Environmental Outcomes
12.3 Summary of Environmental Impacts
12.4 Documentation of Public Concerns
List of Figures
Figure 2.2 Project Layout Plan
Figure 3.1 Locations of Representative Air
Quality Sensitive Receivers
Figure 4.1 Locations of Representative Noise
Sensitive Receivers
Figure 5.2 Societal Risk Guideline
Figure 5.3 Wind Rose of Peng Chau Weather
Station (2006-2015 Day)
Figure 5.4 Wind Rose of Peng Chau Weather
Station (2006-2015 Night)
Figure 5.5 Existing Lai Chi Yuen Cemetery
Figure 5.6 Location of the Project Site
Figure 5.7 Consultation Zone of SMBWTW (From PHI
Register)
Figure 5.9 Boundary of TPU 962
Figure 5.10 Representation of Consequence Results
Figure 5.11 Individual Risk Result
Figure 5.12 Societal Risk Result
Figure 6.1 Locations of Representative Water
Quality Sensitive Receivers
Figure 8.1 Site of Conservation Importance and
Transect Route
Figure 8.2 Habitats Map within Assessment Area
and Transect Route
Figure 9.1 Landscape Resources
Figure 9.2 Landscape Character Area
Figure 9.3 Visually Sensitive Receivers (VSRs)
Figure 9.4 Landscape and Visual Mitigation
Measures
Figure 9.6 Tree Compensation within the Existing
Cemetery Boundary
List of Appendices
Appendix 2.1 Alternative Options for the Extension of
the Existing Lai Chi Yuen Cemetery
Appendix 2.2 Construction Programme
Appendix 4.1 Measurement Results for Prevailing Daytime
Noise Levels
Appendix 4.2 Noise Criteria for Fixed Noise
Sources
Appendix 4.3 Photographs of Representative Noise
Sensitive Receivers
Appendix 4.4 EPD’s Agreement on Noise Assessment Points
Appendix 4.7 Calculation of Total Maximum Allowable
Sound Power Level of the Fixed Plants
Appendix 5.1 Population Considered in this Study
Appendix 5.2 Summary of Historical Incidents
Appendix 8.1 List of Flora Species Recorded and the
Relative Abundance within the Assessment Area
Appendix 8.2 List of Herpetofauna Species Recorded
within the Assessment Area
Appendix 8.6 List of Aquatic Fauna Recorded and the
Relative Abundance within the Assessment Area
Appendix 9.1 Photo Record of Views from the Subject
Site towards Potential VSRs along Lantau Trail
Appendix 12.2 Summary of Environmental Impacts
Appendix 13.1 Study Brief Checklist for the Project
List of Abbreviations
AECOM |
AECOM Asia
Company Limited |
AFCD |
Agriculture,
Fisheries and Conservation Department |
ALARP |
As Low As
Reasonably Practicable |
ANL |
Acceptable
Noise Levels |
APCO |
Air Pollution
Control Ordinance |
AQOs |
Air Quality Objectives |
ArchSD |
Architectural
Services Department |
ASRs |
Air Sensitive
Receivers |
ASRs |
Area
Sensitivity Ratings |
ATC |
Annual
Traffic Census |
BAT |
Best
Available Technology |
BC |
Barrier
Correction |
BM Model |
Britter and
McQuaid Model |
BMP |
Best Management
Practices |
BOD5 |
5-day
Biochemical Oxygen Demand |
C&D |
Construction
and Demolition |
C&DMMP |
Construction
and Demolition Material Management Plan |
C&SD |
Census and
Statistics Department |
CA |
Conservation
Area |
CBA |
Cost-Benefit
Analysis |
CBR |
Chemical, Biological and Radiological |
CEDD |
Civil
Engineering and Development Department |
CNP |
Construction
Noise Permit |
CO |
Carbon
Monoxide |
COD |
Chemical
Oxygen Demand |
CP |
Country Park |
CWTC |
Chemical
Waste Treatment Centre |
CZ |
Consultation
Zone |
DBH |
Diameter at
Breast Height |
DC |
Distance
Attenuation |
DP |
Designated
Project |
EcoIA |
Ecological
Impact Assessment |
EIA |
Environmental
Impact Assessment |
EIAO |
Environmental
Impact Assessment Ordinance |
EM&A |
Environmental
Monitoring and Audit |
EMP |
Environmental
Management Plan |
EPD |
Environmental
Protection Department |
F |
Frequency |
FC |
Façade
Correction |
FEHD |
Food and
Environmental Hygiene Department |
FSP |
Fine
Suspended Particulates |
GB |
Green Belt |
GLTM |
Greening,
Landscape and Tree Management |
GRG2 |
Generalized Reduced
Gradient |
GS |
General
Specification for Civil Engineering Works |
GW-TM |
Technical
Memorandum on Noise from Construction Work Other Than Percussive Piling |
HA |
Hazard to
Life Assessment |
HKPSG |
Hong Kong
Planning Standards and Guidelines |
HKRG |
Hong Kong
Government Risk Guidelines |
ICAF |
Implied Cost
of Averting a Fatality |
IND-TM |
Technical
Memorandum for the Assessment of Noise from Places Other Than Domestic
Premises, Public Places or Construction Sites |
IR |
Individual
Risk |
IUCN |
International
Union for Conservation of Nature and Natural Resources |
LCA |
Landscape
Character Area |
LD50 |
Median Lethal
Dose |
LR |
Landscape
Resources |
Max. SWLs |
Maximum
Permissible Sound Power Levels |
MHIDAS |
Major Hazard
Incident Data Service |
N |
Number of
fatalities |
NCO |
Noise Control
Ordinance |
NO2 |
Nitrogen
Dioxide |
NRMMs |
Non-road
Mobile Machinery |
NSRs |
Noise
Sensitive Receivers |
OVTs |
Old and
Valuable Trees |
OZPs |
Outline
Zoning Plans |
PATH |
Pollutants in
the Atmosphere and the Transport over Hong Kong |
PFAs |
Public
Filling Areas |
PFC |
Public Fill
Committee |
PFRF |
Public
Filling Reception Facilities |
PGC |
Potential
Global Concern |
PGLA |
Permanent
Government Land Allocation |
PHI |
Potentially
Hazardous Installation |
PlanD |
Planning
Department |
PLL |
Potential
Loss of Life |
PME |
Powered
Mechanical Equipment |
ProPECC PN |
Professional
Persons Environmental Consultative Committee Practice Notes |
Q(t) |
Release rates
|
QRA |
Quantitative
Risk Assessment |
RO |
Regional
Office |
RSP |
Respirable
Suspended Particulates |
SMBWTW |
Silvermine
Bay Water Treatment Works |
SO2 |
Sulphur
Dioxide |
SPLs |
Sound
Pressure Levels |
SSSIs |
Sites of
Special Scientific Interest |
SWLs |
Sound Power
Levels |
T |
Release
duration |
TD |
Transport
Department |
TIA |
Traffic
Impact Assessment |
TM |
Technical
Memorandum |
TM-DSS |
Technical Memorandum
on Standards for Effluents Discharged into Drainage and Sewerage Systems,
Inland and Coastal Waters |
TM-EIAO |
Technical
Memorandum on Environmental Impact Assessment Ordinance |
TPU |
Tertiary
Planning Unit |
TPZ |
Tree
Protection Zone |
TSP |
Total Suspended
Particulates |
UDM2 |
Universal
Dispersion Model 2 |
VSRs |
Visually
Sensitive Receivers |
WBTC |
Works Branch
Technical Circular |
WCZs |
Water Control
Zones |
WDO |
Waste
Disposal Ordinance |
WMP |
Waste
Management Plan |
WPCO |
Water
Pollution Control Ordinance |
WQOs |
Water Quality
Objectives |
WSRs |
Water
Sensitive Receivers |