Table of Contents

Page

 

1          INTRODUCTION.................................................................................................... 1-1

1.1       Background.................................................................................................... 1-1

1.2       Purpose of the EM&A Manual....................................................................... 1-1

1.3       Structure of the EM&A Manual..................................................................... 1-2

 

2          PROJECT DESCRIPTION.................................................................................... 2-1

2.1       Site Location.................................................................................................. 2-1

2.2       Design of the Project...................................................................................... 2-1

2.3       Development Programme............................................................................... 2-2

 

3          PROJECT ORGANISATION................................................................................ 3-1

3.1       Background.................................................................................................... 3-1

3.2       The Project Proponent.................................................................................... 3-1

3.3       The Engineer or Engineer’s Representative (ER).......................................... 3-1

3.4       Contractor....................................................................................................... 3-2

3.5       Environmental Team (ET)............................................................................. 3-2

3.6       Independent Environmental Checker (IEC)................................................... 3-3

 

4          AIR QUALITY......................................................................................................... 4-1

4.1       Introduction.................................................................................................... 4-1

4.2       Mitigation Measures....................................................................................... 4-1

4.3       Audit Requirements........................................................................................ 4-2

 

5          HAZARD TO LIFE................................................................................................. 5-1

5.1       Introduction.................................................................................................... 5-1

5.2       Mitigation Measures....................................................................................... 5-1

5.3       Audit Requirements........................................................................................ 5-1

 

6          NOISE....................................................................................................................... 6-1

6.1       Introduction.................................................................................................... 6-1

6.2       Mitigation Measures....................................................................................... 6-1

6.3       Audit Requirements........................................................................................ 6-2

 

7          WASTE MANAGEMENT...................................................................................... 7-1

7.1       Introduction.................................................................................................... 7-1

7.2       Mitigation Measures....................................................................................... 7-1

7.3       Audit Requirements........................................................................................ 7-4

 

8          VISUAL..................................................................................................................... 8-1

8.1       Introduction.................................................................................................... 8-1

8.2...... Mitigation Measures....................................................................................... 8-1

8.3...... Audit Requirements........................................................................................ 8-1

 

9          WATER QUALITY................................................................................................. 9-1

9.1       Introduction.................................................................................................... 9-1

9.2       Mitigation Measures....................................................................................... 9-1

9.3       Audit Requirement......................................................................................... 9-1

 

10        ENVIRONMENTAL AUDIT................................................................................ 10-1

10.1     Site Inspection.............................................................................................. 10-1

10.2     Environmental Complaints........................................................................... 10-2

            10.3.... Documentation............................................................................................. 10-2

 

11        REPORTING.......................................................................................................... 11-1

11.1     Introduction.................................................................................................. 11-1

11.2     Deliverables.................................................................................................. 11-1

 

FIGURES

Figure 1.1                 Project Location

Figure 2.1                 Locations of Air, Noise and Water Sensitive Receivers

Figure 10.1               Environmental Complaint Procedure Flow Chart

 

APPENDICES

Appendix A             Implementation Schedule for Environmental Mitigation Measures

Appendix B              Site inspection Proforma

Appendix C              Example of Complaint Log