TABLE
OF CONTENTS
Background
Scope of Report
Project Organization
Summary of Construction Works
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Equipment
Monitoring Parameter, Frequency and Schedule
Monitoring Locations
Monitoring Methodology
Results and Observations
1-hour TSP Monitoring
Monitoring Requirements
Monitoring Equipment
Monitoring Parameter, Frequency and Schedule
Monitoring Locations
Monitoring Procedures
Results and Observations
Monitoring Requirement
Monitoring Equipment
Monitoring Parameters, Frequency and Schedule
Monitoring Locations
Monitoring Methodology and Calibration Details
Results and Observations
Assessment of Environmental Monitoring Results
Audit Requirement
Audit Results
6. ENVIRONMENTAL
SITE INSPECTION AND AUDIT
Site Inspections
Review of Environmental Monitoring Procedures
Assessment of Environmental Monitoring Results
Advice on the Solid and Liquid Waste Management Status
Environmental Licences and Permits
Implementation Status of Environmental Mitigation Measures
Summary of Exceedances of the Environmental Quality Performance Limit
Summary of Complaints, Notifications of Summons and Successful
Prosecutions
Construction Programme for the Coming Months
Key Issues for Coming Month
Monitoring Schedule for the Coming Months
8. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
List
of Tables
Table 1.1 Contact Information of Key Personnel
Table 1.2 Construction Activities and the Corresponding
Environmental Mitigation Measures
Table 2.1 Air Quality Monitoring Equipment
Table 2.2 Frequency of Air Quality Monitoring
Table 2.3 Air Quality Monitoring Stations
Table 2.4 Summary of 1-hour TSP Impact Monitoring
Results
Table 2.5 Summary of 24-hour TSP Impact Monitoring
Results
Table 3.1 Noise Monitoring Equipment
Table 3.2 Frequency and Parameters of Noise
Monitoring
Table 3.3 Location of the Noise Monitoring Stations
Table 3.4 Summary of Impact Noise Levels during 07:00
– 19:00
Table 4.1 Water Quality Monitoring Equipment
Table 4.2 Water Quality Monitoring Parameters and
Frequency
Table 4.3 Limits of Detection for the In-situ and
Laboratory Measurements
Table 4.4 Marine Water Quality Monitoring Stations
Table 4.5 Summary of Total Number of Exceedances in
the Reporting Month
Table 4.6 Total Number of Water Quality Exceedances
in the Reporting Month and Previous Month
Table 5.1 Summary of Landscape and Visual
Observations, Recommendations, Corrective Actions and Outstanding Issues
Table 6.1 Waste Disposal in the Reporting Month
Table 6.2 Summary of Environmental Licensing and
Permit Status
Table 6.3 Corrective Actions by Contractor on Audit
Findings
Table 6.4 Summary of Environmental Complaints and
Prosecutions
List
of Figures
Figure 1.1 Project
Site Locations
Figure 2.1 Air
Quality and Noise Environmental Monitoring Stations (1 of 3)
Figure 2.2 Air
Quality and Noise Environmental Monitoring Stations (2 of 3)
Figure 2.3 Air
Quality and Noise Environmental Monitoring Stations (3 of 3)
Figure 4.1 Water
Quality Monitoring Stations
Figure 6.1 Complaint
Response Procedures
Appendices
Appendix A Project
Organization Chart
Appendix B Action
and Limit Levels for Air Quality, Noise and Water Quality
Appendix C Monitoring
Schedule for September 2006
Appendix D Calibration
Certificates
Appendix E Air
Quality Monitoring Results and Graphical Presentation
Appendix F Noise
Monitoring Results and Graphical Presentation
Appendix H Implementation
Schedule of Mitigation Measures
Appendix I Interim
Notification of Environmental Quality Limits Exceedance
Appendix K Construction
Programme
Appendix L Tentative
Schedules for October to December 2006
Appendix M Weather
Data for September 2006
Appendix N Marine
Water Quality Monitoring Results and Graphical Presentation
Graphical Presentation (DOSM, DOB, TUR & SS)
–monthly
Graphical Presentation (DOSM, DOB, TUR & SS) –Trends