TABLE OF CONTENTS

EXECUTIVE SUMMARY

Introduction

Environmental Monitoring Works

Complaints and Prosecutions

Future Key Issues

1.   INTRODUCTION

Background

Project Organizations

Construction Programme

Summary of EM&A Requirements

2.   AIR QUALITY

Monitoring Requirements

Monitoring Locations

Monitoring Equipments

Monitoring Parameters, Frequency and Duration

Monitoring Methodology and QA/QC Procedure

Results and Observations

3.   NOISE

Monitoring Requirements

Monitoring Locations

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Methodology and QA/QC Procedures

Maintenance and Calibration

Results and Observations

4.   ENVIRONMENTAL AUDIT

Site Audits

Review of Environmental Monitoring Procedures

Status of Environmental Licenses and Permits

Status of Waste Management

Implementation Status of Environmental Mitigation Measures

Implementation Status of Event Action Plans

Summary of Complaints and Prosecutions

5.   FUTURE KEY ISSUES

Key Issues for the Coming Month

Monitoring Schedule for the Next Month

Construction Program for the Next Month

6.   CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

LIST OF TABLES

 

Table I      Summary Table for Non-compliance Recorded in the Reporting Month

Table 1.1  Key Project Contacts

Table 2.1  Locations for Air Quality Monitoring

Table 2.2  Air Quality Monitoring Equipment

Table 2.3  Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.1  Noise Monitoring Stations

Table 3.2  Noise Monitoring Equipment

Table 3.3  Noise Monitoring Parameters, Frequency and Duration

Table 4.1  Summary of Environmental Licences and Permit Status

 

 

LIST OF FIGURES

 

Figure 1    Site Layout Plan

Figure 2a  Location of Monitoring Stations (I)

Figure 2b  Location of Monitoring Stations (II)

Figure 3    Project Organization Chart

 

 

LIST OF APPENDICES

 

A     Action and Limit Levels for Air Quality and Noise

B      Copies of Calibration Certificates

C     Environmental Monitoring Schedules

D     1-hour TSP Monitoring Results and Graphical Presentations

E      24-hour TSP Monitoring Results and Graphical Presentations

F      Wind Data

G     Noise Monitoring Results and Graphical Presentations

H     Summary of Exceedances

I       Site Audit Summary

J       Summary of Amount of Waste Generated

K     Environmental Mitigation Implementation Schedule (EMIS)

L      Event Action Plans

M     Construction Programme

N     Complaint Log

 

 

 

ABBREVIATION AND ACRONYM

 

 

AL Levels Action and Limit Levels

CEDD      Civil Engineering & Development Department

E / ER      Engineer/Engineer’s Representative

EIA          Environmental Impact Assessment

EM&A     Environmental Monitoring and Audit

EMIS       Environmental Mitigation Implementation Schedule

EP            Environmental Permit

EPD         Environmental Protection Department

ET            Environmental Team

HVS        High Volume Sampler

IEC          Independent Environmental Checker

RE           Resident Engineer

RH           Relative Humidity

TSP         Total Suspended Particulates

QA/QC    Quality Assurance / Quality Control

SLM        Sound Level Meter

WMP       Waste Management Plan