Quotation Ref No. Hy(S)Q/026/2006

Widening of Tuen Mun Road at Tsing Tin Interchange

Environmental Impact Assessment

 

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

 

 

 

 

Table of Contents

 

 

1          INTRODUCTION

1.1...... Project Background

1.2...... Objectives and Scope of the EIA Study

1.3...... Assessment Area

1.4...... Structure of Report

2          PROJECT DESCRIPTION

2.1...... Site Location and Scope of the Project

2.2...... Need of the Project

2.3...... Consideration of Different Alignment Options and Built-forms

2.4...... Consideration of Alternative Construction Methods

2.5...... Selection of Preferred Option

2.6...... Works Programme

2.7...... Concurrent Projects

3          AIR QUALITY

3.1...... Introduction

3.2...... Environmental Legislation, Policies, Plans, Standards and Criteria

3.3...... Description of the Environment

3.4...... Air Quality Sensitive Receivers

3.5...... Identification, Prediction and Evaluation of Environmental Impacts

3.6...... Assessment Methodology

3.7...... Prediction and Evaluation of Environmental Impacts

3.8...... Mitigation of Adverse Environmental Impacts

3.9...... Evaluation of Residual Impacts

3.10.... Environmental Monitoring and Audit

3.11.... Conclusion

4          NOISE

4.1...... Introduction

4.2...... Environmental Legislation, Policies, Plans, Standards and Criteria

4.3...... Description of the Environment

4.4...... Noise Sensitive Receivers

4.5...... Assessment Methodology

4.6...... Identification of Environmental Impacts

4.7...... Prediction and Evaluation of Environmental Impacts

4.8...... Mitigation of Adverse Environmental Impacts

4.9...... Evaluation of Residual Environmental Impacts

4.10.... Environmental Monitoring and Audit

4.11.... Summary

5.         WATER QUALITY

5.1...... Introduction

5.2...... Environmental Legislation, Policies, Plans, Standards and Criteria

5.3...... Description of the Environment

5.4...... Sensitive Receivers

5.5...... Assessment Methodology

5.6...... Identification and Evaluation of Environmental Impact

5.7...... Mitigation of Adverse Environmental Impacts

5.8...... Residual Environmental Impact

5.9...... Environmental Monitoring and Audit

5.10.... Conclusion

6          WASTE MANAGEMENT

6.1...... Introduction

6.2...... Environmental Legislation, Policies, Plans and Standards

6.3...... Assessment Methodology

6.4...... Identification of Potential Sources of Impact

6.5...... Prediction and Evaluation of Environmental Impacts

6.6...... Mitigation Measures

6.7...... Evaluation of Residual Impacts

6.8...... Environmental Audit

6.9...... Conclusion

7          LAND CONTAMINATION

7.1...... Introduction

7.2...... Environmental Legislation, Policies, Plans, Standards and Criteria

7.3...... Assessment methodology

7.4...... Description of the Environment

7.5...... Site Inspection

7.6...... Prediction and Evaluation of Environmental Impacts

8          HAZARD TO LIFE

8.1...... Introduction

8.2...... Study Approach

8.3...... Background Study Information

8.4...... Hazard Identification

8.5...... Frequency Assessment

8.6...... Consequence Assessment

8.7...... Risk Assessment

8.8...... Identification and Analysis of Mitigation Measures

8.9...... Recommended Measures

8.10.... Conclusion

9.         ECOLOGICAL IMPACT

9.1...... Introduction

9.2...... Environmental Legislation, Standards and Guidelines

9.3...... Assessment Methodology

9.4...... Ecological Value

9.5...... Identification, Prediction and Evaluation of Environmental Impact

9.6...... Cumulative Impacts

9.7...... Mitigation of Adverse Environmental Impacts

9.8...... Evaluation of Residual Impacts

9.9...... Environmental Monitoring and Audit

9.10.... Conclusion

9.11.... References

10.       LANDSCAPE AND VISUAL IMPACT ACCESSMENT

10.1.... Introduction

10.2.... Environmental Legislation, Standards and Guidelines

10.3.... Assessment Methodology

10.4.... Scope and Content of the Study

10.5.... Review of Planning and Development Control Framework

10.6.... Baseline Study

10.7.... Landscape Impact Assessment

10.8.... Visual Impact Assessment

10.9.... Conclusion

11        CULTURAL HERITAGE

11.1.... Introduction

11.2.... Environmental Legislation, Policies, Plans, Standards and Criteria

11.3.... Description of the Environment

11.4.... Identification, Prediction and Evaluation of Environmental Impacts

11.5.... Environmental Monitoring and Audit

11.6.... Conclusion

12        ENVIRONMENTAL MONITORING AND AUDIT

12.1.... Introduction

12.2.... Air Quality

12.3.... Noise

12.4.... Water Quality

12.5.... Waste Management

12.6.... Land Contamination

12.7.... Ecology

12.8.... Hazard to Life

12.9.... Landscape and Visual

12.10.. Cultural Heritage

13        CONCLUSION

13.1.... Introduction

13.2.... Environmental Outcomes

13.3.... Air Quality Impact

13.4.... Noise Impact

13.5.... Water Quality Impacts

13.6.... Waste Management Implications

13.7.... Land Contamination Impact

13.8.... Hazard to Life

13.9.... Ecological Impact

13.10.. Landscape and Visual Impact

13.11.. Cultural Heritage Impact

13.12.. Environmental Monitoring and Audit

13.13.. Overall Conclusion

14.       IMPLEMENTATION SCHEDULE OF THE PROPOSED MITIGATION MEASURES

 

 

List of Tables

 

Table 2.1          Unmitigated Landscape Impacts of Different Alignment Options on Landscape Resources and Landscape Character Areas

Table 3.1......... Hong Kong Air Quality Objectives

Table 3.2......... Annual Average Concentrations of Pollutants in the Latest Five Years (Year 2002 - 2006) at Yuen Long Air Quality Monitoring Station

Table 3.3......... Details of Representative Air Sensitive Receivers

Table 3.4......... Vehicle Classes in EMFAC-HK Model

Table 3.5......... Emission Factors for Year 2009 for Different Vehicle Classes (EMFAC-HK)

Table 3.6......... Predicted Maximum 1-hour Average NO2, 24-hour Average NO2 and RSP Concentrations the Representative Air Sensitive Receivers

Table 4.1......... Construction Noise Criteria for Activity other than Percussive Piling

Table 4.2......... Acceptable Noise Levels for Percussive Piling

Table 4.3......... Permitted Hours of Operation for Percussive Piling

Table 4.4......... Summary of Representative Noise Assessment Point

Table 4.5......... Summary of Unmitigated Construction Noise Levels at Representative NSRs During Normal Daytime Working Hours

Table 4.6......... Summary of Mitigated Construction Noise Levels at Representative NSRs During Normal Daytime Working Hours

Table 5.1......... Water Quality Objectives Statement for North Western WCZ

Table 5.2......... Water Quality in Tuen Mun River in 2006

Table 6.1......... Summary of Estimated Quantities of C&D Material and Disposal Routes

Table 7.1......... Reviewed Historical Aerial Photographs

Table 8.1......... Population and Traffic Data Sources

Table 8.2......... Estimation of Future Population

Table 8.3......... Summary of Chlorine Incidents of Water Treatment Plant from MHIDAS

Table 8.4......... Estimation of Served Population per Plant

Table 8.5......... Estimation of Total WTP in Europe and USA

Table 8.6......... Comparison of Event Frequencies

Table 8.7......... External Event Frequencies

Table 8.8......... Summary of Source Term Modelling Results

Table 8.9......... Effective Outdoors Probability of Fatality

Table 8.10....... Wind Tunnel Simulations for Tuen Mun WTW

Table 8.11....... Scaling Factors for Release Events

Table 8.12....... Candidate Risk Mitigation Measures

Table 8.13....... Assumptions of Mitigation Measures for CBA

Table 8.14....... Results of CBA

Table 9.1......... Area of Various Habitat Types within the Assessment Area

Table 9.2a....... Ecological Value of Woodland and Village in the Assessment Area

Table 9.2b....... Ecological Value of Developed Area and Watercourse in the Assessment Area

Table 9.3 ....... Evaluation of Faunal Species of Conservation Interest Recorded Within Assessment Area

Table 9.4a....... Overall Impact Evaluation of Woodland and Village

Table 9.4b....... Overall Impact Evaluation of Developed Area and Watercourse

Table 10.1 ..... Relationship between Receptor Sensitivity and Impact Magnitude in Defining Impact Significance

Table 10.2....... List of the Landscape Resources / Landscape Character Areas and Their Sensitivity to Change

Table 10.3....... Visual Sensitive Receivers (VSRs) and Their Sensitivity to Change

Table 10.4....... Visual Sensitive Receivers (VSRs) and Their Manitude of Impacts

Table 10.5....... Significant Landscape Impacts of the Proposed Works during Construction Phase

Table 10.6....... Proposed Construction Phase Landscape and Visual Mitigation Measures

Table 10.7....... Proposed Operation Phase Landscape and Visual Mitigation Measures

Table 10.8....... Significance of Landscape Impacts in the Construction and Operation Phases

Table 10.9....... Significance of Visual Impacts in the Construction and Operation Phases (Note: All impacts adverse unless otherwise noted.) 10-2

Table 13.1....... Summary of Key Environmental Outcomes/ Benefits

Table 14.1....... Implementation Schedule for Air Quality Control

Table 14.2....... Implementation Schedule for Noise Control

Table 14.3....... Implementation Schedule for Water Quality Control

Table 14.4....... Implementation Schedule for Waste Management

Table 14.5....... Implementation Schedule for Hazard to Life

Table 14.6....... Implementation Schedule for Ecology

Table 14.7....... Implementation Schedule for Landscape and Visual - Construction

 

List of Figures

 

Figure 1.1         Site Plan

Figure 2.1         Layout Plan

Figure 2.2         Location of Concurrent Project within 500m Study Area

Figure 3.1         Locations of Representative Air Sensitive Receivers

Figure 3.2         Contours of Cumulative Maximum 1-Hour Average NO2 Concentration in mg/m3 at 1.5m above ground

Figure 3.3         Contours of Cumulative Maximum 24-Hour Average NO2 Concentration in mg/m3 at 1.5m above ground

Figure 3.4         Contours of Cumulative Maximum 24-Hour Average RSP Concentration in mg/m3 at 1.5m above ground

Figure 4.1         Locations of Representative Noise Sensitive Receivers

Figure 4.2         Locations of Proposed Noise Mitigation Measures

Figure 5.1         Locations of River Water Quality Monitoring Stations in Tuen Mun River (TN4 & TN5)

Figure 8.1         Location of Tuen Mun Water Treatment Works and Project Site Boundary

Figure 8.2         Hong Kong EIAO Societal Risk FN Curve

Figure 8.3         Individual Risk Contours Comparison (Model Validation)

Figure 8.4         FN Curves Comparison (Model Validation)

Figure 8.5         Individual Risk Contours

Figure 8.6         FN Curves for TMWTW (Construction Stage – Year 2009)

Figure 8.7         FN Curves for TMWTW (Operation Stage – Year 2024)

Figure 9.1         Habitat Map

Figure 10.1.1    Existing Aerial Photo

Figure 10.2.1    Planning & Development Framework (OZP)

Figure 10.3.1    Landscape Resource

Figure 10.3.2    Photo of Landscape Resources

Figure 10.4.1    Landscape Character Area

Figure 10.5.1    Key VSRs and Zone of Visual Influence

Figure 10.5.2    Photos of VSRs

Figure 10.5.3    Photos of VSRs

Figure 10.5.4    Photos of VSRs

Figure 10.5.5    Views of VSRs

Figure 10.5.6    Views of VSRs

Figure 10.7.1    Landscape and Visual Mitigation Measures

Figure 10.7.2    Landscape and Visual Mitigation Measures

Figure 10.7.3    Compensatory Planting Plan (Within San Hui Park)

Figure 10.7.4    Compensatory Planting Plan (Outside San Hui Park)

Figure 10.8.1    View 1 Photomontage in VSR R1

Figure 10.8.2    View 2 Photomontage in VSR R7

 

 

List of Appendices

 

Appendix 2.1   Drawing For Alternative Options

Appendix 3.1   Year 2024 Traffic Flow Forecast

Appendix 3.2   Classification of Road Type

Appendix 3.3   The adjusted exhaust technology fractions

Appendix 3.4   2009 Vehicle Population

Appendix 3.5   Adopted Daily Trips and Vehicle-Mile-Traveled (VMT) in Year 2024

Appendix 3.6   Summary Results of Comparing the Total Emission by Using Peak Hour Flow Speed and Design Road Speed

Appendix 3.7   Summary Results of Comparing the Total Emission from Year 2009 to 2024

Appendix 3.8   The Calculation of Maximum Fleet Vehicle Emission

Appendix 3.9   Calculations of Emission Rates from Open Road Sections Using EMFAC-HK Fleet Average Emission Factor

Appendix 4.1   Locations of “New” Road

Appendix 4.2   Correspondence Letter from EPD on the Agreement on Noise Assessment Points

Appendix 4.3   Photos of Representative Noise Assessment Point

Appendix 4.4   Construction Noise Impact Assessment

Appendix 4.5   Year 2024 Traffic Forecast

Appendix 4.6   Traffic Noise Impact Assessment

Appendix 7.1   Photo-documentation of Site Inspection

Appendix 8.1   Population Forecast

Appendix 8.2   Historical Incidents from MHIDAS database

Appendix 9.1   Representative Photographs of Habitats Recorded in the Assessment Area

Appendix 9.2   Photograph of Species of Conservation Interest Recorded from the Assessment Area

Appendix 10.1 Tree Assessment Schedule