1.1 Project Background
1.2 Construction Programme
1.3 Purpose of The Manual
1.4 Contents
2.1 Key Parties and Organisation
Chart
2.2 Drainage Services
Department
2.3 Environmental Protection
Department
2.4 Engineer’s
Representative
2.5 Independent
Environmental Checker
2.6 Environmental Team
2.7 The Contractor
3.1 Introduction
3.2 EM&A Requirements
during Construction Phase
4.1 Introduction
4.2 Monitoring Requirements
and Equipment
4.3 Noise Monitoring
Methodology
4.4 Noise Monitoring
Locations
4.5 Baseline Noise Monitoring
4.6 Impact Noise Monitoring
4.7 Event and Action Plan
4.8 Mitigation Measures
5.1 Introduction
5.2 EM&A Requirements
during Construction Phase
5.3 EM&A Requirements during
Operational Phase
5.4 Implementation Schedule
6.1 Introduction
6.2 Water Quality Parameters
6.3 Monitoring Equipment
6.4 Measurement and
Laboratory Analysis
6.5 Monitoring Locations
6.6 Baseline Water Quality
Monitoring
6.7 Impact Water Quality
Monitoring
6.8 Event and Action Plan
7.1 Introduction
7.2 EM&A Requirements
During Construction Phase
8.1 Introduction
8.2 EM&A Requirements
during Construction Phase
9. LANDSCAPE AND VISUAL IMPACT
ASSESSMENT
9.1 Introduction
9.2 Methodology and Criteria
9.3 Baseline Monitoring
9.4 Event and Action Plan
9.5 Mitigation Measures
10.1 Introduction
10.2 Construction Phase
Protective Measures
10.3 Operation Phase
Protective Measures
10.4 Construction Phase
EM&A Requirements
10.5 Operation Phase EM&A
Requirements
10.6 Implementation Schedule
11.1 Site Inspection
Requirements
11.2 Compliance with Legal and
Contractual Requirements
11.3 Environmental Complaints
12.1 Baseline Monitoring
Report
12.2 Monthly EM&A Reports
12.3 Final EM&A Summary
Report
12.4 Data Keeping
12.5 Interim Notifications of Environmental Quality Limit
Exceedances
List of Tables
Table
4.1 Noise Monitoring
Locations
Table
4.2 Action and Limit Levels
for Construction Noise
Table
4.3 Event / Action Plan for Construction Noise
Table 9.1 Monitoring Programme
Table 9.2 Event and Action Plan for
Landscape and Visual Impact
Table 10.1 Mitigation Recommendations for
Impacted Graded Historic Buildings
Table 10.2 Audit Requirements and Frequency
List of Appendices
Appendix
1 Implementation Schedule of
Recommended Mitigation Measures
Appendix
2 Sample Data Record Sheet for
Noise Measurement
Appendix
3 Flow Chart of Complaint
Response Procedures
Appendix
4 Sample Template for Interim
Notifications
List of Figures
Figure
1.2 Proposed Drainage Works at Sung Shan New Village
Figure
1.3 Proposed Drainage Works at
Tai Wo
Figure
1.4A Proposed Drainage Works at Lin
Fa Tei (Sheet 1 of 2)
Figure
1.4B Proposed Drainage Works at Lin
Fa Tei (Sheet 2 of 2)
Figure
1.5A Proposed Drainage Works at Ha
Che (Sheet 1 of 2)
Figure
1.5B Proposed Drainage Works at Ha
Che (Sheet 2 of 2)
Figure
3.1 Air Quality Impact Assessment
– Key Plan
Figure
3.2 Location of Representative
Air Sensitive Receivers at Sung Shan New Village
Figure
3.3 Location of Representative
Air Sensitive Receivers at Tai Wo
Figure
3.4A Location of Representative Air
Sensitive Receivers at Lin Fa Tei (Sheet 1 of 2)
Figure
3.4B Location of Representative Air
Sensitive Receivers at Lin Fa Tei (Sheet 2 of 2)
Figure
3.5A Location of Representative Air
Sensitive Receivers at Ha Che (Sheet 1 of 2)
Figure
3.5B Location of Representative Air
Sensitive Receivers at Ha Che (Sheet 2 of 2)
Figure
4.1 Noise Impact Assessment – Key
Plan
Figure
4.2 Location of Representative
Noise Sensitive Receivers at Sung Shan New Village
Figure
4.3 Location of Representative
Noise Sensitive Receivers at Tai Wo
Figure
4.4 Location of Representative Noise
Sensitive Receivers at Lin Fei Tei
Figure
4.5 Location of Representative
Noise Sensitive Receivers at Ha Che
Figure
4.6 Location of Noise
Monitoring Station at Sung Shan New Village
Figure
4.7 Location of Noise
Monitoring Station at Tai Wo
Figure
4.8 Location of Noise
Monitoring Station at Lin Fa Tei
Figure
4.9 Location of Noise
Monitoring Station at Ha Che
Figure
6.1 Water Sensitive Receivers
at Sung Shan New Village
Figure
6.2 Water Sensitive Receivers
at Tai Wo
Figure
6.3 Water Sensitive Receivers
at Lin Fa Tei
Figure
6.4 Water Sensitive Receivers
at Ha Che
Figure
6.5 Water Quality Monitoring
Location at Sung Shan New Village
Figure
6.6 Water Quality Monitoring
Location at Tai Wo
Figure
6.7 Water Quality Monitoring
Location at Lin Fa Tei
Figure
6.8 Water Quality Monitoring
Location at Ha Che
Figure
10.1 Graded Historic buildings
within Lin Fa Tei Area
Figure
10.2 Graded Historic buildings
within Ha Che Area
Figure
10.3 Graded Historic buildings
within Tai Wo Area