TABLE OF CONTENTS

1.           INTRODUCTION

1.1         Project Background

1.2         Construction Programme

1.3         Purpose of The Manual

1.4         Contents

2.           PROJECT ORGANISATION

2.1         Key Parties and Organisation Chart

2.2         Drainage Services Department

2.3         Environmental Protection Department

2.4         Engineer’s Representative

2.5         Independent Environmental Checker

2.6         Environmental Team

2.7         The Contractor

3.           AIR QUALITY

3.1         Introduction

3.2         EM&A Requirements during Construction Phase

4.           NOISE

4.1         Introduction

4.2         Monitoring Requirements and Equipment

4.3         Noise Monitoring Methodology

4.4         Noise Monitoring Locations

4.5         Baseline Noise Monitoring

4.6         Impact Noise Monitoring

4.7         Event and Action Plan

4.8         Mitigation Measures

5.           ECOLOGY

5.1         Introduction

5.2         EM&A Requirements during Construction Phase

5.3         EM&A Requirements during Operational Phase

5.4         Implementation Schedule

6.           WATER QUALITY

6.1         Introduction

6.2         Water Quality Parameters

6.3         Monitoring Equipment

6.4         Measurement and Laboratory Analysis

6.5         Monitoring Locations

6.6         Baseline Water Quality Monitoring

6.7         Impact Water Quality Monitoring

6.8         Event and Action Plan

7.           WASTE MANAGEMENT

7.1         Introduction

7.2         EM&A Requirements During Construction Phase

8.           LAND CONTAMINATION

8.1         Introduction

8.2         EM&A Requirements during Construction Phase

9.           LANDSCAPE AND VISUAL IMPACT ASSESSMENT

9.1         Introduction

9.2         Methodology and Criteria

9.3         Baseline Monitoring

9.4         Event and Action Plan

9.5         Mitigation Measures

10.         CULTURAL HERITAGE

10.1       Introduction

10.2       Construction Phase Protective Measures

10.3       Operation Phase Protective Measures

10.4       Construction Phase EM&A Requirements

10.5       Operation Phase EM&A Requirements

10.6       Implementation Schedule

11.         SITE ENVIRONMENTAL AUDIT

11.1       Site Inspection Requirements

11.2       Compliance with Legal and Contractual Requirements

11.3       Environmental Complaints

12.         REPORTING

12.1       Baseline Monitoring Report

12.2       Monthly EM&A Reports

12.3       Final EM&A Summary Report

12.4       Data Keeping

12.5       Interim Notifications of Environmental Quality Limit Exceedances

 

List of Tables

Table 4.1              Noise Monitoring Locations

Table 4.2              Action and Limit Levels for Construction Noise

Table 4.3              Event / Action Plan for Construction Noise

Table 9.1              Monitoring Programme

Table 9.2              Event and Action Plan for Landscape and Visual Impact

Table 10.1            Mitigation Recommendations for Impacted Graded Historic Buildings

Table 10.2            Audit Requirements and Frequency

 

List of Appendices

Appendix 1           Implementation Schedule of Recommended Mitigation Measures

Appendix 2           Sample Data Record Sheet for Noise Measurement

Appendix 3           Flow Chart of Complaint Response Procedures

Appendix 4           Sample Template for Interim Notifications

 

List of Figures

Figure 1.1          Site Location Plan

Figure 1.2          Proposed Drainage Works at Sung Shan New Village

Figure 1.3          Proposed Drainage Works at Tai Wo

Figure 1.4A        Proposed Drainage Works at Lin Fa Tei (Sheet 1 of 2)

Figure 1.4B        Proposed Drainage Works at Lin Fa Tei (Sheet 2 of 2)

Figure 1.5A        Proposed Drainage Works at Ha Che (Sheet 1 of 2)

Figure 1.5B        Proposed Drainage Works at Ha Che (Sheet 2 of 2)

Figure 3.1          Air Quality Impact Assessment – Key Plan

Figure 3.2          Location of Representative Air Sensitive Receivers at Sung Shan New Village

Figure 3.3          Location of Representative Air Sensitive Receivers at Tai Wo

Figure 3.4A        Location of Representative Air Sensitive Receivers at Lin Fa Tei (Sheet 1 of 2)

Figure 3.4B        Location of Representative Air Sensitive Receivers at Lin Fa Tei (Sheet 2 of 2)

Figure 3.5A        Location of Representative Air Sensitive Receivers at Ha Che (Sheet 1 of 2)

Figure 3.5B        Location of Representative Air Sensitive Receivers at Ha Che (Sheet 2 of 2)

Figure 4.1          Noise Impact Assessment – Key Plan

Figure 4.2          Location of Representative Noise Sensitive Receivers at Sung Shan New Village

Figure 4.3            Location of Representative Noise Sensitive Receivers at Tai Wo

Figure 4.4            Location of Representative Noise Sensitive Receivers at Lin Fei Tei

Figure 4.5            Location of Representative Noise Sensitive Receivers at Ha Che

Figure 4.6            Location of Noise Monitoring Station at Sung Shan New Village

Figure 4.7            Location of Noise Monitoring Station at Tai Wo

Figure 4.8            Location of Noise Monitoring Station at Lin Fa Tei

Figure 4.9            Location of Noise Monitoring Station at Ha Che

Figure 6.1            Water Sensitive Receivers at Sung Shan New Village

Figure 6.2            Water Sensitive Receivers at Tai Wo

Figure 6.3            Water Sensitive Receivers at Lin Fa Tei

Figure 6.4            Water Sensitive Receivers at Ha Che

Figure 6.5            Water Quality Monitoring Location at Sung Shan New Village

Figure 6.6            Water Quality Monitoring Location at Tai Wo

Figure 6.7            Water Quality Monitoring Location at Lin Fa Tei

Figure 6.8            Water Quality Monitoring Location at Ha Che

Figure 10.1          Graded Historic buildings within Lin Fa Tei Area

Figure 10.2          Graded Historic buildings within Ha Che Area

Figure 10.3          Graded Historic buildings within Tai Wo Area