TABLE OF CONTENTS
4.2 Environmental
Legislation, Standards and Guidelines
4.3 Description
of Existing Environment
4.4 Identification
of Representative Noise Sensitive Receivers
4.5 Identification
of Environmental Impacts
4.7 Prediction
and Evaluation of Environmental Impacts
4.8 Mitigation
of Adverse Environmental Impacts
4.9 Evaluation
of Residual Impacts
4.10 Environmental
Monitoring and Audit
4.11 Environmental
Acceptability of Schedule 2 Designated Projects.
List of Tables
Table 4.1 Noise Standards for Daytime Construction Activities
Table 4.2 Area Sensitivity Rating
Table 4.3 Acceptable Noise Level Listed in IND-TM
Table 4.4 Fixed
Noise Criteria
Table 4.5 Ground-borne Rail Noise Criteria
Table 4.6 Noise Standards for Road Traffic Noise
Table 4.7 Summary of Prevailing Background Noise Measurement for
Establishing Fixed Noise Criteria
Table 4.8 Marine Traffic Noise Criteria
Table 4.9 Identified Noise Sensitive Receivers
Table 4.10 Representative Noise Assessment Points for Construction Noise
Table 4.11 Representative Noise Assessment Points for Fixed Noise
Table 4.12 Representative Noise Assessment Points for Rail Noise
Table 4.13 Representative Noise Assessment Points for Road Traffic Noise
Table 4.14 Representative Noise Assessment Points for Marine Traffic
Noise
Table 4.15 Identified Fixed Noise Sources
Table 4.16 Tentative Years of Population Intake / Operation for the
Proposed Sites
Table 4.17 Fixed Noise Criteria for Proposed Fixed Noise Sources
Table 4.19 Predicted Road Traffic Noise Level at TKO 137 under
Unmitigated Scenario (Year 2041)
Table 4.20 Predicted Marine Traffic Noise Levels
Table 4.21 Quieter Construction Method / Equipment
Table 4.25 Optimised Mitigation Measures for Road Traffic Noise Impact
List of Figures
Figure 4.1.1 Noise Assessment Area and
Locations of NSRs for Construction Noise at TKO 132
Figure 4.1.2 Noise Assessment Area and Locations of NSRs for Road Traffic and Fixed Noise at TKO 132
Figure 4.1.3 Noise Assessment Area and Locations of NSRs
for Construction, Road Traffic, Fixed and Rail Noise at TKO
137
Figure 4.1.4 Noise Assessment Area and Locations of NSRs for Marine Traffic Noise at TKO 132 and TKO 137
Figure 4.2 Locations of Noise Measurement Points for Fixed Noise Source
and Marine Traffic Noise Assessment
Figure 4.3.1 Locations of NAPs for Construction Noise at TKO 132
Figure 4.3.2 Locations of NAPs for Construction Noise at TKO 137
Figure 4.4.1 Locations of NAPs for Fixed Noise at TKO 132
Figure 4.4.2 Locations of NAPs for Fixed Noise at TKO 137
Figure 4.5 Locations of NAPs for Rail Noise at TKO 137
Figure 4.6.1 Locations of NAPs for Road Traffic Noise at TKO 132
Figure 4.6.2 Locations of NAPs for Road Traffic Noise at TKO 137
Figure 4.7 Locations of NAPs for Marine Traffic Noise at TKO 132 and TKO
137
Figure 4.8.1 Project
Road Extent at TKO 132
Figure 4.8.2 Project
Road Extent at TKO 137
Figure 4.9 Optimised
Road Traffic Noise Mitigation Measures at TKO 137
List of Appendices
Appendix 4.1 Prevailing Background Noise Measurement Data
Appendix 4.2 Photographic Records of the Existing Representative Noise
Sensitive Receivers
Appendix 4.3 Tentative Construction Programme
Appendix 4.4 Tentative Construction Plant Inventory
Appendix 4.5 Marine Traffic Data with endorsement letter from Marine
Department
Appendix 4.6 Road Traffic Forecast Data
Appendix 4.7 Endorsement of the Traffic Forecast Data from Transport
Department
Appendix 4.8 Computation Plot of Road Traffic Noise Model
Appendix 4.9 Fixed Plant Inventory
Appendix 4.10 Predicted Road Traffic Noise Level at TKO 132
Appendix 4.11 Predicted Road Traffic Noise Level at TKO 137
Appendix 4.12 Marine Traffic Noise Impact Assessment
Table 4.1 Noise
Standards for Daytime Construction Activities
Uses |
0700 to 1900 Hours
on Any Day Not Being a Sunday or General Holiday, Leq (30
min) dB(A) |
·
All domestic premises, ·
Temporary housing
accommodation, ·
Hostels ·
Convalescent homes, and ·
Homes for the aged |
75 |
·
Places of public worship, ·
Courts of law, and ·
Hospitals and medical
clinics |
70 |
·
Educational institutions |
70 65 (during examinations) |
Notes: ·
The above standards apply
to uses which rely on opened windows for ventilation and are assessed at 1m
from the external façade. |
Table 4.2 Area
Sensitivity Rating
Type of Area Containing NSR |
Degree to
which NSR is affected by Influencing Factor |
||
Not Affected |
Indirectly
Affected |
Directly
Affected |
|
(i)
Rural area,
including country parks or village type developments |
A |
B |
B |
(ii)
Low density residential
area consisting of low-rise or isolated high-rise developments |
A |
B |
C |
(iii)
Urban area |
B |
C |
C |
(iv)
Area other
than those above |
B |
B |
C |
Notes: ·
“Country park”
means an area that is designated as a country park pursuant to section 14 of
the Country Parks Ordinance; ·
“Directly
affected" means that the NSR is at such a location that noise generated
by the IF is readily noticeable at the NSR and is a dominant feature of the
noise climate of the NSR; ·
"Indirectly
affected" means that the NSR is at such a location that noise generated
by the IF, whilst noticeable at the NSR, is not a dominant feature of the
noise climate of the NSR; ·
"Not
affected" means that the NSR is at such a location that noise generated
by the IF is not noticeable at the NSR; and ·
"Urban
area" means an area of high density, diverse development including a
mixture of such elements as industrial activities, major trade or commercial
activities and residential premises. |
Table 4.3 Acceptable
Noise Level Listed in IND-TM
Time Period |
Acceptable
Noise Level (ANL) for |
||
ASR A |
ASR B |
ASR C |
|
Day (0700 to 1900 hrs) |
60 |
65 |
70 |
Evening (1900 to 2300 hrs) |
60 |
65 |
70 |
Night (2300 to 0700 hrs) |
50 |
55 |
60 |
Notes: ·
The above standards apply to uses which rely on opened
windows for ventilation and are assessed at 1m from the external façade. ·
Table 4.2 should be referenced for the Area Sensitivity
Rating (ASR). |
Table 4.4 Fixed
Noise Criteria
Time Period |
Fixed Noise
Criteria for Different Area Sensitivity Rating Leq 30min,
dB(A) |
|||||
Cumulative Fixed
Noise Source Impact Criteria |
ANL- 5 for
Establishing Criteria for Planned Fixed Noise Sources |
|||||
ASR A |
ASR B |
ASR C |
ASR A |
ASR B |
ASR C |
|
Day (0700 to 1900 hrs) |
60 |
65 |
70 |
55 |
60 |
65 |
Evening (1900 to 2300 hrs) |
60 |
65 |
70 |
55 |
60 |
65 |
Night (2300 to 0700 hrs) |
50 |
55 |
60 |
45 |
50 |
55 |
Notes: ·
The above standards apply to uses which rely on
opened windows for ventilation and are assessed at 1m from the external
façade. ·
Table 4.2 should be referenced for the Area Sensitivity
Rating (ASR). ·
Criteria for planned fixed noise sources would be
the lower of ANL-5 dB(A) and the measured prevailing background noise level
(L90 (60-min)) presented in Table 4.7. The criteria
for planned fixed noise sources is summarised in Table 4.17. |
Table 4.5 Ground-borne
Rail Noise Criteria
Time Period |
Ground-borne
Rail Noise Criteria for |
||
ASR A |
ASR B |
ASR C |
|
Day (0700 to 1900 hrs) |
50 |
55 |
60 |
Evening (1900 to 2300 hrs) |
50 |
55 |
60 |
Night (2300 to 0700 hrs) |
40 |
45 |
50 |
Notes: ·
The above standards apply to uses which rely on
opened windows for ventilation and are assessed at 1m from the external
façade. ·
Table 4.2 should be referenced for the Area Sensitivity
Rating (ASR). |
Table 4.6 Noise
Standards for Road Traffic Noise
Uses |
Peak
Hour Traffic Noise Level, L10
(1 hr) dB(A) |
·
All domestic premises ·
Temporary housing
accommodation ·
Hostels ·
Convalescent homes, and ·
Homes for the aged |
70 |
·
Educational institutions
(including kindergartens and nurseries) ·
Places of public worship,
and ·
Courts of law |
65 |
·
Hospitals and medical
clinics |
55 |
Notes: ·
The above standards, or
equivalent, apply to uses which rely on opened windows for ventilation and
are assessed at 1m from the external façade. |
Table 4.7 Summary
of Prevailing Background Noise Measurement for Establishing Fixed Noise Criteria
Average Prevailing Background Noise Level (Day /
Evening / Night), L90 (60-min) dB(A) |
Represented NSR |
||
ID |
Description |
||
MPT |
Ma Pui Tsuen |
56 / 52 / 51 |
E-MPT |
OLV |
On Luen
Village |
50 / 51 / 50 |
E-OLV |
HFC |
Heng Fa Chuen |
56 / 54 / 53 |
P-PR1 to P-PR5 in TKO 137 |
OS |
Ocean Shores |
52 / 51 / 48 |
E-OS |
YMS |
Yan Wing
Street, Yau Tong |
66 / 58 / 53 |
P-PR1 to P-PR5 P-PU6 and in TKO 137 |
Table 4.8 Marine Traffic Noise Criteria
NSR ID |
Prevailing Noise Level during |
Measurement Location |
E-OS |
56 |
OS |
E-OLV |
54 |
OLV |
E-MPT |
64 |
MPT |
P-PR1 to P-PR5 |
61 |
HFC |
Table 4.9 Identified
Noise Sensitive Receivers
Noise Sensitive Receiver |
Existing /
Planned |
Use[1] |
Approximate
Distance from the Project Boundary, m |
No. of Storey or Height in mPD |
Assessment
Conducted [2] |
|
ID |
Description |
|||||
E-PC |
Park
Central |
Existing |
R |
230 |
170 mPD |
C |
E-HKMLCMTPS |
Hong
Kong and Macau Lutheran Church Ming Tao Primary School |
Existing |
E |
260 |
35 mPD |
C |
E-CIHE |
Caritas
Institute of Higher Education |
Existing |
E |
170 |
65 mPD |
C |
E-CBCC |
Caritas
Bianchi College of Careers |
Existing |
E |
80 |
65 mPD |
C |
E-MT |
Metro
Town |
Existing |
R |
<5 |
200 mPD |
C |
E-C |
Capri |
Existing |
R |
40 |
50 mPD |
C |
E-HKDI |
Hong
Kong Design Institute |
Existing |
E |
10 |
65 mPD |
C |
E-PKSS |
Po Kok
Secondary School |
Existing |
E |
180 |
40 mPD |
C |
E-AR |
Alto
Residences |
Existing |
R |
140 |
60 mPD |
C |
E-FIS |
French International
School |
Existing |
E |
170 |
30 mPD |
C |
E-SME |
Shin
Ming Estate |
Existing |
R |
170 |
120 mPD |
C |
E-CMC |
Choi
Ming Court |
Existing |
R |
170 |
120 mPD |
C |
E-KME |
Kin Ming
Estate |
Existing |
R |
190 |
130 mPD |
C |
E-HTSSTKO |
Heung To
Secondary School (Tseung Kwan O) |
Existing |
E |
240 |
55 mPD |
C |
E-GTEYS |
G. T.
(Ellen Yeung) School |
Existing |
E |
200 |
45 mPD |
C |
E-OS |
Ocean Shores |
Existing |
R |
<5 |
48 |
C, F, T, M |
E-OLV |
On Luen Village |
Existing |
R[3] |
30 |
1 |
C, F, T, M |
E-MPT |
Ma Pui Tsuen |
Existing |
R[3]
/ P[4] |
260 |
2 |
M |
P-PU1&2 |
Public Housing |
Proposed |
R |
0 |
200 mPD |
C, F, T |
P-PU3&4 |
Public Housing |
Proposed |
R |
0 |
190 mPD |
C, F, T |
P-PU5 |
Public Housing |
Proposed |
R |
0 |
180 mPD |
C, F, R, T |
P-PU6 |
Public Housing |
Proposed |
R |
0 |
175 mPD |
C, F, R, T |
P-PR1 |
Private Housing |
Proposed |
R |
0 |
190 mPD |
C, F, R, T, M |
P-PR2 |
Private Housing |
Proposed |
R |
0 |
175 mPD |
F, R, T, M |
P-PR3 |
Private Housing |
Proposed |
R |
0 |
155 mPD |
F, R, T, M |
P-PR4 |
Private Housing |
Proposed |
R |
0 |
120 mPD |
C, F, R, T, M |
P-PR5 |
Private Housing |
Proposed |
R |
0 |
120 mPD |
R, T, M |
P-E1 |
Secondary School |
Proposed |
E |
0 |
8 |
C, F, R, T |
P-E2 |
Primary School |
Proposed |
E |
0 |
8 |
C, F, R, T |
P-E3 |
Primary School |
Proposed |
E |
0 |
8 |
C, F, T |
P-E4 |
Primary School |
Proposed |
E |
0 |
8 |
C, F, T |
P-E5 |
Secondary School |
Proposed |
E |
0 |
8 |
C, F, T |
Notes: [1] R – Residential; E – Educational; P –
Place of public worship. [2] C – Construction Noise; F – Fixed Noise;
R – Rail Noise; T – Road Traffic Noise; M – Marine Traffic Noise. [3] Existing
residential uses located on area zoned Green Belt [4] Existing place
of public worship uses located on area zoned Green Belt |
Table 4.10 Representative
Noise Assessment Points for Construction Noise
NSR ID |
NAP ID |
Existing / Planned / Proposed |
Description |
Use [1] |
No. of Storey or Height in mPD |
E-C |
E-C-R-C1 to E-C-R-C2 |
Existing |
Podium and residential
block of Capri |
R |
50 mPD |
E-CMC |
E-CMC-R-C1 |
Existing |
Residential block
of Choi Kwai House |
R |
120 mPD |
E-FIS |
E-FIS-E-C1 to E-FIS-E-C3 |
Existing |
French
International School |
E |
30 mPD |
E-HKDI |
E-HKDI-C1 to E-HKDI-C2 |
Existing |
Podium of Hong
Kong Design Institute |
E |
65 mPD |
E-PC |
E-PC-R-C1 |
Existing |
Tower 6, Park
Central |
R |
170 mPD |
E-MT |
E-MT-R-C1 to E-MT-R-C3 |
Existing |
Tower 1-3 of Metro
town |
R |
200 mPD |
E-OS |
E-OS-R-C1 to E-OS-R-C2 |
Existing |
Tower 1 and17,
Ocean Shores |
R |
48 |
E-OLV |
E-OLV-R-C1 |
Existing |
Village House at
GLL S11295 of On Luen Village |
R[2] |
1 |
E-OLV-R-C2 |
Existing |
Village House at
GLL S11366a of On Luen Village |
R[2] |
1 |
|
E-OLV-R-C3 |
Existing |
Village House at
GLL S11124a of On Luen Village |
R[2] |
1 |
|
E-OLV-R-C4 |
Existing |
Village House at
GLL S11949 of On Luen Village |
R[2] |
1 |
|
P-PU1&2 |
P-PU12-R-C1, to P-PU12-R-C6 |
Proposed |
Residential Block
at the Proposed Site PU1&2 |
R |
200 mPD |
P-PU3&4 |
P-PU34-R-C1, to P-PU34-R-C4 |
Proposed |
Residential Block
at the Proposed Site PU3&4 |
R |
190 mPD |
P-PU5 |
P-PU5-R-C1 to P-PU5-R-C2 |
Proposed |
Residential Block
at the Proposed Site PU5 |
R |
180 mPD |
P-PU6 |
P-PU6-R-C1 to P-PU6-R-C3 |
Proposed |
Residential Block
at the Proposed Site PU6 |
R |
175 mPD |
P-PR1 |
P-PR1-R-C1 |
Proposed |
Residential Block at
the Proposed Site PR1 |
R |
190 mPD |
P-PR4 |
P-PR4-R-C1 to P-PR4-R-C2 |
Proposed |
Residential Block
at the Proposed Site PR4 |
R |
120 mPD |
P-E1 |
P-E1-E-C1 |
Proposed |
School at the
Proposed Site E1 |
E |
8 |
P-E2 |
P-E2-E-C1 to P-E2-E-C2 |
Proposed |
School at the Proposed
Site E2 |
E |
8 |
P-E3 |
P-E3-E-C1 |
Proposed |
School at the
Proposed Site E3 |
E |
8 |
P-E4 |
P-E4-E-C1 |
Proposed |
School at the
Proposed Site E4 |
E |
8 |
P-E5 |
P-E5-E-C1 |
Proposed |
School at the
Proposed Site E5 |
E |
8 |
Notes: [1] R
– Residential; E – Educational [2] Existing
residential uses located on area zoned Green Belt |
Table 4.11 Representative Noise Assessment Points for
Fixed Noise
NSR ID |
NAP ID |
Existing / Planned |
Description |
Use [1] |
No. of Storey or Height in mPD |
E-OS |
E-OS-R-F1 |
Existing |
Tower 3, Ocean Shores |
R |
48 |
E-OLV |
E-OLV-R-F1 |
Existing |
Village House at GLL S11295 of On Luen Village |
R[2] |
1 |
E-OLV-R-F2 |
Existing |
Village House at GLL S11366a of On Luen Village |
R[2] |
1 |
|
E-OLV-R-F3 |
Existing |
Village House at GLL S11124a of On Luen Village |
R[2] |
1 |
|
E-OLV-R-F4 |
Existing |
Village House at GLL S11949 of On Luen Village |
R[2] |
1 |
|
P-PU1&2 |
P-PU1-R-F1 to P-PU1-R-F3 and |
Proposed |
Residential Block at the Proposed Site PU1&2 |
R |
200 mPD |
P-PU3 |
P-PU3-R-F1 to P-PU3-R-F3 |
Proposed |
Residential Block at the Proposed Site PU3&4 |
R |
190 mPD |
P-PU5 |
P-PU5-R-F1 to P-PU5-R-F6 |
Proposed |
Residential Block at the Proposed Site PU5 |
R |
180 mPD |
P-PU6 |
P-PU6-R-F1 |
Proposed |
Residential Block at the Proposed Site PU6 |
R |
175 mPD |
P-PR1 |
P-PR1-R-F1 |
Proposed |
Residential Block at the Proposed Site PR1 |
R |
190 mPD |
P-PR2 |
P-PR2-R-F1 to P-PR2-R-F2 |
Proposed |
Residential Block at the Proposed Site PR2 |
R |
175 mPD |
P-PR3 |
P-PR3-R-F1 |
Proposed |
Residential Block at the Proposed Site PR3 |
R |
155 mPD |
P-PR4 |
P-PR4-R-F1 |
Proposed |
Residential Block at the Proposed Site PR4 |
R |
120 mPD |
P-E1 |
P-E1-E-F1 |
Proposed |
School at the Proposed Site E1 |
E |
8 |
P-E2 |
P-E2-E-F1 |
Proposed |
School at the Proposed Site E2 |
E |
8 |
P-E3 |
P-E3-E-F1 |
Proposed |
School at the Proposed Site E3 |
E |
8 |
P-E4 |
P-E4-E-F1 |
Proposed |
School at the Proposed Site E4 |
E |
8 |
P-E5 |
P-E5-E-F1 to P-E5-E-F2 |
Proposed |
School at the Proposed Site E5 |
E |
8 |
Notes: [1] R – Residential; E – Educational [2] Existing residential uses located
on area zoned Green Belt |
Table 4.12 Representative
Noise Assessment Points for Rail Noise
NSR ID |
NAP ID |
Existing /
Planned |
Description |
Use[1] |
No. of Storey
or Height in mPD |
Approximate
Separation Distance between TKLSE and NAP, m |
P-PU4 |
P-PU4-R-R1 |
Proposed |
Residential Block at the Proposed Site PU4 |
R |
190 mPD |
30 |
P-PU5 |
P-PU5-R-R1 |
Proposed |
Residential Block at the Proposed Site PU5 |
R |
180 mPD |
30 |
P-PU6 |
P-PU6-R-R1 |
Proposed |
Residential Block at the Proposed Site PU6 |
R |
175 mPD |
30 |
P-PR1 |
P-PR1-R-R1 |
Proposed |
Residential Block at the Proposed Site PR1 |
R |
190 mPD |
30 |
P-PR2 |
P-PR2-R-R1 |
Proposed |
Residential Block at the Proposed Site PR2 |
R |
175 mPD |
25 |
P-PR3 |
P-PR3-R-R1 |
Proposed |
Residential Block at the Proposed Site PR3 |
R |
155 mPD |
25 |
P-PR4 |
P-PR4-R-R1 |
Proposed |
Residential Block at the Proposed Site PR4 |
R |
120 mPD |
25 |
P-PR5 |
P-PR5-R-R1 |
Proposed |
Residential Block at the Proposed Site PR5 |
R |
120 mPD |
30 |
P-E1 |
P-E1-E-R1 |
Proposed |
School at the Proposed Site E1 |
E |
8 |
60 |
P-E2 |
P-E2-E-R1 |
Proposed |
School at the Proposed Site E2 |
E |
8 |
50 |
Notes: [1] R – Residential; E – Educational |
Table 4.13 Representative
Noise Assessment Points for Road Traffic Noise
Noise Sensitive Receiver |
Existing /
Proposed |
Use [1] |
Approx.
Distance from the Project Boundary, m |
No. of Storey or Height in mPD |
NAP ID |
||
NSR ID |
Description of NSR |
||||||
Area TKO 132 |
|||||||
E-OS |
Ocean Shores |
Existing |
R |
130 |
48 |
E-OS-R-T01_01 |
|
E-OLV |
On Luen Village |
Existing |
R[2] |
30 |
1 |
E-OLV-R-T01_01 to |
|
Area TKO 137 |
|||||||
P-PU1&2 |
Public Housing |
Proposed |
R |
0 |
200 mPD |
P-PU1-R-T01_01 to |
|
P-PU2-R-T01_01 to |
|||||||
P-PU3&4 |
Public Housing |
Proposed |
R |
0 |
190 mPD |
P-PU3-R-T01_01 to |
|
P-PU4-R-T01_01 to |
|||||||
P-PU5 |
Public Housing |
Proposed |
R |
0 |
180 mPD |
P-PU5-R-T01_01 to |
|
P-PU6 |
Public Housing |
Proposed |
R |
0 |
175 mPD |
P-PU6-R-T01_01 to |
|
P-PR1 |
Private Housing |
Proposed |
R |
0 |
190 mPD |
P-PR1-R-T01_01 to |
|
P-PR2 |
Private Housing |
Proposed |
R |
0 |
175 mPD |
P-PR2-R-T01_01 to |
|
P-PR3 |
Private Housing |
Proposed |
R |
0 |
155 mPD |
P-PR3-R-T01_01 to |
|
P-PR4 |
Private Housing |
Proposed |
R |
0 |
120 mPD |
P-PR4-R-T01_01 to |
|
P-PR5 |
Private Housing |
Proposed |
R |
0 |
120 mPD |
P-PR5-R-T01_01 to |
|
P-E1 |
Secondary School |
Proposed |
E |
0 |
8 |
P-E1-E-T01_01 to |
|
P-E2 |
Primary School |
Proposed |
E |
0 |
8 |
P-E2-E-T01_01 to |
|
P-E3 |
Primary School |
Proposed |
E |
0 |
8 |
P-E3-E-T01_01 to |
|
P-E4 |
Primary School |
Proposed |
E |
0 |
8 |
P-E4-E-T01_01 |
|
P-E5 |
Secondary School |
Proposed |
E |
0 |
8 |
P-E5-E-T01_01 to |
|
Notes: [1] R – Residential; E – Educational [2] Existing residential uses located
on area zoned Green Belt |
|
||||||
Table 4.14 Representative Noise Assessment Points for
Marine Traffic Noise
NSR ID |
NAP ID |
Existing / Proposed |
Description |
Use [1] |
No. of Storey or Height in mPD |
|
E-OS |
E-OS-R-M1 |
Existing |
Tower 1, Ocean Shores |
R |
170 mPD |
|
E-OLV |
E-OLV-R-M1 |
Existing |
Village House at GLL S11295 of On Luen Village |
R[2] |
1 |
|
E-OLV-R-M2 |
Existing |
Village House at GLL S11366a of On Luen Village |
R[2] |
1 |
||
E-OLV-R-M3 |
Existing |
Village House at GLL S11124a of On Luen Village |
R[2] |
1 |
||
E-OLV-R-M4 |
Existing |
Village House at GLL S11949 of On Luen Village |
R[2] |
1 |
||
E-MPT |
E-MPT-R-M1 |
Existing |
Tin Hau Temple near Ma Pui Tsuen |
P[3] |
2 |
|
P-PR1 |
P-PR1-R-M1 |
Proposed |
Residential development at Site PR1 |
R |
190 mPD |
|
P-PR2 |
P-PR2-R-M1 |
Proposed |
Residential development at Site PR2 |
R |
175 mPD |
|
P-PR3 |
P-PR3-R-M1 |
Proposed |
Residential development at Site PR3 |
R |
155 mPD |
|
P-PR4 |
P-PR4-R-M1 |
Proposed |
Residential development at Site PR4 |
R |
120 mPD |
|
P-PR5 |
P-PR5-R-M1 |
Proposed |
Residential development at Site PR5 |
R |
120 mPD |
|
Notes: [1] R – Residential; E – Educational;
P – Place of Public Worship [2] Existing residential
uses located on area zoned Green Belt [3] Existing place
of worship uses located on area zoned Green Belt |
|
|||||
Table 4.15 Identified
Fixed Noise Sources
Site ID |
Description |
Existing /
Proposed |
Location |
Approximate
Distance from nearest NAP, m |
EFs |
Electricity Facilities (EFs) |
Proposed |
TKO 132 |
140 |
CWHF |
Construction Waste Handling Facility (CWHF) |
Proposed |
TKO 132 |
160 |
PFTF |
Public Fill Transfer Facility (PFTF) |
Proposed |
TKO 132 |
190 |
RTS |
Refuse Transfer Station (RTS) |
Proposed |
TKO 132 |
260 |
CBP |
Concrete Batching Plant (CBP) |
Proposed |
TKO 132 |
220 |
SPS |
Sewage Pumping Station |
Proposed |
TKO 132 |
150 |
G2 |
Fire Station cum Ambulance Depot |
Proposed |
TKO 137 |
10 |
G3 |
Government Office Complex cum Sports Centre |
Proposed |
TKO 137 |
10 |
G3 |
Temporary Public Transport Facility (PTF) |
Proposed |
TKO 137 |
10 |
G4 |
Government Complex |
Proposed |
TKO 137 |
10 |
O5 |
Temporary PTF |
Proposed |
TKO 137 |
40 |
OU3 |
Green Filling Station (GFS) |
Proposed |
TKO 137 |
90 |
OU4 |
Effluent Polishing Plant (EPP) |
Proposed |
TKO 137 |
100 |
OU4 |
Advance Sewage Pumping Station |
Proposed |
TKO 137 |
100 |
PR1 |
Public Transport Interchange (PTI) |
Proposed |
TKO 137 |
0 |
PR3 |
Public PTI |
Proposed |
TKO 137 |
0 |
TKOIP |
Tseung Kwan O InnoPark (TKOIP) |
Existing |
TKO 137 |
110 |
SENTX |
Infrastructure Area of SENT Landfill and its
Extension (SENTX) |
Existing |
TKO 137 |
120 |
SNG |
Synthetic Natural Gas Plant (SNG) |
Existing |
TKO 137 |
70 |
TKO DP |
Desalination Plant (TKO DP) |
Existing |
TKO 137 |
40 |
CD TKO |
Cavern
Development in Area around Tseung Kwan O |
Planned |
TKO 137 |
50 |
TKLSE |
Ventilation buildings potentially at proposed
railway reserve for Tseung Kwan O Line Southern Extension at Sites PR1, PR2,
PR3 and PR5 |
Planned |
TKO 137 |
0 |
) (1) where, Lmax is the measured
maximum noise level, in dB(A) LAeq, is the background
noise level, in dB(A) Lmax,c is the corrected
marine traffic passby maximum noise level, in
dB(A); |
Remarks:
-
Referenced from ISO 2922:2020 Measurement
of airborne sound emitted by vessels on inland waterways and harbours |
(2) where, LAX is the single event sound exposure
level; Lmax,c is the corrected maximum noise level, in dB(A); k is the empirical constant = 2 for marine
traffic, with reference to Transportation Noise Reference Book, 1987; dm is the distance between the marine
vessel and the measurement location, m; V is the speed of the marine vessel in m/s. |
Remarks: -
Distance between
the measured vessel and the measurement point is based on vessel track of
AIS/Radar or site observation and the location of the measurement point -
Speed of the
measured vessel were obtained from AIS / Radar data -
Reference from
equation 2.22 of Transportation Noise Reference Book, 1987 |
(3) |
where
LAX25 is the single event sound exposure
level at 25m from the sailing marine vessel
LAX is the single event sound
exposure level
dm is the distance between the
marine vessel and the measurement location, m.
|
Remarks:
-
Referenced from ISO 2922:2020 Measurement
of airborne sound emitted by vessels on inland waterways and harbours
|
(4) |
where
d = distance between measured vessel along
the notional vessel track and noise assessment point (m)
d0= reference distance of 25 (m)
T = 1 hr = 3600 seconds
N = number of vessel passby
per 1 hour period
FC = façade correction = +3dB(A)
|
Table 4.16 Tentative
Years of Population Intake / Operation for the Proposed Sites
Sites |
Facilities/Uses |
Tentative First Population Intake / Operation
Year |
|
TKO 137 |
PU1&2 |
Residential |
2030 [1] |
TKO 137 |
PU3&4 |
Residential |
2033 [1] |
TKO 137 |
PU5 |
Residential |
2035 [1] |
TKO 137 |
PU6 |
Residential |
2035 [1] |
TKO 137 |
PR1 |
Residential |
2035 [1] |
TKO 137 |
PR2 |
Residential |
2041 [1] |
TKO 137 |
PR3 |
Residential |
2041 [1] |
TKO 137 |
PR4 |
Residential |
2038 [1] |
TKO 137 |
PR5 |
Residential |
2041 [1] |
TKO 137 |
E1 |
Educational |
2030 |
TKO 137 |
E2 |
Educational |
2030 |
TKO 137 |
E3 |
Educational |
2035 |
TKO 137 |
E4 |
Educational |
2035 |
TKO 137 |
E5 |
Educational |
2035 |
TKO 137 |
G1 |
Police Station |
2034 |
TKO 137 |
G2 |
Fire Station cum
Ambulance Depot |
2034 |
TKO 137 |
G3 |
Government
Office Complex cum Sport Centre |
2040 |
TKO 137 |
G4 |
Government
Complex |
2035 |
TKO 137 |
OU1 |
Electric
Substation (ESS) |
2030 |
TKO 137 |
OU2 |
Electric
Substation (ESS) |
2035 |
TKO 137 |
OU3 |
Green Filling Station
(GFS) |
2035 |
TKO 137 |
OU4 |
Advance Sewage
Pumping Station |
2030 |
OU4 |
Effluent Polishing Plant (EPP) |
2035 / 2041 [2] |
|
TKO 137 |
OU5 |
Fresh Water Service Reservoir |
2031 |
TKO 137 |
OU6 |
Salt Water Service Reservoir |
2030 |
TKO 132 |
OU1 |
EFs |
2035 |
TKO 132 |
OU2 |
CWHF |
2031 |
TKO 132 |
OU3 |
PFTF |
2030 |
TKO 132 |
OU4 |
RTS |
2031 |
TKO 132 |
OU5 |
CBP |
2030 |
TKO 132 |
OU6 |
SPS |
2031 |
Remarks: [1] The above year of population intake/operation
considered the 9-month period for occupation permit application, after the
construction end dates, as shown in Appendix 4.3. [2] Phase 1 and Phase 2 operation year for EPP
are 2035 and 2041, respectively. |
TKO 137
Concurrent
Projects for TKO 137
TKO 132
Table 4.17 Fixed
Noise Criteria for
Proposed Fixed Noise Sources
NSR ID |
NAP ID |
Noise Level
(Day / Evening / Night), dB(A) |
||
ANL-5 |
Prevailing
Background |
Fixed Noise
Criteria for Proposed Fixed Plant |
||
E-OS |
E-OS-R-F1 |
60 / 60 / 50 |
52 / 51 / 48 |
52 / 51 / 48 |
E-OLV |
E-OLV-R-F1 |
55 / 55 / 45 |
50 / 51 / 50 |
50 / 51 / 45 |
E-OLV-R-F2 |
||||
E-OLV-R-F3 |
||||
E-OLV-R-F4 |
||||
P-PU1&2 |
P-PU1-R-F1 to P-PU1-R-F3 and |
60 / 60 / 50 [1] |
56 / 54 / 53 [1] |
56 / 54 / 50 [1] |
P-PU3 |
P-PU3-R-F1 to P-PU3-R-F2 |
|||
P-PU5 |
P-PU5-R-F1 to P-PU5-R-F6 |
|||
P-PR2 |
P-PR2-R-F1 to P-PR2-R-F2 |
|||
P-PR3 |
P-PR3-R-F1 |
|||
P-PR4 |
P-PR4-R-F1 |
|||
P-E1 |
P-E1-E-F1 |
|||
P-E2 |
P-E2-E-F1 |
|||
P-E3 |
P-E3-E-F1 |
|||
P-E4 |
P-E4-E-F1 |
|||
P-E5 |
P-E5-E-F1 to P-E5-E-F2 |
|||
Remarks: [1] No night-time noise sensitive uses would
be expected at the proposed educational use sites P-E1 to P-E5. |
Proposed
Fixed Noise Sources at TKO 137
Cumulative
Impact from Existing Fixed Noise Sources and Planned Fixed Noise Sources at TKO
137
Proposed
Fixed Noise Sources at TKO 132
Fixed
Noise Impact Assessment Requirements
Table 4.18 Predicted Road Traffic Noise Level at TKO 132
under Prevailing (Year 2024) and Unmitigated (Year
2041) Scenarios
NSR ID |
NAP ID [1] |
Criteria, L10 1-hr dB(A) |
Max. Predicted Noise Level, L10 1hr
dB(A) [2] |
Mitigation Measure required? |
|||
Prevailing (Year 2024) |
Unmitigated (Year 2041) |
||||||
Project Roads |
Other Roads |
Overall |
|||||
E-OS |
E-OS-R-T01_01 |
70 |
61 - 64 |
56 - 60 |
64 - 67 |
65 - 67 |
N |
E-OLV |
E-OLV-R-T01_01 |
70 |
N/A [3] |
47 |
N/A [3] |
47 |
N |
E-OLV-R-T02_01 |
70 |
N/A [3] |
65 |
N/A [3] |
65 |
N |
|
E-OLV-R-T03_01 |
70 |
N/A [3] |
40 |
N/A [3] |
40 |
N |
|
E-OLV-R-T04_01 |
70 |
N/A [3] |
41 |
N/A [3] |
41 |
N |
[1] The assessment only
includes NSRs which rely on opened windows for ventilation.
[2] Noise levels would be
rounded up to nearest integer to determine the compliance of the criteria.
[3] There are no existing
roads/other roads within 300 m assessment area of these NAPs.
Table 4.19 Predicted
Road Traffic Noise Level at TKO 137 under Unmitigated Scenario (Year 2041)
NSR ID |
NAP ID [1] |
Criteria, L10 1-hr dB(A) |
Max. Predicted Noise Level in Year 2041, L10
1hr dB(A) [2] [3] |
Floor with Noise Exceedance |
Further Mitigation
Measure required? |
||
Project Roads |
Other Roads |
Overall |
|||||
P-PU1&2 |
P-PU1-R-T01_01 |
70 |
59 - 62 |
36 – 59 |
59 - 63 |
- |
N |
|
P-PU1-R-T02_01 to P-PU1-R-T02_05 |
70 |
58 - 71 |
0 – 54 |
58 - 71 |
4/F - 13/F |
Y |
|
P-PU1-R-T03_01 |
70 |
46 - 69 |
16 – 19 |
46 - 69 |
- |
N |
|
P-PU1-R-T04_01
to P-PU1-R-T04_04 |
70 |
60 - 72 |
0 – 50 |
60 - 72 |
1/F - 19/F |
Y |
|
P-PU2-R-T01_01
to P-PU2-R-T06_01 |
70 |
61 - 70 |
0 – 58 |
61 - 70 |
- |
N |
P-PU3&4 |
P-PU3-R-T01_01 |
70 |
62 - 65 |
10 – 11 |
62 - 65 |
- |
N |
|
P-PU3-R-T02_01
to P-PU3-R-T02_03 |
70 |
65 - 72 |
13 – 47 |
65 - 72 |
1/F - 14/F |
Y |
|
P-PU3-R-T03_01
to P-PU3-R-T03_02 |
70 |
65 - 71 |
0 – 45 |
65 - 71 |
1/F - 5/F |
Y |
|
P-PU3-R-T04_01
to P-PU3-R-T04_02 |
70 |
64 - 68 |
0 – 13 |
64 - 68 |
- |
N |
|
P-PU4-R-T01_01
to P-PU4-R-T01_02 |
70 |
63 - 70 |
0 |
63 - 70 |
- |
N |
|
P-PU4-R-T02_01 |
70 |
61 - 66 |
10 – 11 |
61 - 66 |
- |
N |
|
P-PU4-R-T03_01
to P-PU4-R-T03_02 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU4-R-T04_01 |
70 |
63 - 66 |
0 |
63 - 66 |
- |
N |
P-PU5 |
P-PU5-R-T01_01
to P-PU5-R-T01_02 |
70 |
63 - 71 |
0 |
63 - 71 |
1/F - 5/F |
Y |
|
P-PU5-R-T02_01
to P-PU5-R-T02_02 |
70 |
63 - 68 |
0 |
63 - 68 |
- |
N |
|
P-PU5-R-T03_01
to P-PU5-R-T03_02 |
70 |
63 - 72 |
0 |
63 - 72 |
1/F - 5/F |
Y |
|
P-PU5-R-T04_01
to P-PU5-R-T04_02 |
70 |
64 - 68 |
0 |
64 - 68 |
- |
N |
P-PU6 |
P-PU6-R-T01_01
to P-PU6-R-T01_02 |
70 |
62 - 69 |
0 |
62 - 69 |
- |
N |
|
P-PU6-R-T02_01
to P-PU6-R-T02_02 |
70 |
64 - 67 |
0 |
64 - 67 |
- |
N |
|
P-PU6-R-T03_01 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU6-R-T04_01 |
70 |
60 - 64 |
0 |
60 - 64 |
- |
N |
|
P-PU6-R-T05_01
to P-PU6-R-T05_02 |
70 |
61 - 70 |
0 |
61 - 70 |
- |
N |
|
P-PU6-R-T06_01
to P-PU6-R-T06_02 |
70 |
60 - 66 |
0 |
60 - 66 |
- |
N |
P-PR1 |
P-PR1-R-T01_01 to P-PR1-R-T03_01 |
70 |
63 - 68 |
0 - 45 |
63 - 68 |
- |
N |
P-PR2 |
P-PR2-R-T01_01 to P-PR2-R-T03_01 |
70 |
62 - 69 |
0 |
62 - 69 |
- |
N |
P-PR3 |
P-PR3-R-T01_01 to P-PR3-R-T02_02 |
70 |
57 - 68 |
0 |
57 - 68 |
- |
N |
P-PR4 |
P-PR3-R-T01_01 to P-PR3-R-T03_01 |
70 |
64 - 69 |
0 |
64 - 69 |
- |
N |
P-PR5 |
P-PR5-R-T01_01 to P-PR5-R-T04_02 |
70 |
59 - 66 |
0 |
59 - 66 |
- |
N |
P-E1 |
P-E1-E-T01_01
to P-E1-E-T01_04 |
65 |
60 - 68 |
0 - 18 |
60 - 68 |
1/F - 8/F |
Y |
P-E2 |
P-E2-E-T01_01
to P-E2-E-T01_03 |
65 |
62 - 69 |
0 - 11 |
62 - 69 |
1/F - 8/F |
Y |
P-E3 |
P-E3-E-T01_01
to P-E3-E-T01_02 |
65 |
69 - 73 |
0 |
69 - 73 |
1/F - 8/F |
Y |
P-E4 |
P-E4-E-T01_01 |
65 |
71 - 73 |
0 |
71 - 73 |
1/F - 8/F |
Y |
P-E5 |
P-E5-E-T01_01
to P-E5-E-T01_03 |
65 |
68 - 73 |
0 |
68 - 73 |
1/F - 8/F |
Y |
[1] The assessment only
includes NSRs which rely on opened windows for ventilation.
[2] Noise levels would be
rounded up to nearest integer to determine the compliance of the criteria.
[3] Boldfaced and underline
values indicate exceedance to relevant noise criteria.
Table 4.20 Predicted Marine Traffic Noise Levels
NSR ID |
NAP ID |
Predicted Peak
Hour Cumulative Marine Traffic Noise Level, Leq
(1-hr) dB(A) |
Predicted
Peak Hour Marine Traffic Noise Level due to Project Related Vessels, Leq (1-hr) dB(A) |
Marine
Traffic Noise Criteria, |
E-OS |
E-OS-R-M1 |
49 |
40 |
56 |
E-OLV |
E-OLV-R-M1 |
53 |
48 |
54 |
E-OLV-R-M2 |
54 |
48 |
||
E-OLV-R-M3 |
52 |
48 |
||
E-OLV-R-M4 |
52 |
48 |
||
E-MPT |
E-MPT-R-M1 |
63 |
58 |
64 |
P-PR1 |
P-PR1-R-M1 |
61 |
/ |
61 |
P-PR2 |
P-PR2-R-M1 |
61 |
||
P-PR3 |
P-PR3-R-M1 |
61 |
||
P-PR4 |
P-PR4-R-M1 |
61 |
||
P-PR5 |
P-PR5-R-M1 |
61 |
Table 4.21 Quieter Construction Method / Equipment
Construction
Plant Inventory Index (reference to Appendix 4.4) |
Involved
Construction Process |
Conventional
Construction Method / Equipment |
Quieter
Construction Method / Equipment |
All |
Sheet pile walls and precast structures
construction |
In-situ concreting for reclamation works |
Hydraulic press-in method |
A |
Demolition / Removal of existing seawall and
concrete structure |
Excavator-mounted breaker |
Use of hydraulic crusher / bursting system /
quieter type blade saw (e.g. diamond saw) / use of chemical expansion agent |
A |
Material handling / barging |
Conveyor |
Fully enclosed conveyor |
C, F |
Site formation / Filling / slope cutting |
Drill and break method / Excavator-mounted
breaker |
Use of hydraulic splitter, hydraulic crusher /
bursting system / quiet type saw / use of chemical expansion agent |
D, E, F, G, H, I, J |
Various, including marine viaduct works, site
clearance, site formation (such as small boulder removal), infrastructure
works, building construction, etc. |
- Bitumen Paver - Drum Roller - Mobile Crane - Excavator - Bulldozer - Loader - Roller - Compactor - Generator - Air Compressor |
Use of QPME[1] |
F |
Site Formation Works, such as small boulder
removal |
Excavator-mounted breaker |
Mini-breaker |
G |
Hydraulic crusher for demolition of PTF |
Excavator-mounted breaker |
Hydraulic crusher |
infrastructural works |
Excavator-mounted breaker |
Mini-breaker |
|
H |
Large diameter pipe laying |
Cut and cover method / Excavator-mounted breaker |
Pipe jacking using micro tunnel boring machine |
Construction / site formation works, such as
small boulder removal |
Excavator-mounted breaker |
Mini-breaker |
|
K |
Building works |
Excavator-mounted breaker |
Use of quiet type saw (e.g. diamond saw),
Robot-type hydraulic crusher or handheld concrete crusher |
Construction works |
Excavator-mounted breaker |
Mini-breaker |
|
Piling works |
Percussive piling |
Large diameter
bored piling method |
|
Building superstructure works |
In-situ construction |
Use of pre-casting and prefabrication technology |
|
F, G, H, I, J, K |
Road works (Concrete compacting) |
Vibratory Poker |
Self-compacting Concrete or Rubber head Poker
Vibrator |
Remarks: [1] Quality PME available at
https://www.epd.gov.hk/epd/english/environmentinhk/noise/qpme/search_gen.php?lang=eng&st=sim&valid=Y |
Construction
Noise Assessment Requirements
Table 4.22 Requirements of Quantitative Construction Noise Assessment in Pre-tender Stage and Pre-construction Stage of Relevant Construction Activities
Construction Activity |
Responsible Party |
Mechanism of Conducting Construction Noise
Assessment |
Relevant Noise Guidelines |
Construction of TKLSE |
Proponent of the concurrent project |
Application of EP via separate EIA or
Direct Application of EP under EIAO-TM and subsequent CNMP(s) |
EIAO-TM and EIAO-GN 9/2023 |
Construction
of EFs |
Proponent of the proposed facilities |
||
Construction
of CWHF |
Proponent of the proposed facilities |
||
Construction
of RTS |
Proponent of the proposed facilities |
||
Construction
of Cavern Development of Tseung Kwan O |
Proponent of the concurrent project |
Under separate study |
EIAO-TM, EIAO-GN 9/2023 or ProPECC PN1/24 |
TKO 137 reclamation works |
Project Proponent |
CNMP required under EP of this EIA Project |
EIAO-TM and EIAO-GN 9/2023 |
TKO 132 reclamation works |
Project Proponent |
||
Construction of Effluent Polishing Plant at
OU4 |
Proponent of the proposed facilities |
||
Marine viaduct works |
Project Proponent |
||
TKO 137 site formation works |
Project Proponent |
CNMP for non-DPs under EM&A of this EIA
Project |
ProPECC
PN1/24 |
TKO 137 infrastructure works |
Project Proponent |
||
TKO 137 advance sewage pumping station |
Proponent of the proposed facilities |
||
TKO 132 site formation works |
Project Proponent |
||
TKO 132 infrastructure works |
Project Proponent |
||
Site formation and construction of service
reservoirs |
Proponent of the service reservoirs |
||
Construction of PFTF |
Proponent of the proposed facilities |
Existing planning and funding mechanism of
PER |
ProPECC
PN1/24 |
Construction of SPS |
Proponent of the proposed facilities |
||
Remarks: Professional Persons Environmental Consultative Committee (ProPECC) Practice Notes (PN) 1/24 stated that for
minimisation of construction noise impact for construction activities during
non-restricted hours, the requirements and implementation of the noise
control measures given under the Recommended Pollution Control Clauses for
Construction Contracts in EPD’s website should be followed. Further
measures for construction works containing noisy construction activities in
close proximity to NSRs, as stated in the ProPECC
PN 1/24. |
Quantitative Fixed Noise
Impact Assessment
Table 4.23 Requirements of Quantitative Fixed Noise Assessment in Pre-Tender Stage and Pre-Construction Stage of the Project
Noise Source |
Responsible
Party |
Mechanism of Conducting Fixed Noise Assessment [1] [2] |
Relevant Noise Guidelines |
|
Source / Site ID |
Description |
|||
TKO 132 |
||||
EFs |
Electricity Facilities (EFs) |
Proponent of
the proposed fixed noise source |
Application of
EP via separate EIA or Direct Application of EP under EIAO-TM and subsequent
FNMP(s) |
EIAO-TM
and
EIAO-GN16/2023 |
CWHF |
Construction Waste Handling Facility (CWHF) |
Proponent of
the proposed fixed noise source |
Application of
EP via separate EIA or Direct Application of EP under EIAO-TM and subsequent
FNMP(s) |
EIAO-TM
and
EIAO-GN16/2023 |
RTS |
Refuse Transfer Station (RTS) |
Proponent of
the proposed fixed noise source |
Application of
EP via separate EIA or Direct Application of EP under EIAO-TM and subsequent
FNMP(s) |
EIAO-TM
and
EIAO-GN16/2023 |
PFTF |
Public Fill Transfer Facility (PFTF) |
Proponent of
the proposed fixed noise source |
Preliminary
Environmental Review (PER) under planning and funding mechanism |
HKPSG |
SPS |
Sewage Pumping Station |
Proponent of
the proposed fixed noise source |
PER under
planning and funding mechanism |
HKPSG |
CBP |
Concrete Batching Plant (CBP) |
Proponent of
the proposed fixed noise source |
Lease
condition |
HKPSG |
TKO 137 |
|
|
|
|
G2 |
Fire Station cum Ambulance Depot |
Proponent of
the proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
G3 |
Government Office Complex cum Sports Centre |
Proponent of
the proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
G3 |
Temporary Public Transport Facility (PTF) |
Proponent of
the proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
G4 |
Government Complex |
Proponent of the
proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
O5 |
Temporary PTF |
Proponent of
the proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
OU3 |
Green Filling Station (GFS) |
Proponent of
the proposed fixed noise source |
Lease condition |
HKPSG |
OU4 |
Effluent Polishing Plant (EPP) |
Proponent of
the proposed fixed noise source |
FNMP required in the EP of this current EIA
Project |
EIAO-TM and
EIAO-GN 16/2023 |
OU4 |
Advanced Sewage Pumping Station |
Proponent of
the proposed fixed noise source |
PER under planning and funding mechanism |
HKPSG |
PR1 |
Public Transport Interchange (PTI) |
Developer of
the proposed fixed noise source |
PER under Lease condition |
HKPSG |
PR3 |
Public Transport Interchange (PTI) |
Developer of
the proposed fixed noise source |
PER under Lease condition |
HKPSG |
TKOIP |
Tseung Kwan O InnoPark |
Developer of
the proposed NSR P-PU1&2 |
Environmental Assessment Study (EAS) for public
housing development |
HKPSG |
SENTX |
SENTX Landfill |
Developer of
the proposed NSR P-PU3&4 and P-PU5 |
EAS for public housing development |
HKPSG |
SNG |
Existing SNG Plant |
Developer of
the proposed NSR P-PU1&2 (if the population intake of the NSRs happen
while the SNG Plant in operation) |
EAS for public housing development |
HKPSG |
TKO DP |
Desalination Plant |
Developer of
the proposed NSR P-PU5, P-PU6, P-E3, P-E4, P-E5 |
Class Assessment Document for schools and
Environmental Assessment Study (EAS) for public housing development |
HKPSG |
CD TKO |
Cavern Development in Area around Tseung Kwan O |
Proponent of
the concurrent project |
Submission under separate study |
HKPSG /
EIAO-TM and EIAO-GN 16/2023 |
TKLSE |
Tseung Kwan O Line Southern Extension |
Proponent of
the concurrent project |
Application of EP via separate EIA under EIAO-TM
and subsequent FNMP(s) |
EIAO-TM and
EIAO-GN 16/2023 |
Remarks: [1] Preliminary Environmental Review (PER) shall
be submitted by proponents of the fixed noise sources in accordance with
Technical Circular (Works) No. 13/2003 - Guidelines and Procedures for
Environmental Impact Assessment of Government Projects and Proposals. [2] Class Assessment Document shall be submitted
by proponents of the schools in accordance with Final Report on Preparation
of a Class Assessment Document for Standard Schools issued by Architectural
Services Department. |
Area at TKO 132
Area at TKO 137
Table 4.24 Predicted Road
Traffic Noise Level at TKO 137 under Mitigated Scenario with LNRS only (Year
2041)
NSR ID |
NAP ID [1] |
Criteria, L10 1-hr dB(A) |
Max. Predicted Noise Level in Year 2041, L10
1hr dB(A) [2] [3] |
Floor with Noise Exceedance |
Further Mitigation
Measure required? |
||
Project Roads |
Other Roads |
Overall |
|||||
P-PU1&2 |
P-PU1-R-T01_01 |
70 |
59 - 61 |
36 - 59 |
59 - 63 |
- |
N |
|
P-PU1-R-T02_01 to P-PU1-R-T02_05 |
70 |
56 - 69 |
0 - 54 |
56 - 69 |
- |
N |
|
P-PU1-R-T03_01 |
70 |
44 - 67 |
16 - 19 |
44 - 67 |
- |
N |
|
P-PU1-R-T04_01
to P-PU1-R-T04_04 |
70 |
58 - 71 |
0 - 50 |
58 - 71 |
2/F - 6/F |
Y [4] |
|
P-PU2-R-T01_01
to P-PU2-R-T06_01 |
70 |
61 - 70 |
0 - 58 |
61 - 70 |
- |
N |
P-PU3&4 |
P-PU3-R-T01_01 |
70 |
62 - 65 |
10 - 11 |
62 - 65 |
- |
N |
|
P-PU3-R-T02_01 to P-PU3-R-T02_03 |
70 |
64 - 71 |
13 - 47 |
64 - 71 |
1/F - 2/F |
Y [4] |
|
P-PU3-R-T03_01 to P-PU3-R-T03_02 |
70 |
64 - 69 |
0 - 45 |
64 - 69 |
- |
N |
|
P-PU3-R-T04_01 to P-PU3-R-T04_02 |
70 |
64 - 68 |
0 - 13 |
64 - 68 |
- |
N |
|
P-PU4-R-T01_01 to P-PU4-R-T01_02 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU4-R-T02_01 |
70 |
61 - 66 |
10 - 11 |
61 - 66 |
- |
N |
|
P-PU4-R-T03_01 to P-PU4-R-T03_02 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU4-R-T04_01 |
70 |
63 - 66 |
0 |
63 - 66 |
- |
N |
P-PU5 |
P-PU5-R-T01_01 to P-PU5-R-T01_02 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU5-R-T02_01 to P-PU5-R-T02_02 |
70 |
63 - 68 |
0 |
63 - 68 |
- |
N |
|
P-PU5-R-T03_01 to P-PU5-R-T03_02 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU5-R-T04_01 to P-PU5-R-T04_02 |
70 |
64 - 68 |
0 |
64 - 68 |
- |
N |
P-PU6 |
P-PU6-R-T01_01 to P-PU6-R-T01_02 |
70 |
62 - 69 |
0 |
62 - 69 |
- |
N |
|
P-PU6-R-T02_01 to P-PU6-R-T02_02 |
70 |
63 - 67 |
0 |
63 - 67 |
- |
N |
|
P-PU6-R-T03_01 |
70 |
62 - 70 |
0 |
62 - 70 |
- |
N |
|
P-PU6-R-T04_01 |
70 |
58 - 63 |
0 |
58 - 63 |
- |
N |
|
P-PU6-R-T05_01 to P-PU6-R-T05_02 |
70 |
61 - 70 |
0 |
61 - 70 |
- |
N |
|
P-PU6-R-T06_01 to P-PU6-R-T06_02 |
70 |
59 - 66 |
0 |
59 - 66 |
- |
N |
P-PR1 |
P-PR1-R-T01_01 to P-PR1-R-T03_01 |
70 |
62 - 68 |
0 - 45 |
62 - 68 |
- |
N |
P-PR2 |
P-PR2-R-T01_01 to P-PR2-R-T03_01 |
70 |
62 - 69 |
0 |
62 - 69 |
- |
N |
P-PR3 |
P-PR3-R-T01_01 to P-PR3-R-T02_02 |
70 |
56 - 66 |
0 |
56 - 66 |
- |
N |
P-PR4 |
P-PR3-R-T01_01 to P-PR3-R-T03_01 |
70 |
64 - 69 |
0 |
64 - 69 |
- |
N |
P-PR5 |
P-PR5-R-T01_01 to P-PR5-R-T04_02 |
70 |
59 - 66 |
0 |
59 - 66 |
- |
N |
P-E1 |
P-E1-E-T01_01 to P-E1-E-T01_04 |
65 |
60 - 68 |
0 - 18 |
60 - 68 |
1/F - 8/F |
Y [5] |
P-E2 |
P-E2-E-T01_01 to P-E2-E-T01_03 |
65 |
62 - 68 |
0 - 11 |
62 - 68 |
1/F - 8/F |
Y [5] |
P-E3 |
P-E3-E-T01_01 to P-E3-E-T01_02 |
65 |
69 - 71 |
0 |
69 - 71 |
1/F - 8/F |
Y [5] |
P-E4 |
P-E4-E-T01_01 |
65 |
69 - 70 |
0 |
69 - 70 |
1/F - 8/F |
Y [5] |
P-E5 |
P-E5-E-T01_01 to P-E5-E-T01_03 |
65 |
68 - 71 |
0 |
68 - 71 |
1/F - 8/F |
Y [5] |
[1] The assessment only includes
NSRs which rely on opened windows for ventilation.
[2] Noise levels would be
rounded up to nearest integer to determine the compliance of the criteria.
[3] Boldfaced and underline
values indicate exceedance to relevant noise criteria.
[4] At-receiver mitigation
measures such as acoustic window or blank façade are recommended.
[5] Noise insultation with
suitable window type and air-conditioning is recommended.
Table 4.25 Optimised Mitigation Measures for Road Traffic Noise
Impact
Affected NSRs |
NAPs |
Mitigation
Measures |
Implementation
Schedule |
Low Noise Road Surfacing |
|||
P-PU1 |
P-PU1-R-T02_03,
P-PU1-R-T04_02,
P-PU1-T04_03 |
~ 250 m LNRS on Road
L8 [1] |
Commencement
of Road L8 |
P-PU3 |
P-PU3-R-T02_02,
P-PU3-R-T02_03, P-PU3-R-T03_01 |
~ 200 m LNRS
on Road L8 [1] |
Commencement
of Road L8 |
P-PU5 |
P-PU5-R-T01_02,
P-PU5-T03_01 |
~145 m LNRS on
Road L1 [1] |
Commencement
of Road L1 |
At-receiver Mitigation Measures |
|||
P-PU1 |
P-PU1-R-T04_02 |
Blank Wall /
Acoustic Window [2] |
Population
Intake of the Protected NSR |
P-PU3 |
P-PU3-R-T02_02 |
Blank Wall /
Acoustic Window [2] |
|
P-E1 to P-E5 |
P-E1-E-T01_01,
P-E1-E-T01_02 & P-E1-E-T01_04 |
Noise Insulation
with suitable window type and air-conditioning.[3] |
|
P-E2-E-T01_02 & P-E2-E-T01_03 |
|||
P-E3-E-T01_01 &
P-E3-E-T01_02 |
|||
P-E4-E-T01_01 |
|||
P-E5-E-T01_01,
P-E5-E-T01_02 & P-E5-E-T01_03
[1] |
[1] Agreed with Highways Department.
[2] Agreed with Housing Department.
[3] Subject to the Class
Assessment Report by the school proponents.
Table 4.26 Predicted Road Traffic Noise Level at TKO 137 under Optimised Mitigation Measures Scenario (Year 2041)
NSR ID |
NAP ID [1] |
Criteria, L10 1-hr dB(A) |
Max. Predicted Noise Level in Year 2041, L10
1hr dB(A) [2] |
Floor Require Mitigation |
Mitigation Measures
Implemented |
||
Project Roads |
Other Roads |
Overall |
|||||
P-PU1&2 |
P-PU1-R-T01_01 |
70 |
59 - 61 |
36 - 59 |
59 – 63 |
- |
- |
|
P-PU1-R-T02_01 to P-PU1-R-T02_05 |
70 |
56 - 69 |
0 - 54 |
56 – 69 |
- |
- |
|
P-PU1-R-T03_01 |
70 |
44 - 67 |
16 - 19 |
44 – 67 |
- |
- |
|
P-PU1-R-T04_01
to P-PU1-R-T04_04 |
70 |
58 - 70 |
0 - 50 |
58 – 70 |
Only for 2/F – 6/F of
P-PU1-R-T04_02 [3] |
Acoustic Window [3] |
|
P-PU2-R-T01_01
to P-PU2-R-T06_01 |
70 |
61 - 70 |
0 - 58 |
61 – 70 |
- |
- |
P-PU3&4 |
P-PU3-R-T01_01 |
70 |
62 - 65 |
10 - 11 |
62 – 65 |
- |
- |
|
P-PU3-R-T02_01 to P-PU3-R-T02_03 |
70 |
64 - 70 |
13 - 47 |
64 – 70 |
Only for 1/F – 2/F of P-PU3-R-T02_02 [3] |
Acoustic Window [3] |
|
P-PU3-R-T03_01 to P-PU3-R-T03_02 |
70 |
64 - 69 |
0 - 45 |
64 – 69 |
- |
- |
|
P-PU3-R-T04_01 to P-PU3-R-T04_02 |
70 |
64 - 68 |
0 - 13 |
64 – 68 |
- |
- |
|
P-PU4-R-T01_01 to P-PU4-R-T01_02 |
70 |
63 - 70 |
0 |
63 – 70 |
- |
- |
|
P-PU4-R-T02_01 |
70 |
61 - 66 |
10 - 11 |
61 – 66 |
- |
- |
|
P-PU4-R-T03_01 to P-PU4-R-T03_02 |
70 |
62 - 70 |
0 |
62 – 70 |
- |
- |
|
P-PU4-R-T04_01 |
70 |
63 - 66 |
0 |
63 – 66 |
- |
- |
P-PU5 |
P-PU5-R-T01_01 to P-PU5-R-T01_02 |
70 |
62 - 70 |
0 |
62 – 70 |
- |
- |
|
P-PU5-R-T02_01 to P-PU5-R-T02_02 |
70 |
63 - 68 |
0 |
63 – 68 |
- |
- |
|
P-PU5-R-T03_01 to P-PU5-R-T03_02 |
70 |
62 - 70 |
0 |
62 – 70 |
- |
- |
|
P-PU5-R-T04_01 to P-PU5-R-T04_02 |
70 |
64 - 68 |
0 |
64 – 68 |
- |
- |
P-PU6 |
P-PU6-R-T01_01 to P-PU6-R-T01_02 |
70 |
62 - 69 |
0 |
62 – 69 |
- |
- |
|
P-PU6-R-T02_01 to P-PU6-R-T02_02 |
70 |
64 - 67 |
0 |
64 – 67 |
- |
- |
|
P-PU6-R-T03_01 |
70 |
62 - 70 |
0 |
62 – 70 |
- |
- |
|
P-PU6-R-T04_01 |
70 |
60 - 64 |
0 |
60 – 64 |
- |
- |
|
P-PU6-R-T05_01 to P-PU6-R-T05_02 |
70 |
61 - 70 |
0 |
61 – 70 |
- |
- |
|
P-PU6-R-T06_01 to P-PU6-R-T06_02 |
70 |
60 - 66 |
0 |
60 – 66 |
- |
- |
P-PR1 |
P-PR1-R-T01_01 to P-PR1-R-T03_01 |
70 |
63 - 68 |
0 |
63 – 68 |
- |
- |
P-PR2 |
P-PR2-R-T01_01 to P-PR2-R-T03_01 |
70 |
62 - 69 |
0 |
62 – 69 |
- |
- |
P-PR3 |
P-PR3-R-T01_01 to P-PR3-R-T02_02 |
70 |
56 - 66 |
0 |
56 – 66 |
- |
- |
P-PR4 |
P-PR3-R-T01_01 to P-PR3-R-T03_01 |
70 |
64 - 69 |
0 |
64 – 69 |
- |
- |
P-PR5 |
P-PR5-R-T01_01 to P-PR5-R-T04_02 |
70 |
59 - 66 |
0 |
59 – 66 |
- |
- |
P-E1 |
P-E1-E-T01_01 |
65 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
P-E1-E-T01_02 |
N/A (1/F – 5/F) |
N/A (1/F – 5/F) |
N/A (1/F – 5/F) |
1/F – 5/F |
Noise Insulation with suitable window type and air-conditioning |
||
65 – 65 (6/F
– 8/F) |
18 – 18 (6/F
– 8/F) |
65 -65 (6/F –
8/F) |
- |
||||
P-E1-E-T01_03 |
60 -61 |
16 - 16 |
60 -61 |
- |
- |
||
P-E1-E-T01_04 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
||
P-E2 |
P-E2-E-T01_01 |
65 |
62 – 62 |
11 -11 |
62 – 62 |
- |
- |
P-E2-E-T01_02 to P-E2-E-T01_03 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
||
P-E3 |
P-E3-E-T01_01 to P-E3-E-T01_02 |
65 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
P-E4 |
P-E4-E-T01_01 |
65 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
P-E5 |
P-E5-E-T01_01 to P-E5-E-T01_03 |
65 |
N/A |
N/A |
N/A |
1/F – 8/F |
Noise Insulation with suitable window type and air-conditioning |
[1] The assessment only includes
NSRs which rely on opened windows for ventilation.
[2] Noise levels would be
rounded up to nearest integer to determine the compliance of the criteria. “N/A” indicates noise criteria do not apply to
the NSR due to the use of noise insulation with suitable window type and
air-conditioning
[3] In general, adoption of
acoustic window can reduce 5 dB(A) road traffic noise level.
Table 4.27 Estimated
Number of Residential Dwellings / Classrooms Benefited and Protected by
Mitigation Measures
NSR Type |
No. of Dwellings /
Classrooms |
||||||
Exposed to Exceedance [1] |
Benefited [2] |
Protected [3] |
|||||
Unmitigated |
Mitigated by Direct
Mitigation Measures [4] |
Mitigated by Optimised
Mitigation Measures [5] |
Mitigated by Direct
Mitigation Measures [4] |
Mitigated by Optimised Mitigation
Measures [5] |
Mitigated by Direct
Mitigation Measures [4] |
Mitigated by Optimised
Mitigation Measures [5] |
|
Residential |
203 |
0 |
0 |
203 |
203 |
203 |
203 |
School |
130 |
125 [4] |
0 [6] |
112 [4] |
130 [6] |
5 [4] |
130 [6] |
[3] The
dwellings or classroom would be considered as “protected” if (a) the predicted noise
level at the dwellings or classroom exceeded the criteria under unmitigated
scenario and (b) the predicted noise level at the dwellings or classroom
complied with the noise criteria as a result of the applied mitigated measures.
[4] With implementation of Low
Noise Road Surfacing and acoustic windows/blank wall.
[5] With implementation of mitigation
measures listed in Table 4.25.
[6] As mentioned in Section 4.8.4.9 above, with the
implementation of the recommended noise insulation with suitable window type
and air-conditioning, the concerned premises would be no longer subjected to
road traffic noise impact.
[1]
https://www.wsd.gov.hk/en/tenders-contracts-and-consultancies/consultancies/award-consultancies/index.html