TABLE OF CONTENTS

EXECUTIVE SUMMARY

1.         INTRODUCTION

Background

Scope of Report

Project Organization

Summary of Construction Works

Summary of EM&A Programme Requirements

2.         AIR QUALITY

Monitoring Requirements

Monitoring Equipment

Monitoring Parameters, Frequency and Duration

Monitoring Locations

Monitoring Methodology

Monitoring Results

3.         NOISE MONITORING

Monitoring Requirements

Monitoring Equipment

Monitoring Locations

Monitoring Parameters

Monitoring Methodology

Monitoring Results

4.         VEGETATION MONITORING

Monitoring Requirement

Monitoring Location

Monitoring Methodology

Monitoring Results

5.         LANDSCAPE AND VISUAL

Monitoring Requirement

Summary of the Landscape and Visual Monitoring on 8 April 2008

Summary of the Landscape and Visual Monitoring on 22 April 2008

Next Landscape and Visual Audit Schedule

6.         ENVIRONMENTAL SITE INSPECTION AND AUDIT

Site Inspection

Assessment of Environmental Monitoring Results

Advice on the Solid and Liquid Waste Management Status

Environmental Licenses and Permits

Implementation Status of Environmental Mitigation Measures

Summary of Exceedances of the Environmental Quality Performance Limit

Summary of Complaints, Notification of Summons and Successful Prosecutions

7.         FUTURE KEY ISSUES

Construction Programme for the Coming Months

Key Issues for Coming Month

Monitoring Schedule for the Coming Months

8.         CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations

 

List of Tables

 

Table 1.1           Contact Information of Key Personnel

Table 2.1           Air Quality Monitoring Equipment

Table 2.2           Air Quality Monitoring Parameters, Frequency and Duration

Table 2.3           Locations of Air Quality Monitoring Stations

Table 2.4           Summary of 1-hour TSP Monitoring Results During Reporting Period

Table 2.5           Summary of 24-hour TSP Monitoring Results During Reporting Period

Table 3.1           Noise Monitoring Equipment

Table 3.2           Locations of Noise Monitoring Stations

Table 3.3           Summary of Noise Monitoring Results in the Reporting Period

Table 6.1           Summary of Environmental Licensing and Permit Status

 

List of Figures

 

Figure 1.1          Site Layout Plan

Figure 2.1          Locations of Air Quality and Noise Monitoring Stations

Figure 6.1          Environmental Complaint Handling Procedures    

 

 

 

List of Appendices

 

Appendix A        Project Organization Structure

Appendix B       Construction Programme

Appendix C       Implementation Schedule of Mitigation Measures (EMIS)

Appendix D       Action and Limit Levels for Air Quality  and Noise

Appendix E       Calibration Certificates

Appendix F        Air Quality Monitoring Results and Graphical Presentation

Appendix G       Event Action Plan

Appendix H       Weather Data

Appendix I         Noise Monitoring Results and Graphical Presentation

Appendix J        Detailed Landscape and Visual Monitoring Report

Appendix K       ET’s Site Inspection Summaries

Appendix L        Monitoring Schedules