TABLE OF CONTENTS
Background
Scope of Report
Project
Organization
Summary of
Construction Works
Summary of
EM&A Programme Requirements
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Parameters, Frequency and Duration
Monitoring
Locations
Monitoring
Methodology
Monitoring
Results
Monitoring
Requirements
Monitoring
Equipment
Monitoring
Locations
Monitoring
Parameters
Monitoring
Methodology
Monitoring
Results
Monitoring
Requirement
Monitoring
Location
Monitoring
Methodology
Monitoring
Results
Monitoring
Requirement
Summary of
the Landscape and Visual Monitoring on 8 April 2008
Summary of
the Landscape and Visual Monitoring on 22 April 2008
Next
Landscape and Visual Audit Schedule
6. ENVIRONMENTAL SITE INSPECTION AND AUDIT
Site
Inspection
Assessment
of Environmental Monitoring Results
Advice on
the Solid and Liquid Waste Management Status
Environmental
Licenses and Permits
Implementation
Status of Environmental Mitigation Measures
Summary of
Exceedances of the Environmental Quality Performance Limit
Summary of
Complaints, Notification of Summons and Successful Prosecutions
Construction
Programme for the Coming Months
Key Issues
for Coming Month
Monitoring
Schedule for the Coming Months
8. CONCLUSIONS AND RECOMMENDATIONS
Conclusions
Recommendations
List
of Tables
Table
1.1 Contact
Information of Key Personnel
Table 2.1 Air Quality Monitoring Equipment
Table 2.2 Air Quality Monitoring
Parameters, Frequency and Duration
Table 2.3 Locations of Air Quality
Monitoring Stations
Table 2.4 Summary of 1-hour TSP
Monitoring Results During Reporting Period
Table 2.5 Summary of 24-hour TSP Monitoring
Results During Reporting Period
Table 3.1 Noise Monitoring Equipment
Table 3.2 Locations of Noise
Monitoring Stations
Table 3.3 Summary of Noise Monitoring
Results in the Reporting Period
Table 6.1 Summary of Environmental Licensing and Permit Status
List of Figures
Figure 2.1 Locations of Air Quality and Noise Monitoring
Stations
Figure 6.1 Environmental Complaint Handling
Procedures
List of Appendices
Appendix A Project Organization Structure
Appendix B Construction Programme
Appendix C Implementation
Schedule of Mitigation Measures (EMIS)
Appendix D Action and Limit Levels for Air Quality and Noise
Appendix E Calibration Certificates
Appendix F Air Quality Monitoring Results and
Graphical Presentation
Appendix I Noise Monitoring
Results and Graphical Presentation
Appendix J Detailed Landscape and Visual Monitoring Report
Appendix K ET’s
Site Inspection Summaries
Appendix L Monitoring Schedules