TABLE OF CONTENTS
1. INTRODUCTION
Project Description
Purpose of the Manual
Project Organisation
2. NOISE
Introduction
Methodology and Criteria
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Monitoring Requirement
Mitigation Measures
4. ECOLOGY
Terrestrial Ecology
Marine Ecology
Introduction
Mitigation Measures
Introduction
Land Contamination
Assessment
Mitigation Measures
during Construction Stage
Mitigation Measures for
Remediation Process
7. AIR QUALITY
Introduction
Methodology and Criteria
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Compliance Assessment
Event and Action Plan
Mitigation Measures
Introduction
Site Inspection
Mitigation Measures
9. SEWERAGE AND SEWAGE TREATMENT
Introduction
Monitoring Requirement
Recommendation
Introduction
Mitigation Measures
before the Construction Phase
Mitigation Measures
during Construction Phase
11. HAZARD TO LIFE
Introduction
Mitigation Measures
Site Inspection
Site Inspections
Compliance with Legal and
Contractual Requirements
Environmental Complaints
13. REPORTING
General
Electronic Reporting
Baseline Monitoring
Report
Monthly EM&A Reports
Quarterly EM&A
Summary Reports
Final EM&A Review
Report
Operational Phase
EM&A Report
Data Keeping
Interim Notifications of
Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Acceptable
Noise Levels (ANLs)
Table 2.2 Noise
Monitoring Stations during Construction Phase
Table 2.3 Noise
Monitoring Stations during Operational Phase
Table 2.4 Action
and Limit Levels for Construction Noise
Table 2.5 Action
and Limit Levels for Entertainment Noise
Table 2.6 Event
/ Action Plan for Construction Noise
Table 2.7 Event
/ Action Plan for Entertainment Noise
Table 4.1 Action
and Limit Level for Coral Monitoring
Table 4.2 Action
and Limit Level Exceedance Procedure for Coral Monitoring
Table 7.1 Air
Monitoring Stations during Construction Phase
Table 7.2 Impact
Monitoring Programme (TSP)
Table 7.3 Proposed
Action and Limit Levels for Impact Monitoring
Table 7.4 Event
/ Action Plan for Air Quality
List of Figures
Figure 1.1 Location
of the Project Site
Figure 1.2 Project
Organisation
Figure 2.1 Locations
of Representative Noise Sensitive Receivers
Figure 2.2 Proposed
Construction Noise Monitoring Station
Figure 2.3 Proposed
Operational Noise Monitoring Station
Figure 4.1 Locations
of Proposed Coral Impact Monitoring Station
Figure 7.1 Proposed
Air Monitoring Station
Figure 10.1Area Proposed for Archaeological
Survey
Figure 12.1Environmental Complaint Flow
Diagram
Appendices
Appendix A Preliminary
Construction Programme
Appendix B Implementation
Schedule of Mitigation Measures
Appendix C Sample Data
Sheets for Air, Noise and Water Quality Monitoring
Appendix D Sample
Template for the Interim Notification