TABLE OF CONTENTS

 

1.     INTRODUCTION       

Project Description    

Purpose of the Manual       

Project Organisation  

2.     NOISE     

Introduction      

Methodology and Criteria   

Monitoring Equipment

Monitoring Locations 

Baseline Monitoring   

Impact Monitoring     

Event and Action Plan       

Mitigation Measures  

3.     LANDSCAPE AND VISUAL       

Introduction      

Monitoring Requirement     

Mitigation Measures  

4.     ECOLOGY       

Terrestrial Ecology    

Marine Ecology 

5.     WASTE MANAGEMENT    

Introduction      

Mitigation Measures  

6.     LAND CONTAMINATION   

Introduction      

Land Contamination Assessment       

Mitigation Measures during Construction Stage    

Mitigation Measures for Remediation Process     

7.     AIR QUALITY   

Introduction      

Methodology and Criteria   

Monitoring Equipment

Monitoring Locations 

Baseline Monitoring   

Impact Monitoring     

Compliance Assessment   

Event and Action Plan       

Mitigation Measures  

8.     WATER QUALITY     

Introduction      

Site Inspection  

Mitigation Measures  

9.     SEWERAGE AND SEWAGE TREATMENT  

Introduction      

Monitoring Requirement     

Recommendation      

10.    CULTURAL HERITAGE     

Introduction      

Mitigation Measures before the Construction Phase     

Mitigation Measures during Construction Phase   

11.    HAZARD TO LIFE     

Introduction      

Mitigation Measures  

Site Inspection  

12.    ENVIRONMENTAL AUDITING   

Site Inspections

Compliance with Legal and Contractual Requirements  

Environmental Complaints  

13.    REPORTING    

General    

Electronic Reporting  

Baseline Monitoring Report

Monthly EM&A Reports     

Quarterly EM&A Summary Reports    

Final EM&A Review Report

Operational Phase EM&A Report

Data Keeping    

Interim Notifications of Environmental Quality Limit Exceedances  

 

List of Tables

 

Table 2.1   Acceptable Noise Levels (ANLs) 

Table 2.2   Noise Monitoring Stations during Construction Phase   

Table 2.3   Noise Monitoring Stations during Operational Phase     

Table 2.4   Action and Limit Levels for Construction Noise     

Table 2.5   Action and Limit Levels for Entertainment Noise   

Table 2.6   Event / Action Plan for Construction Noise   

Table 2.7   Event / Action Plan for Entertainment Noise 

Table 4.1   Action and Limit Level for Coral Monitoring  

Table 4.2   Action and Limit Level Exceedance Procedure for Coral Monitoring

Table 7.1   Air Monitoring Stations during Construction Phase       

Table 7.2   Impact Monitoring Programme (TSP)  

Table 7.3   Proposed Action and Limit Levels for Impact Monitoring

Table 7.4   Event / Action Plan for Air Quality       

 

List of Figures

 

Figure 1.1  Location of the Project Site

Figure 1.2  Project Organisation

Figure 2.1  Locations of Representative Noise Sensitive Receivers

Figure 2.2  Proposed Construction Noise Monitoring Station

Figure 2.3  Proposed Operational Noise Monitoring Station

Figure 4.1  Locations of Proposed Coral Impact Monitoring Station

Figure 7.1  Proposed Air Monitoring Station

Figure 10.1Area Proposed for Archaeological Survey

Figure 12.1Environmental Complaint Flow Diagram

 


Appendices

 

Appendix A        Preliminary Construction Programme

Appendix B       Implementation Schedule of Mitigation Measures

Appendix C       Sample Data Sheets for Air, Noise and Water Quality Monitoring

Appendix D       Sample Template for the Interim Notification