TABLE
OF CONTENTS
Project Description
Purpose of the Manual
Project Organisation
Structure of the EM&A Manual
Introduction
Mitigation Measures
Monitoring Requirement
Audit Requirements
Introduction
Construction Noise
Operational Noise – Fixed Plant
Operational Noise – Railway Operation
Mitigation Measures
Introduction
Methodology and Criteria
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Mitigation Measures
Introduction
Mitigation Measures
Audit Requirements
Introduction
Mitigation Measures
Audit Requirements
7. WASTE MANAGEMENT
IMPLiCATIONS
Introduction
Mitigation Measures
Audit Requirements
Mitigation Measures
Audit Requirements
Monitoring
Parameters and Equipment
Proposed Dust
Monitoring Stations
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Monitoring
Parameters, Locations and Frequency
Compliance
with Legal and Contractual Requirements
Baseline Monitoring Report
Monthly EM&A Reports
First Monthly EM&A Report
Subsequent Monthly EM&A Reports
Final EM&A Review Report
Data Keeping
Interim Notifications of
Environmental Quality Limit Exceedances
List of Tables
Table 2.1 Requirement
of Construction Impact Monitoring for Avifaunal Group
Table 3.1 Acceptable
Noise Levels (ANLs)
Table 3.2 Noise
Monitoring Stations during Construction Phase
Table 3.3 Action
and Limit Levels for Construction Noise
Table 3.4 Event
and Action Plan for Construction Noise Monitoring
Table 3.5 Operational
Airborne Railway Noise Criteria
Table 3.6 Noise
Monitoring Stations during Operation Phase
Table 4.1 Ground-borne
Construction Noise Criteria
Table 4.2 Construction
Ground-borne Noise Monitoring Locations
Table 4.3 Proposed TBM Operating Time
Table 9.1 Proposed
Dust Monitoring Locations
Table 9.2 Summary
of Dust Monitoring Programme
Table 9.3 Proposed
Action and Limit Levels for Impact Monitoring
Table 9.4 Event
and Action Plan for Construction Dust Monitoring
Table 9.5 Concrete
Batching Plant – Dust Emission Design Control Measures
Table 9.6 Cut
and Cover Areas and Stockpiles – Dust Emission Design Control Measures
Table 9.7 Barging
Facilities – Dust Emission Design Control Measures
Table 11.1 Parameters,
Locations and Frequency of Landfill Gas Monitoring
Table 11.2 Actions in
the Event of Gas Being Detected
List of Figures
Overall View of Alignment |
|
Ground
Level Works Area |
|
Project
Organisation |
|
Locations Plan of Noise Monitoring Stations |
|
Locations of Noise Monitoring Stations (Construction
Phase) |
|
Locations of Noise Monitoring Stations (Operation Phase) |
|
Locations Plan of Groundborne Noise Monitoring Stations |
|
Locations of Groundborne Noise Monitoring Stations |
|
Locations Plan of Dust Monitoring Stations |
|
Locations of Dust Monitoring Stations |
List of Appendices
Project
Implementation Schedule |
|
Sample
Data Record Sheets |
|
Monitoring
of Contaminated Groundwater |
|
Complaint
Handling Procedure |
|
Sample of the Interim of Notification |