Works Division
Agreement
No. CE 76/2017 (HY)
Upgrading of Remaining Sections of Kam Tin and Lam Kam Road
Environmental Impact Assessment Report
(EIA
Study Brief No. ESB-310/2018)
Volume 1 of
3
Document No. P1062/004
Issue 2
Jan 2020
In association with ANewR
Consulting Limited
|
P1062/004 Issue 2 Jan
2020 |
||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||
Agreement No. CE 76/2017 (HY) Upgrading of Remaining
Sections of Kam Tin and Lam Kam Road Environmental Impact Assessment Report (EIA
Study Brief No. ESB-310/2018) |
|||||||||||||||||||||||||||||||||||||||||
|
1.1 Project Background
1.2
Propose of the EIA Study
1.3
Objects of the EIA Study
1.4
Report Structure
2.0....... PROJECT DESCRIPTION
2.1 Project Objectives
2.2
Project Location and Site History
2.3
Need of Project
2.4
Project Scope and Design
2.5 Encroachment of the Conservation Areas and Works adjacent to the Existing
Watercourses
2.6
Consideration of Alternative Options
2.7
Construction Method and Sequence
2.8
Construction Programme
2.9
Summary of Environmental Designs
Recommended and Environmentally Friendly Options
Considered
2.10 Collating and Addressing Public Views
2.11 Concurrent Projects
2.12 Operation Traffic Forecast
2.13 Cultural Heritage Implications
3.0....... AIR IMPACT ASSESSMENT
3.1 Introduction
3.2
Environmental Legislation, Standards and
Guidelines
3.3
Description of the Environment
3.4
Assessment Area and Air Sensitive
Receivers (ASRs)
3.5
Construction Air Quality Impact Assessment
3.6
Operation Air Quality Impact Assessment
3.7
EM&A Requirements
3.8
Conclusion
4.0....... NOISE IMPACT ASSESSMENT
4.1 Introduction
4.2
Environmental Legislation, Standards and
Guidelines
4.3
Description of the Environment
4.4
Assessment Area and NSRs
4.5
Construction Noise Impact Assessment
4.6
Operation Noise Impact Assessment
4.7
Environmental Monitoring and Audit
4.8
Conclusion
5.0....... WATER QUALITY IMPACT ASSESSMENT
5.1 Introduction
5.2
Environmental Legislation, Standards and
Guidelines
5.3
Description of the Environment
5.4
Assessment Methodologies
5.5
Identification and Evaluation of
Environmental Impacts
5.6
Potential Cumulative Impacts from
Concurrent Project
5.7
Mitigation of Environmental Impacts
5.8
Environmental Monitoring and Audit
5.9
Conclusion
6.0....... WASTE MANAGEMENT IMPLICATION ASSESSMENT
6.1 Introduction
6.2
Environmental Legislation, Standards and
Guidelines
6.3
Description of the Environment
6.4
Assessment Methodologies
6.5
Identification of Potential Impacts
6.6
Mitigation of Adverse Environmental
Impacts
6.7
Evaluation of Residual Impacts
6.8
Environmental Monitoring and Audit
6.9
Conclusion
7.0....... ECOLOGICAL IMPACT ASSESSMENT
7.1
Requirements of EIA Study Brief
7.2
Project Boundary and Assessment Area
7.3
Legislation, Standards and Guidelines
7.4
Ecological Baseline Information
7.5
Ecological Baseline Condition
7.6
Evaluation of Habitats and Species of
Conservation Importance
7.7
Impact Identification and Evaluation
7.8
Mitigation Measures
7.9
Potential Cumulative Impacts
7.10 Residual Impacts
7.11 Environmental Monitoring and Audit
7.12
Conclusion
8.0..... LAND
CONTAMINATION ASSESSMENT
8.1
Introduction
8.2
Environmental Legislation, Standards and
Guidelines
8.3
Description of the Environment
8.4
Assessment Methodology
8.5
Site Appraisal
8.6
Identification of Exposure Pathways
8.7
Prediction and Evaluation of Environmental
Impacts
8.8
Recommendations and Mitigation Measures
8.9
Conclusion
9.0..... LANDSCAPE AND
VISUAL IMPACT ASSESSMENT
9.1
Introduction
9.2
Environmental Legislation, Standards,
Guidelines and Criteria
9.3
Assessment Methodology
9.4
Review of Planning and Development Control
Framework
9.5
Baseline Study: Landscape Resources and
Landscape Areas
9.6
Baseline Study: Visual Envelope and
Visually Sensitive Receivers
9.7
Landscape Impact Assessment
9.8
Visual Impact Assessment
9.9
Landscape and Visual Mitigation Measures
9.10 Photomontage
9.11 The implementation of Landscape and Visual Mitigation Measures
9.12 Residual Impacts
9.13 Cumulative Impacts
9.14 Conclusion
10.0... ENVIRONMENT
MONITORING AND AUDIT (EM&A) REQUIREMENT
10.1
Project Organisation
10.2
EM&A Manual
10.3
Implementation Schedule
10.4
EM&A Programme
10.5
Summary of EM&A Requirements
11.0... SUMMARY OF
ENVIRONMENTAL OUTCOMES
11.1
Overview
11.2
Population and Environmental Sensitive
Areas Protected
11.3
Summary of Environmental Designs
Recommended, Environmentally Friendly Options
Considered and Incorporated in the Preferred Option
11.4
Key Environmental Problems Avoided
11.5
Environmental Benefits of the Project
11.6
Environmental Benefits of Environmental
Protection Measures Recommended
11.7
Summary of Alternative Measures
12.0... IMPLEMENTATION
SCHEDULE OF RECOMMENDED MITIGATION MEASURES