Application No. |
Environmental Impact Assessment Report |
Applicant |
Status |
EIA-311/2024 |
Reclamation for Kau Yi Chau Artificial Islands |
Civil Engineering and Development Department |
- Applicant was informed on 28 February 2025 of the suitability of the report for public inspection.
|
EIA-295/2023 |
Airport Tung Chung Link Project |
Airport Authority Hong Kong |
- Applicant was informed on 21 Aug 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 31 Aug 2023 to 29 Sep 2023.
Approved with conditions on 26 Oct 2023.
|
EIA-294/2023 |
Drainage Improvement Works in Mui Wo |
Drainage Services Department |
- Applicant was informed on 13 Jun 2023 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Jun 2023 to 29 Jul 2023.
Approved without conditions on 22 Aug 2023.
|
EIA-291/2022 |
Establishment of Fish Culture Zone at Po Toi (Southeast) |
Agriculture, Fisheries and Conservation Department |
- Applicant was informed on 16 Nov 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2022 to 28 Dec 2022.
Approved with conditions on 31 Mar 2023. |
EIA-284/2022 |
New Contaminated Sediment Disposal Facility to the West of Lamma Island |
Civil Engineering and Development Department |
- Applicant was informed on 27 Jul 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Aug 2022 to 24 Sep 2022.
Approved without conditions on 21 Oct 2022. |
EIA-277/2021 |
Tung Chung Line Extension |
MTR Corporation Limited |
- Applicant was informed on 24 Jan 2022 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Feb 2022 to 11 Mar 2022 and 23 Mar 2022 to 1 Apr 2022.
Approved with conditions on 12 Jul 2022. |
EIA-276/2021 |
Re-provision of Open Cycle Gas Turbines at Lamma Power Station |
The Hong Kong Electric Company Limited |
- Applicant was informed on 10 Dec 2021 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Dec 2021 to 19 Jan 2022.
Approved without conditions on 1 Apr 2022. |
EIA-257/2018 |
Intermodal Transfer Terminal - Bonded Vehicular Bridge and Associated Roads |
Airport Authority Hong Kong |
- Applicant was informed on 9 July 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 13 Jul 2018 to 11 Aug 2018.
Approved without conditions on 23 August 2018. |
EIA-256/2018 |
Hong Kong Offshore LNG Terminal |
CLP Power Hong Kong Limited |
- Applicant was informed on 13 Jun 2018 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 15 Jun 2018 to 14 Jul 2018.
Approved with conditions on 5 Oct 2018. |
EIA-253/2017 |
Siu Ho Wan Station and Siu Ho Wan Depot Replanning Works |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017. |
EIA-252/2017 |
Proposed Comprehensive Residential and Commercial Development atop Siu Ho Wan Depot |
MTR Corporation Limited |
- Applicant was informed on 10 Jul 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Jul 2017 to 12 Aug 2017.
Approved with conditions on 29 Nov 2017. |
EIA-251/2017 |
Improvement Dredging for Lamma Power Station Navigation Channel |
The Hong Kong Electric Company Limited |
- Applicant was informed on 24 May 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 9 Jun 2017 to 8 Jul 2017.
Approved with conditions on 10 Oct 2017. |
EIA-250/2017 |
Mui Wo Lai Chi Yuen Cemetery Extension |
Food and Environmental Hygiene Department |
- Applicant was informed on 24 Mar 2017 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Apr 2017 to 17 May 2017.
Approved without conditions on 15 Jun 2017. |
EIA-246/2016 |
Outlying Islands Sewerage Stage 2 - South Lantau Sewerage Works |
Drainage Services Department |
- Applicant was informed on
25 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Nov 2016 to 17 Dec 2016.
- Approved with condition on 24 Apr 2017. |
EIA-243/2016 |
Outlying Islands Sewerage Stage 2 - Upgrading of Tai O Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
- Applicant was informed on 19 Aug 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Nov 2016 to 28 Dec 2016.
- Approved with condition on 29 Mar 2017. |
EIA-238/2016 |
New Wang Tong River Bridge |
Highways Department |
- Applicant was informed on 15 Jul 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 3 Aug 2016 to 1 Sep 2016. Approved without conditions on 23 Sep 2016.
|
EIA-237/2016 |
Additional Gas-fired Generation Units Project |
Castle Peak Power Company Limited |
- Applicant was informed on 13 Apr 2016 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Apr 2016 to 19 May 2016. - Approved without condition on 7 Jun 2016.
|
EIA-233/2015 |
Tung Chung New Town Extension |
Civil Engineering and Development Department |
- Applicant was informed on 1 Dec 2015 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 4 Dec 2015 to 2 Jan 2016. - Approved with condition on 8 Apr 2016.
|
EIA-223/2014 |
Expansion of Hong Kong International Airport into a Three-Runway System |
Airport Authority Hong Kong |
- Applicant was informed on 12 Jun 2014 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 20 Jun 2014 to 19 Jul 2014. - Approved on 7 Nov 2014.
|
EIA-219/2013 |
Outlying Island Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
- Applicant was informed on 9 Oct 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Oct 2013 to 28 Nov 2013.
- Approved without conditions on 12 Dec 2013.
|
EIA-211/2013 |
Outlying Islands Sewerage Stage 2 - Upgrading of Cheung Chau Sewage Collection, Treatment and Disposal Facilities |
Drainage Services Department |
- Application was withdrawn by applicant on 26 Apr 2013.
|
EIA-206/2012 |
Drainage Improvement Works at Ngong Ping |
Drainage Services Department |
- Applicant was informed on 29 Jan 2013 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 21 Feb 2013 to 22 Mar 2013. - Approved with conditions on 21 Apr 2013.
|
EIA-201/2011 |
Development of the Integrated Waste Management Facilities Phase 1 |
Environmental Protection Department |
- Applicant was informed on 10 Nov 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 18 Nov 2011 to 17 Dec 2011. - Approved with conditions on 17 Jan 2012.
|
EIA-193/2011 |
Development of the Integrated Waste Management Facilities Phase 1 |
Environmental Protection Department |
- Applicant was informed on 9 Feb 2011 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2011 to 18 Mar 2011.
- Application was withdrawn by applicant on 11 May 2011.
|
EIA-186/2010 |
Integration of Siu Ho Wan and Silver Mine Bay Water Treatment Works |
Water Supplies Department |
- Applicant was informed on 24 Nov 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 08 Dec 2010 to 06 Jan 2011.
- Approved without conditions on 13 Jan 2011.
|
EIA-180/2010 |
Improvement of Fresh Water Supply to Cheung Chau |
Water Supplies Department |
- Applicant was informed on 16 March 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 30 Mar 2010 to 28 Apr 2010.
- Approved without conditions on 4 May 2010.
|
EIA-178/2009 |
Black Point Gas Supply Project |
Castle Peak Power Co. Ltd. |
- Applicant was informed on 10 February 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 12 Feb 2010 to 13 Mar 2010. - Approved with conditions on 27 Apr 2010.
|
EIA-177/2009 |
Development of a 100MW Offshore Wind Farm in Hong Kong |
The Hong Kong Electric Co. Ltd. |
- Applicant was informed on 26 January 2010 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 8 Feb 2010 to 9 Mar 2010. - Approved with conditions on 14 May 2010.
|
EIA-174/2009 |
Tuen Mun - Chek Lap Kok Link |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. - Approved with conditions on 23 Oct 2009.
|
EIA-173/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Boundary Crossing Facilities |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. - Approved with conditions on 23 Oct 2009. - The Court of Appeal in the High Court allowed the Director's appeal on 27 Sep 2011.
|
EIA-172/2009 |
Hong Kong - Zhuhai - Macao Bridge Hong Kong Link Road |
Highways Department |
- Applicant was informed on 13 August 2009 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 14 Aug 2009 to 12 Sep 2009. - Approved with conditions on 23 Oct 2009. - The Court of Appeal in the High Court allowed the Director's appeal on 27 Sep 2011.
|
EIA-148/2008 |
Harbour Area Treatment Scheme (HATS) Stage 2A |
Drainage Services Department |
- Applicant was informed on 18 Jun 2008 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 12 Aug 2008 to 10 Sep 2008.
- Approved without conditions on 30 Oct 2008.
|
EIA-126/2006 |
Relocation of Yiu Lian
Floating Dock No. 3 |
Yiu Lian Dockyards Limited
|
- Applicant was informed on 19 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 29 Dec 2006 to 27 Jan 200 7.
- Approved with conditions
on 23 Feb 2007.
|
EIA-125/2006 |
Liquefied Natural Gas (LNG)
Receiving Terminal and Associated Facilities |
Castle Peak Power Company
Limited
|
- Applicant was informed on 15 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 27 Dec 2006 to 25 Jan 200 7.
- Approved with conditions
on 3 Apr 2007.
|
EIA-124/2006 |
A Commercial Scale Wind Turbine Pilot Demonstration at Hei Ling Chau |
Castle Peak Power Company
Limited
|
- Applicant was informed on 1 Dec 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to
comment from 14 Dec 2006 to 12 Jan 200 7.
- Approved with conditions
on 12 Mar 2007.
|
EIA-119/2005 |
Lamma Power Station Units L4 & L5 Flue Gas Desulphurization Plant Retrofit Project |
The Hong Kong Electric Co. Ltd.
|
- Applicant was informed on 13 Feb 2006 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 17 Feb 2006 to 18 Mar 2006.
- Approved without conditions on 24 Mar 2006.
|
EIA-114/2005 |
Helipad at Yung Shue Wan, Lamma Island |
Civil Engineering and Development Department
|
- Applicant was informed on 14 Nov 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 23 Nov 2005 to 22 Dec 2005.
|
EIA-110/2005 |
Drainage Improvements in Southern Lantau |
Drainage Services Department
|
- Applicant was informed on 15 Sep 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 26 Sep 2005 to 25 Oct 2005.
- Approved without conditions on 5 Dec 2005. |
EIA-107/2005 |
Peng Chau Helipad |
Civil Engineering and Development Department
|
- Applicant was informed on 23 June 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 11 July 2005 to 9 August 2005.
- Approved without conditions on 25 Aug 2005. |
EIA-106/2005 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area |
Civil Engineering and Development Department
|
- Applicant was informed on 19 May 2005 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 27 May 2005 to 25 June 2005.
- Approved without conditions on 1 Sep 2005. |
EIA-105/2005 |
Tonggu Channel of Shenzhen Port |
Shenzhen Port Tonggu Channel Development Office
|
-Applicant was informed on 20 May 2005 that the report submitted on 24 March 2005 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-102/2004 |
New Contaminated Mud Marine Disposal Facility at Airport East / East Sha Chau Area |
Civil Engineering and Development Department |
- Application was withdrawn by applicant on 31 Jan 2005. |
EIA-100/2004 |
Siu Ho Wan Water Treatment Works Extension |
Water Supplies Department |
- Applicant was informed on 15 Oct 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Oct 2004 to 23 Nov 2004.
- Approved without conditions on 15 Dec 2004. |
EIA-099/2004 |
Renewable Energy by a Wind Turbine System on Lamma Island |
The Hongkong Electric Co. Ltd. |
- Applicant was informed on 6 Sep 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 10 Sept 2004 to 09 Oct 2004..
- Approved without conditions on 27 Oct 2004. |
EIA-096/2004 |
Peng Chau Sewage Treatment Works Upgrade |
Drainage Services Department |
- Applicant was informed on 24 Aug 2004 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 01 Sept 2004 to 30 Sept 2004.
Approved without conditions on 29 Oct 2004. |
EIA-091/2003 |
Outlying Islands Sewerage Stage 1, Phase II Package J - Sok Kwu Wan Sewage Collection, Treatment & Disposal Facilities |
Drainage Services Department |
- Applicant was informed on 23 Jun 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 22 Aug 2003 to 20 Sep 2003.
- Approved with conditions on 25 Oct 2003. |
EIA-090/2003 |
Tung Chung - Ngong Ping Cable Car Project |
MTR Corporation Limited |
- Applicant was informed on 27 Mar 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 29 Mar 2003 to 27 Apr 2003.
- Approved with conditions on 9 Jun 2003. |
EIA-088/2002 |
Lamma Power Station Navigation Channel Improvement |
The Hongkong Electric Co., Ltd. |
- Applicant was informed on 18 Jan 2003 of the suitability of the report for public inspection.
- Report was exhibited for public to comment from 25 Jan 2003 to 23 Feb 2003.
- Approved without conditions on 11 Mar 2003. |
EIA-084/2002 |
Lamma Power Station Navigation Channel Improvement |
The Hongkong Electric Co., Ltd. |
- Application was withdrawn by applicant on 8 October 2002. |
EIA-080/2002 |
Reclamation of Sai Wan Typhoon Shelter and Associated Engineering Works at Cheung Chau |
Hong Kong Island & Islands Development Office, Territority Development Department |
- Applicant was informed on 25 Sep 2002 of the suitability of the report for public inspection.
- Application was withdrawn by applicant on 20 December 2002.
|
EIA-079/2002 |
Ngong Ping Sewage Treatment Works and Sewerage |
Drainage Services Department |
- Applicant was informed on 29 Aug 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Aug 2002 to 28 Sep 2002.
- Approved without conditions on 12 Nov 2002. |
EIA-075/2002 |
Improvement to Tung Chung Road between Lung Tseng Tau and Cheung Sha |
Highways Department |
- Applicant was informed on 7 May 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 14 May 2002 to 12 Jun 2002.
- Approved with conditions on 4 Jul 2002. |
EIA-072/2001 |
Decommissioning of Cheoy Lee Shipyard at Penny's Bay |
Civil Engineering Department |
- Applicant was informed on 9 Feb 2002 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 21 Feb 2002 to 22 Mar 2002.
- Approved without condition on 24 April 2002. |
EIA-065/2001 |
132 KV Supply Circuit from Pui O via Chi Ma Wan Peninsula via Sea Crossing towards Cheung Chau |
CLP Power Hong Kong Limited |
- Applicant was informed on 14 Dec 2001 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 3 Jan 2002 to 1 Feb 2002.
- Approved with conditions on 28 Feb 2002. |
EIA-050/2000 |
Lantau North-South Road Link between Tai Ho Wan and Mui Wo |
Highways Department |
-Applicant was informed on 13 Nov 2000 that the report submitted on 15 Sep 2000 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-042/2000 |
Tai O Sheltered Boat Anchorage - Environmental & Drainage Impact Assessment - Environmental Impact Assessment |
Civil Engineering Department |
- Applicant was informed on 08 May 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 24 May 2000 to 22 Jun 2000.
- Approved with conditions on 12 Jul 2000. |
EIA-041/2000 |
Construction of an International Theme Park in Penny's Bay of North Lantau together with its Essential Associated Infrastructures - Environmental Impact Assessment |
Civil Engineering Department |
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions
on 28 Apr 2000.
|
EIA-040/2000 |
Northshore Lantau Development Feasibility Study - Environmental Impact Assessment |
Civil Engineering Department |
- EIA Report was received on 01 Mar 2000.
- Applicant was informed on 11 Mar 2000 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 13 Mar 2000 to 11 Apr 2000.
- The ACE EIA sub-committee and ACE were consulted on 5 Apr, 10 Apr and 17 Apr 2000.
- Approved with conditions
on 28 Apr 2000.
|
EIA-035/1999 |
Lantau North-South Road Link between Tai Ho Wan and Mui Wo |
Highways Department |
-Applicant was informed on 22 Dec 1999 that the report submitted on 2 Nov 1999 did not meet the requirements of the EIA Study Brief and the TM (reasons). Any re-submission can be made under section 6 of the EIA Ordinance. |
EIA-033/1999 |
Route 10 North Lantau to Yuen Long Highway Investigation and Preliminary Design (Southern Section) |
Highways Departments |
- Applicant was informed on 23 Nov 1999 of the suitability of the report for public inspection.
- Report was exhibited for the public to comment from 30 Nov 1999 to 29 Dec 1999.
- Approved with conditions on 02 Feb 2000. |
EIA-009/1998 |
1,800 MW Gas-fired Power Station at Lamma Extension |
The Hongkong Electric Co., Ltd. |
- EIA report was received on 23 Dec 1998.
- Applicant was informed on 19 Feb 1999 of the suitability of the report for public Inspection.
- Report was exhibited for the public to comment from 05 Mar 1999 to 03 Apr 1999.
- Approved with conditions on 05 May 1999.
|