TABLE OF CONTENTS
A) Introduction
B) Environmental Monitoring Works
C) Environmental Licensing and Permitting
D) Complaints and Prosecutions
E) Future Key Issues
Background
Project Organizations
Construction Programme
Summary of EM&A Requirements
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Results and Observations
Monitoring Requirements
Monitoring Locations
Monitoring Equipment
Monitoring Parameters, Frequency and Duration
Monitoring Methodology and QA/QC Procedures
Maintenance and Calibration
Results and Observations
Monitoring Requirements
Monitoring Equipment
Monitoring Parameters, Frequencies and Durations
Monitoring Locations
Monitoring Methodology, Calibration Details and QA/QC Procedures
Results and Observations
Site Audits
Review of Environmental Monitoring Procedures
Status of Environmental Licensing and Permitting
Status of Waste Management
Implementation Status of Weekly Site Audit and Mitigation Measures
Summary of Exceedances of the Environmental Quality Performance Limit
Implementation Status of Event Action Plans
Summary of Complaints and Prosecutions
Environmental Meeting
Key Issues for the Coming Month
Monitoring Schedule for the Next Month
7. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
LIST OF TABLES
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air Quality Monitoring Station
Table 2.2 Air Quality Monitoring Equipment
Table 2.3 Impact Dust Monitoring Parameters, Frequency and Duration
Table 3.1 Noise Monitoring Stations
Table 3.2 Noise Monitoring Equipment
Table 3.3 Noise Monitoring Parameters, Frequency and Duration
Table 4.1 Water Quality Monitoring Equipment
Table 4.2 Water Quality Monitoring Parameters and Frequency
Table 4.3 Location for Impact Water Quality Monitoring Stations
Table 5.1 Summary of Environmental Licensing and Permit Status
LIST OF FIGURES
Figure 1.2 Project Organization Chart
Figure 2.1 Impact Air Quality Monitoring Locations
Figure 3.1 Impact Noise Monitoring Locations
Figure 4.1 Impact Water Quality Monitoring Locations
LIST OF APPENDICES
A Action and Limit Levels for Air Quality and Noise and Compliance Levels for Water Quality
B Copies of Renewed Calibration Certificates for the Reporting Month
C Environmental Monitoring Schedules
D 1-hour TSP Monitoring Results and Graphical Presentations
E 24-hour TSP Monitoring Results and Graphical Presentations
F Noise Monitoring Results and Graphical Presentations
H Water Monitoring Results and Graphical Presentations
L Not used
N Extracted Minutes for Environmental Meetings
ABBREVIATION AND ACRONYM
DSD Drainage Services Department
E / ER Engineer/Engineer’s Representative
EIA Environmental Impact Assessment
EM&A Environmental Monitoring and Audit
EMIS Environmental Mitigation Implementation Schedule
EP Environmental Permit
FEP Further Environmental Permit
EPD Environmental Protection Department
ET Environmental Team
HVS High Volume Sampler
IEC Independent Environmental Checker
RH Relative Humidity
TSP Total Suspended Particulates
QA/QC Quality Assurance / Quality Control
SLM Sound Level Meter
WMP Waste Management Plan