Table of contents
Environmental
Monitoring Works1
Key
Information in the Reporting Month2
Environmental
License and Permits2
Construction
Activities undertaken during the Reporting Month5
Monitoring
Parameters and Frequency10
Monitoring Methodology and QA/QC
Procedures10
5 Comparison of em&a Results with eia predictions. 13
7 LANDSCAPE AND VISUAL IMPACT14
Review of
Environmental Monitoring Procedures15
Statues of
Environmental Licensing and Permitting15
Implementation
Status of Environmental Mitigation Measures17
Implementation
Status of Event and Action Plans19
Summary of
Complaint, Warning, Notification of any Summons and Successful Prosecution. 19
Monitoring
Schedule for the Next Month21
10 CONCLUSIONS AND
RECOMMENDATIONS22
lIST OF TABLES
Table I Non-compliance Record for the Project in the Reporting Month
Table II Summary Table for Key Information in the Reporting Month
Table 1.1 Key Project Contacts
Table 1.2 Construction Programme Showing the Inter-Relationship with Environmental Protection/Mitigation Measures
Table 4.1 Noise Monitoring Stations
Table 4.2 Noise Monitoring Equipment
Table 4.3 Frequency and Parameters of Noise Monitoring
Table 4.4 Other Noise Sources Identified Which Might Affect the Noise Monitoring Results
Table 4.5 Baseline Noise Level and Noise Limit Level for Monitoring Stations
Table 5.1 Comparison of Noise Monitoring Data with predictions in EIA Report and ERR
Table 8.1 Summary of Environmental Licensing and Permit Status
Table 8.2 Observations and Recommendations of Site Audit
lIST
OF FIGUREs
Figure 1a-1h Layout Plan of the Project Site
Figure 2 Locations
of Construction Noise Monitoring Stations
lIST
OF APPENDIces
B
Action and Limit Levels for Noise
C
Copies of Calibration Certificates
D
Environmental Monitoring Schedules
E
Noise Monitoring Results and Graphical
Presentations
I
Environmental Mitigation Implementation
Schedule (EMIS)
J
Summaries
of Environmental Complaint, Warning, Summon and Notification of Successful Prosecution