CONTENTS

 

                                                                                                                                        Page

 

            List of Abbreviation                                                                                             abb-1

 

1.                  INTRODUCTION                                                                                               1-1

1.1       Background                                                                                              1-1 

1.2       Location and Description of the Project                                                     1-1

1.3       Requirements under the Environmental Impact Assessment

            Ordinance                                                                                                 1-2

1.4       Purpose and Objective of the Environmental Impact Assessment (EIA)

            Study                                                                                                        1-2

1.5       Approach of the EIA Study                                                                       1-4

1.6       Structure of the EIA Report                                                                       1-4

 

 

2.                  PROJECT DESCRIPTION                                                                                  2-1

2.1       Background                                                                                              2-1

2.2       Location and Description of the Project                                                     2-1

2.3       Consideration of the Merit of the Proposed Project for Flood                     2-6

            Alleviation

2.4       Consideration of Alternatives Means and Avoidance of Environmental       2-10

            Impacts

2.5       Design Considerations                                                                              2-13

2.6       Consideration of Alternative Drainage Design                                            2-14

2.7       Ancillary Infrastructure                                                                              2-34

2.8       Construction Related Aspects                                                                   2-34

2.9       Consideration of Alternative Construction Methods                                   2-36

2.10     Justification of the Final Channel Design Recommendation                         2-39

2.11     Project Interfaces / Concurrent Projects                                                    2-39

2.12     Scope of Works during Operational Phase                                                2-40

2.13     Maintenance Responsibilities                                                                     2-41

2.14     Continuous Public Involvement                                                                 2-42

 

 

 

 

 


 

 

3.                  AIR QUALITY IMPACT ASSESSMENT                                                          3-1

3.1       Introduction                                                                                               3-1

3.2       Air Quality Assessment Criteria                                                                 3-1

3.3       Air Sensitive Receivers                                                                              3-2

3.4       Baseline Air Quality                                                                                   3-3

3.5       Air Quality Impact Assessment                                                                  3-4

3.6       Mitigation Measures                                                                                  3-6

3.7       Concurrent Construction Activities                                                             3-8

3.8       Monitoring and Audit Requirements                                                           3-9

3.9       Summary                                                                                                  3-10

 

4.                  CONSTRUCTION NOISE IMPACT ASSESSMENT                                       4-1

4.1       Introduction                                                                                               4-1

4.2       Study Area                                                                                                4-1

4.3       Construction Noise Criteria                                                                       4-2

4.4       Representative Noise Sensitive Receivers                                                   4-3

4.5       Construction Noise Impact Assessment                                                     4-5

4.6       Mitigation Measures                                                                                  4-9

4.7       Residual Impact                                                                                        4-17

4.8       Cumulative Impact                                                                                    4-17

4.9       Summary of Mitigation Measures                                                              4-20

4.10     Monitoring and Audit Requirements                                                          4-22

4.11     Operational Noise                                                                                    4-23

4.12     Summary                                                                                                  4-23

 

5.                  WATER QUALITY IMPACT ASSESSMENT                                                   5-1

5.1       Introduction                                                                                               5-1

5.2       Environmental Legislation, Policies, Standards and Criteria                         5-1

5.3       Baseline Water Quality Conditions                                                             5-1

5.4       Water Sensitive Receivers                                                                         5-5

5.5       Potential Impacts during Construction Phase                                              5-5

5.6       Mitigation Measures for Construction Phase                                               5-7

5.7       Potential Impacts during Operational Phase                                               5-14

5.8       Mitigation Measures for Operational Phase                                               5-15

5.9       Residual and Cumulative Impacts                                                              5-19

5.10     Monitoring and Audit Requirement                                                            5-20

5.11     Summary                                                                                                  5-20

5.12     References                                                                                               5-21

 


 

6.                  WASTE MANAGEMENT                                                                                  6-1

6.1       Introduction                                                                                               6-1

6.2       Relevant Legislation, Policies, Standards and Criteria                                 6-1

6.3       Assessment Methodology                                                                          6-4

6.4       Sources and Types of Waste arising from the Project                                 6-4

6.5       Mitigation Measures                                                                                 6-13

6.6       Land Contamination                                                                                 6-22

6.7       Operational Waste                                                                                   6-24

6.8       Evaluation of Residual Impacts                                                                  6-24

6.9       Environmental Audit                                                                                 6-25

6.10     Summary                                                                                                  6-25

 

7.                  ECOLOGICAL IMPACT ASSESSMENT                                                          7-1

7.1       Introduction                                                                                               7-1

7.2       Study Areas                                                                                              7-1

7.3       Survey Methodologies                                                                               7-2

7.4       Habitats within the Study Area                                                                   7-6

7.5       Ecological Survey for LMH01                                                                   7-8

7.6       Ecological Survey for MUP03, MUP04A&B, MUP05                             7-19

7.7       Ecological Value of Streams and other Habitats within and

            Adjacent to the Project Areas                                                                   7-31

7.8       Potential Ecological Impacts of Stream Channelisation Proposals               7-40

7.9       Potential Adverse Ecological Impacts which require to be addressed

            by Minimization or Compensation Measures                                             7-55

7.10     Post-mitigation acceptability of the Project                                                7-61

7.11     Ecological Environmental Monitoring and Audit (EM&A)

            Requirements                                                                                           7-64

7.12     Conclusions                                                                                              7-68

            References                                                                                               7-69

 

8.                  LANDSCAPE AND VISUAL IMPACT ASSESSMENT                                   8-1

8.1       Introduction                                                                                               8-1

8.2       Scope and Content of Study                                                                      8-1

8.3       Purpose of LVIA                                                                                      8-2

8.4       Environmental Legislation, Policies, Plans, Standards and Criteria               8-3

8.5       Assessment Methodology & Criteria                                                          8-4

8.6       Review of Planning and Development Control Framework                        8-11

8.7       Existing Landscape Baseline Conditions                                                    8-11

8.8       Landscape Impact Assessment                                                                 8-13

8.9       Existing Visual Baseline Conditions                                                           8-16

8.10     Visual Impact Assessment                                                                        8-18

8.11     Recommended Landscape and Visual Impact Mitigation Measures            8-21

8.12     Residual Environmental Impact                                                                 8-30

8.13     Environmental Monitoring and Audit Requirements                                    8-34

8.14     Conclusions                                                                                              8-37

 

 

9.                  CULTURAL HERITAGE IMPACT ASSESSMENT                                           9-1

9.1       Introduction                                                                                               9-1

9.2       Aims of the Cultural Heritage Impact Assessment                                       9-1

9.3       Legislation and Standards                                                                          9-1

9.4       Assessment Methodology                                                                          9-2

9.5       Results of Desk-based Study                                                                     9-6

9.6       Results of Built Heritage Survey                                                                 9-8

9.7       Impact Assessment                                                                                    9-9

9.8       Evaluation of Impacts                                                                               9-10

9.9       Mitigation Measures                                                                                 9-16

9.10     Conclusions                                                                                              9-17

9.11     References                                                                                               9-17

 

10.              ENVIRONMENTAL MONITORING AND AUDIT REQUIREMENTS          10-1

10.1     Introduction                                                                                              10-1

10.2     Background                                                                                             10-1

10.3     Environmental Management                                                                      10-2

10.4     Project Organisation                                                                                 10-2

10.5     Construction Programme                                                                          10-2

10.6     Air Quality                                                                                               10-3

10.7     Construction Noise                                                                                   10-4

10.8     Water Quality                                                                                           10-5

10.9     Waste Management                                                                                  10-6

10.10   Ecology                                                                                                    10-7

10.11   Landscape and Visual                                                                              10-11

10.12   Cultural Heritage                                                                                     10-12

10.13   Other Information                                                                                    10-12

 

11.              ENVIRONMENTAL OUTCOMES                                                                   11-1

11.1     Justification and Benefits of the Project                                                      11-1

11.2     Population and Environmental Sensitive Areas Protected                           11-1

11.3     Environmental Friendly Design Recommended                                          11-3

11.4     Key Environmental Problems Avoided                                                      11-4

11.5     Environmental Benefits of Environmental Protection Measures

            Recommended                                                                                         11-4

 


12.              CONCLUSION                                                                                                  12-1

12.1     Background                                                                                             12-1

12.2     Location and Description of the Project                                                    12-1

12.3     Channel Design                                                                                        12-3

12.4     Justification and Benefits of the Project                                                      12-3

12.5     Key Environmental Issues                                                                         12-3

12.6     Air Quality Impact                                                                                    12-4

12.7     Construction Noise Impact                                                                       12-4

12.8     Water Quality Impact                                                                               12-5

12.9     Waste Management                                                                                  12-5

12.10   Ecological Impact                                                                                     12-6

12.11   Landscape and Visual Impact                                                                   12-7

12.12   Cultural Heritage Impact                                                                           12-8

12.13   Environmental Monitoring and Audit                                                         12-8

12.14   Overall Conclusion                                                                                   12-9

 

END OF TEXT

 

 

APPENDICES

 

Appendix A1    EIA Study Brief

Appendix A2    Correspondence relating to LYT04

Appendix B      Details of Construction Noise Impact Assessment

Appendix C      Sediment Quality Testing Results

Appendix D1    Construction and Demolition Materials Management Plan (C&DMMP)

Appendix D2    Aerial Photographs Interpretation

Appendix E      Details of Ecological Impact Assessment

Appendix E1    Flora and Fauna recorded during Surveys at LMH01

Appendix E2    Flora and Fauna recorded during Surveys at MUP03, MUP04 and MUP05

Appendix F      Details of Cultural Heritage Impact Assessment (Built Heritage Catalogue)

Appendix G      Mitigation Measures Implementation Schedule

Appendix H      Tree Survey Data

 

 


LIST OF TABLES

 

Table 2.1 Summary of Works for the Proposed Designated Projects of Channel Improvement Works

Table 2.2 Alternative Drainage Options Considered for the Proposed DP Channels

Table 2.3         Summary of the Evaluation of Alternative Drainage Options for the Proposed DP Channels

Table 2.4         Summary of the Evaluation of Alternative Channel Bed / Embankment Lining Options

Table 2.5         Evaluation of the Drainage Design Options adopted for the Proposed Channels

Table 2.6         Major Design Characteristics and Environmental Friendly Measures Adopted in the Proposed Channels

Table 2.7         Tentative Key Milestone Dates

Table 2.8         On-going and Planned Projects in the Study Area

Table 2.9         Proposed Maintenance Responsibilities

Table 2.10       Summary of Continuous Public Involvement

Table 2.11       Summary of Public Consultation

 

Table 3.1 Hong Kong Air Quality Objectives (AQOs)

Table 3.2 Representative Air Sensitive Receiver (ASR)

Table 3.3 Air Pollutants Concentrations at Tai Po EPD Station (2003)

Table 3.4         Representative ASRs chosen for Air Quality Monitoring during Construction Stage

 

Table 4.1         EIAO-TM Daytime Construction Noise Standards

Table 4.2         Details of Representative NSRs close to the Project

Table 4.3         Tentative Construction Programme for the Proposed Channels

Table 4.4         Predicted Noise Level during Construction of MUP Channels – Unmitigated

Table 4.5         Predicted Noise Level during Construction of LMH01 – Unmitigated

Table 4.6         Predicted Noise Level during Construction of MUP Channels – Mitigated (Level 1 mitigation: use of quiet plant)

Table 4.7         Predicted Noise Level during Construction of LMH01 – Mitigated (Level 1 mitigation: use of quiet plant)

Table 4.8         Predicted Noise Level during Construction of MUP Channels – Mitigated (Level 2 mitigation: use of quiet plant + use of temporary noise barriers)

Table 4.9         Predicted Noise Level during Construction of LMH01 – Mitigated (Level 2 mitigation: use of quiet plant + use of temporary noise barriers)

Table 4.10       Predicted Noise Level during Construction of MUP Channels – Mitigated (Further mitigation A: use of quiet plant + use of temporary noise barriers + restricting concurrent usage of equipment)

Table 4.11       Predicted Noise Level during Construction of LMH01 – Mitigated (Further mitigation A: use of quiet plant + use of temporary noise barriers + quiet working method & restricting concurrent usage of equipment)

Table 4.12        Cumulative Construction Noise Impact

Table 4.13        Summary of Proposed Construction Noise Mitigation Measures

Table 4.14       Representative NSRs chosen for Noise Monitoring during Construction Stage

 

Table 5.1          Field Observations at Watercourses in the Study Area

Table 5.2          Summary of EPD Water Quality Data for River Indus from 2002 to 2004

Table 5.3          Summary of Impacts from Construction Activities

Table 5.4          Summary of Mitigation Measures for Construction Impacts

Table 5.5          Summary of Mitigation Measures for Operational Impacts

 

Table 6.1          Sediment Quality Criteria for the Classification of Sediment

Table 6.2          Estimated Quantities of C&D Materials generated during Site Clearance

Table 6.3          Estimated Quantities of C&D Materials generated during Channel Excavation and Construction

Table 6.4          Results of the Sediment Testing

Table 6.5          Types of C&D Materials Generated by the Proposed Works

Table 6.6          Summary of the Quantities of C&D Materials and Waste Arising from the Proposed Channels

Table 6.7          Summary of the Quantities and Disposal Routes of C&D Materials and Waste Arising from the Project

Table 6.8          Preliminary Disposal Programme of the C&D Materials

Table 6.9          Assessment of Potential Contaminated Sites

 

Table 7.1          Habitat Types and Areas within the Study Areas.

Table 7.2          Habitat Types and Areas within the Project Areas

Table 7.3          Bat Numbers at Lin Ma Hang Lead Mine Roost

Table 7.4          Wetland dependent bird species and bird species of conservation importance recorded at LMH01 during monthly surveys, October 2003 to September 2004

Table 7.5          Wetland dependent herpetofauna species and species of conservation importance recorded at LMH01 during monthly surveys, October 2003 to September 2004

Table 7.6          Freshwater fish species recorded at LMH01 by Chan (2001) and/or KFBG (2004)

Table 7.7          Wetland dependent butterfly species and species of conservation importance recorded at LMH01 during monthly surveys, October 2003 to September 2004

Table 7.8          Dragonfly species recorded at LMH01 during monthly surveys, October 2003 to September 2004

Table 7.9          Mean number of aquatic invertebrates per kick sample recorded at LMH01, December 2004

Table 7.10        Wetland dependent bird species and bird species of conservation importance recorded at MUP03 - 05 during monthly surveys, October 2003 to September 2004

Table 7.11        Wetland dependent herpetofauna species and species of conservation importance recorded at MUP03 - 05 during monthly surveys, October 2003 to September 2004

Table 7.12        Freshwater fish recorded from MUP04A and MUP05 in January 2005, and other recent records

Table 7.13        Dragonfly species recorded at MUP03 - 05 during monthly surveys, October 2003 to September 2004

Table 7.14        Mean number of aquatic invertebrates per kick sample recorded at MUP04A and MUP05, December 2004

Table 7.15        Ecological evaluation of Stream and Riparian Zone at LMH01

Table 7.16        Ecological evaluation of Agricultural Habitats at LMH01

Table 7.17        Ecological evaluation of Woodland at LMH01

Table 7.18        Ecological evaluation of Wasteland at LMH01

Table 7.19        Ecological evaluation of Streams and Riparian Zone at MUP04A

Table 7.20        Ecological evaluation of Streams and Riparian Zone at MUP05

Table 7.21        Ecological evaluation of Roadside Plantation at MUP03, MUP04A, MUP04B and MUP05

Table 7.22        Ecological evaluation of the Agricultural Habitats at MUP03, MUP04A, MUP04B and MUP05

Table 7.23        Ecological evaluation of Orchard/Nursery at MUP04A, MUP04B

Table 7.24        Ecological evaluation of Bare Ground and Wasteland at MUP04A, MUP04B & MUP05

Table 7.25        Significance of Potential Ecological Impacts on LMH01

Table 7.26        Significance of Potential Ecological Impacts of initial proposed design for MUP03, 04A, 04B & 05

Table 7.27        Significance of Potential Ecological Impacts of revised proposed design for MUP03, 04A, 04B & 05

Table 7.28        Potential adverse ecological impacts which require to be addressed by minimization or mitigation measures

Table 7.29        Recommended tree and bamboo species for planting at MUP05

Table 7.30        Summary of significant potential ecological impacts, required mitigation measures, and post-mitigation acceptability of the project at LMH01

Table 7.31        Summary of significant potential ecological impacts, required mitigation measures, and post-mitigation acceptability of the project at MUP04A

Table 7.32        Summary of significant potential ecological impacts, required mitigation measures and post-mitigation acceptability of the project at MUP03 & MUP04B

Table 7.33        Summary of significant potential ecological impacts, required mitigation measures, and post-mitigation acceptability of the project at MUP05

Table 7.34        Recommended Ecological Monitoring and Audit Programme at LMH01

Table 7.35        Recommended Ecological Monitoring and Audit Programme at MUP05

 

Table 8.1          Proposed Works covered in the LVIA

Table 8.2          The Significance Threshold Matrix A

Table 8.3          Residual Impact Significance Threshold Matrix

Table 8.4          Landscape Character Areas

Table 8.5A       Landscape Impact MUP03, MUP04A, MUP04B & MUP05 – Assuming No Mitigation

Table 8.5B       Landscape Impact LMH01 – Assuming No Mitigation

Table 8.6A       Visually Sensitive Receivers (MUP03, MUP04A, MUP04B & MUP05)

Table 8.6B       Visually Sensitive Receivers (LMH01)

Table 8.7A       Summary of Visual Impact – Assuming No Mitigation (MUP03, MUP04A, MUP04B & MUP05)

Table 8.7B       Summary of Visual Impact – Assuming No Mitigation (LMH01)

Table 8.8          List of Suitable Trees for Single Tree Planting

Table 8.9          Details of Tree Preservation

Table 8.10A     Landscape Impact MUP03, MUP04A, MUP04B & MUP05 – Assuming Mitigation

Table 8.10B     Landscape Impact LMH01 – Assuming Mitigation

Table 8.11A     Summary of Visual Impact – Assuming Mitigation (MUP03, MUP04A, MUP04B, MUP05)

Table 8.11B     Summary of Visual Impact – Assuming Mitigation (LMH01)

Table 8.12        Proposed Landscape and Visual Impact Mitigation Measures

 

Table 9.1          Assessment of Impacts (Construction Phase) to Built Heritage Features in LMH01 (near Lin Ma Hang)

Table 9.2          Assessment of Impacts (Construction Phase) to Built Heritage Features in MUP03 (near Loi Tung)

Table 9.3          Assessment of Impacts (Construction Phase) to Built Heritage Features in MUP04A (near Loi Tung)

Table 9.4          Assessment of Impacts (Construction Phase) to Built Heritage Features in MUP05 (near Loi Tung)

Table 9.5          Assessment of Impacts (Operational Phase) to Built Heritage Features in LMH01 (near Lin Ma Hang)

Table 9.6          Assessment of Impacts (Operational Phase) to Built Heritage Features in MUP03 (near Loi Tung)

Table 9.7          Assessment of Impacts (Operational Phase) to Built Heritage Features in MUP04A (near Loi Tung)

Table 9.8          Assessment of Impacts (Operational Phase) to Built Heritage Features in MUP05 (near Loi Tung)

Table 9.9          Mitigation Recommendations for Impacted Resources (Construction Phase) to Built Heritage Features in LMH01 (near Lin Ma Hang)

Table 9.10        Summary of Mitigation Measures and Implementation Schedule

 

Table 10.1        Representative ASRs chosen for Air Quality Monitoring during Construction Stage

Table 10.2        Representative NSRs for Noise Monitoring during Construction Stage

Table 10.3        Water Quality Monitoring Stations during Construction Stage

Table 10.4        Recommended Ecological Monitoring and Audit Programme at LMH01

Table 10.5        Recommended Ecological Monitoring and Audit at MUP05

 

Table 12.1        Scale of Proposed Drainage Works

 

 

LIST OF FIGURES

 

Figure 1.1            Location Plan of the Project

Figure 1.2            Proposed Channel at Lung Yeuk Tau (LYT04) in relation to the Site of Cultural Heritage

Figure 1.3            Proposed Channels at Man Uk Pin (MUP03, 04A, 04B, 05) in relation to the Conservation Area

Figure 1.4            Proposed Improvement Works at Lin Ma Hang (LMH01) in relation to the Site of Special Scientific Interest

 

Figure 2.1            Location Plan of Proposed (Designated Project) Channels

Figure 2.2            General Arrangement for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 2.3            General Arrangement for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 2.4            General Arrangement for Proposed Improvement Works at Lin Ma Hang (LMH 01)

Figure 2.5            Typical Layout and Section of Two-Stage Channels

Figure 2.6            Preliminary Secondary Channel Design in Lung Yeuk Tau (LYT04)

Figure 2.7            Revised Channel Design in Lung Yeuk Tau (LYT04)

Figure 2.8            Preliminary Secondary Channel Design in Man Uk Pin Region (MUP03, 04A, 04B & 05)

Figure 2.9            Preliminary Secondary Channel Design in Lin Ma Hang (LMH01)

Figure 2.10          Flood Extent Map under 10 Year Return Period Event Before and After the Construction of the Proposed Channel MUP01-05

Figure 2.11          Flood Extent Map under 10 Year Return Period Event Before and After the Construction of the Proposed Channel LMH01

Figure 2.12          Preliminary Construction Programme for MUP03, MUP04A, MUP04B, MUP05 and LMH01 Channels

 

Figure 3.1            Locations of Representative Air Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 3.2            Locations of Representative Air Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 3.3            Locations of Representative Air Sensitive Receivers for Proposed Improvement Works at Lin Ma Hang (LMH 01)

 

Figure 4.1            Locations of Representative Noise Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 4.2            Locations of Representative Noise Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 4.3            Locations of Representative Noise Sensitive Receivers for Proposed Improvement Works at Lin Ma Hang (LMH 01)

Figure 4.4            Locations of Proposed Temporary Noise Barrier for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 4.5            Locations of Proposed Temporary Noise Barrier for Proposed Channel at Man Uk Pin Region (MUP 03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 4.6            Locations of Proposed Temporary Noise Barrier for Proposed Improvement Works at Lin Ma Hang (LMH01)

 

Figure 5.1            Schematic Diagram of Typical Temporary Drainage Measures during Construction Stage

 

Figure 6.1            Sediment Sampling Locations at MUP05

 

Figure 7.1            Location Plan of Proposed Drainage Channels Under Package C Project

Figure 7.2            LMH01 Study and Project Areas and Habitat Map

Figure 7.3a          MUP03, 04 & 05 Study and Project Areas and Habitat Map

Figure 7.3b          MUP03, 04 & 05 Study and Project Areas and Habitat Map

Figure 7.4            Downstream section of LMH01 – concrete-lined channel to be replaced by gabion lining

Figure 7.5            Existing concrete lined bank of LMH01 to be replaced by gabion lining

Figure 7.6            MUP05 – existing semi-natural channel

Figure 7.7            MUP04A – existing disturbed channel on lower section of stream

Figure 7.8            MUP03 – existing ditch

Figure 7.9            MUP05 – channelised downstream section

Figure 7.10          MUP05 – existing stream showing well-vegetated north bank

Figure 7.11          Initial General Arrangement Drawing for MUP03, 04 & 05 (382486/REV/027A)

Figure 7.12          Initial General Arrangement Drawing for MUP03, 04 & 05 (382486/REV/028A)

Figure 7.13          Revised General Arrangement Drawing for MUP03, 04A, 04B & 05

Figure 7.14          Revised General Arrangement Drawing for MUP03, 04A, 04B & 05

Figure 7.15          Typical Section of the Proposed Two-stage Channel at MUP05

 

Figure 8.1A         Landscape Resource (LR) & Character Areas (LCA) for MUP03, 04A/B, 05

Figure 8.1B         Landscape Resource (LR) & Character Areas (LCA) for LMH01

Figure 8.2            Landscape Character Areas (LCA): Photographic Record

Figure 8.3A-I      (Key Plan) Unmitigated Landscape Impact (Tree Preservation Plan) MUP03, 04A/B, 05

Figure 8.3A-II     Unmitigated Landscape Impact (Tree Preservation Plan) MUP03, 04A/B, 05

Figure 8.3A-III    Unmitigated Landscape Impact (Tree Preservation Plan) MUP03, 04A/B, 05

Figure 8.3A-IV   Unmitigated Landscape Impact (Tree Preservation Plan) MUP03, 04A/B, 05

Figure 8.3A-V     Unmitigated Landscape Impact (Tree Preservation Plan) MUP03, 04A/B, 05

Figure 8.3B-I      (Key Plan) Unmitigated Landscape Impact (Tree Preservation Plan) LMH01

Figure 8.3B-II     Unmitigated Landscape Impact (Tree Preservation Plan) LMH01

Figure 8.3B-III    Unmitigated Landscape Impact (Tree Preservation Plan) LMH01

Figure 8.4A         Location of Visually Sensitive Receivers & Zone of Visual Influence MUP03, 04A/B, 05

Figure 8.4A-i       MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 01 & 02

Figure 8.4A-ii      MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 03 & 04

Figure 8.4A-iii     MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 05 & 06

Figure 8.4A-iv     MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 07 & 08

Figure 8.4A-v      MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 09 & 10

Figure 8.4A-vi     MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 11 & 12

Figure 8.4A-vii    MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 13 & 14

Figure 8.4A-viii   MUP03, 04A/B, 05 - Visually Sensitive Receivers – VSR 15

Figure 8.4B         Location of Visually Sensitive Receivers & Zone of Visual Influence LMH01

Figure 8.4B-i       LMH01 - Visually Sensitive Receivers – VSR 01 & 02

Figure 8.4B-ii      LMH01 - Visually Sensitive Receivers – VSR 03 & 04

Figure 8.4B-iii     LMH01 - Visually Sensitive Receivers – VSR 05 & 06

Figure 8.4B-iv     LMH01 - Visually Sensitive Receivers – VSR 07

Figure 8.5A         Visual Impact Unmitigated – MUP03, 04A/B & 05 (VSR 02)

Figure 8.5B         Visual Impact Unmitigated – LMH01 (VSR 07)

Figure 8.6A-I      (Key Plan) Landscape Mitigation Proposal MUP03, 04A/B, 05

Figure 8.6A-II     Landscape Mitigation Proposal MUP03, 04A/B, 05

Figure 8.6A-III    Landscape Mitigation Proposal MUP03, 04A/B, 05

Figure 8.6A-IV   Landscape Mitigation Proposal MUP03, 04A/B, 05

Figure 8.6A-V     Landscape Mitigation Proposal MUP03, 04A/B, 05

Figure 8.6B-I      (Key Plan) Landscape Mitigation Proposal LMH01

Figure 8.6B-II     Landscape Mitigation Proposal LMH01

Figure 8.6B-III    Landscape Mitigation Proposal LMH01

Figure 8.7            Landscape Mitigation Measure

Figure 8.7i           Landscape Mitigation Measure: Special treatment to Preserve Existing Trees within the Channel

Figure 8.8A         Residual Visual Impact – MUP03, 04A/B & 05 (VSR 02)

Figure 8.8B         Residual Visual Impact – LMH01 (VSR 07)

 

Figure 9.1            Recorded Resources in Lin Ma Hang (AAHB-838 to 852 and AAHB-855 to 881)

Figure 9.2            Recorded Resources near Loi Tung - Shrines (AAHB-853 and 854)

Figure 9.3            Proposed Works Area: LMH01 (Lin Ma Hang)

Figure 9.4            Proposed Works Area: MUP03, 04A, 04B & 05 (Near Loi Tung)

 

Figure 10.1          Locations of Proposed Air Quality Monitoring Station and Representative Air Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 10.2          Locations of Proposed Air Quality Monitoring Station and Representative Air Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 10.3          Locations of Proposed Noise Monitoring Station and Representative Noise Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 10.4          Locations of Proposed Noise Monitoring Station and Representative Noise Sensitive Receivers for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 10.5          Locations of Proposed Noise Monitoring Station and Representative Noise Sensitive Receivers for Proposed Improvement Works at Lin Ma Hang (LMH01)

Figure 10.6          Locations of Proposed Water Quality Monitoring Stations for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 1 of 2)

Figure 10.7          Locations of Proposed Water Quality Monitoring Stations for Proposed Channel at Man Uk Pin Region (MUP03, 04A, 04B & 05) (Sheet 2 of 2)

Figure 10.8          Locations of Proposed Water Quality Monitoring Stations for Proposed Improvement Works at Lin Ma Hang (LMH01)