1.2 Project Scope and Programme
2............ Air Quality Impact. 5
3.6 Impact Monitoring for Construction Noise
3.7 Event and Action Plan for Construction Noise
4............ Water Quality Impact. 11
4.2 Monitoring Schedule and Stations
4.8 Laboratory Measurement / Analysis4
4.10 Mitigation of Adverse Environmental Impacts
5............ Waste Management Implications
5.2 Waste Control and Mitigation Measures
6............ Impact on CULTURAL HERITAGE
6.2 Guidelines for Monitoring Brief
7............ MARINE ECOLOGY IMpact
7.2 Mitigation measures for corals
7.3 Coral monitoring
requirement
8............ FISHERIES Impact
9............ Site Environmental Audit
9.2 Compliance with Legal and Contractual Requirements
10.2 Electronic Reporting of EM&A Information
10.3 Baseline Monitoring Report
10.5 First Monthly EM&A Report
10.7 Quarterly EM&A Summary Reports
10.8 Final EM&A Review Reports
10.10 Interim Notifications of Environmental Quality Limit Exceedances
List of Tables
Table 1.1 Volume of Dredging
Table 3.1 Noise Monitoring Stations during Construction Phase
Table 3.2 Action and Limit Levels for Construction Noise
Table 3.3 Event and Action Plan for Construction Noise
Table 4.1 Proposed Marine Water Quality Stations for Baseline and Impact Monitoring
Table 4.2 Proposed Marine Water Quality Monitoring Frequency and Parameters
Table 4.3 Analysis Methods to be Applied to Marine Water Quality Samples
Table 4.4 Action
and Limit Levels for Marine Water Quality at the WSD
Table 4.5 Event and Action Plan for Marine Water Quality
Table 5.1 Summary of Waste Handling Procedures and Disposal Routes
List of Figures
Figure 1.1 Preliminary Outline Development Plan
Figure 1.2 General Layout of Proposed Cruise Terminal Berths
Figure 1.3 Staged Dredging Requirements for the Cruise Terminal
Figure 1.4 Project Organization
Figure 3.1 Noise Monitoring Stations
Figure 4.1 Water Quality Monitoring Stations
Figure 7.1 Proposed Coral Recipient Site in Junk Bay
Figure 7.2 Location of Hard Substrata Sea Area within the Dredging Site
Figure 9.1 Environmental Complaint Flow Diagram
List of Appendices
Appendix A Construction Programme
Appendix B1 Construction Noise Monitoring Field Record Sheet
Appendix B2 Water Quality Monitoring Data Record Sheet
Appendix C Implementation Schedule of the Proposed Mitigation Measures
Appendix D Archaeological Monitoring Brief for Kai Tak Dredging
Appendix E Sample Template for the Interim Notification