TABLE OF CONTENTS
1.1 Background
1.2 The Project
1.3 Objectives of the EIA Study
1.4 Structure of the EIA Report
2.1 Site Location and History
2.2 Purpose and Objective of the Project
2.3 Consideration of Alternatives/Options
2.4 Details of the Project
2.5 Concurrent Projects
3.1 Introduction
3.2 Environmental Legislations, Standards and Guidelines
3.3 Description of the Environment and Future Trends
3.4 Identification of Air Sensitive Receivers
3.5 Identification of Environmental Impacts during
Construction Phase
3.6 Assessment Methodology
3.7 Dispersion Modelling & Modelling Approach
3.8 Prediction and Evaluation of Environmental Impacts
3.9 Mitigation of Adverse Environmental Impacts
3.10 Evaluation of Residual Impacts
3.11 Environmental Monitoring and Audit
3.12 Conclusion
4.1 Introduction
4.2 Environmental Legislation, Standards, and Guidelines
4.3 Description of Existing Environment
4.4 Noise Sensitive Receivers
4.5 Construction Phase
4.6 Operational Phase - Fixed Plant Noise Impact
Assessment
4.7 Operational Phase - Rail Noise Impact Assessment
4.8 Environmental Monitoring and Audit Requirement
4.9 Conclusion
5.1 Introduction
5.2 Environmental Legislation, Plans, Standards, and
Guidelines
5.3 Description of the Environment
5.4 Water Sensitive Receivers
5.5 Assessment Methodologies
5.6 Identification and Evaluation of Environmental
Impacts
5.7 Cumulative Impacts from Concurrent Project
5.8 Recommended Water Quality Mitigation Measures
5.9 Evaluation of Residual Impacts
5.10 EM&A Requirements
5.11 Conclusions
6 waste
management implications
6.1 Introduction
6.2 Environmental Legislation, Standards and Guidelines
6.3 Identification and Evaluation of Wastes Implications
6.4 Mitigation of Adverse Environmental Impacts
6.5 Evaluation of Residual Environmental Impacts
6.6 Environmental Monitoring and Audit Requirement
6.7 Conclusion
7.1 Introduction
7.2 Environmental Legislation, Plans, Standards, and
Guidelines
7.3 Assessment Methodologies
7.4 Description of the Environment
7.5 Identification of Potential Land Contamination
Concern
7.6 Site Investigation Plan
7.7 Evaluation of Environmental Impacts
7.8 Mitigation of Adverse Environmental Impacts
7.9 Evaluation of Residual Environmental Impacts
7.10 Conclusion
8.1 Introduction
8.2 Environmental Legislation,
Standards and Guidelines
8.3 Assessment Methodology
8.4 Description of the Environment
8.5 Survey Findings
8.6 Ecological Value of Habitats
and Species
8.7 Identification of Potential
Ecological Impacts
8.8 Evaluation of Potential
Ecological Impacts
8.9 Mitigation of Adverse
Environmental Impacts
8.10 Cumulative Ecological Impacts
8.11 Evaluation of Residual
Ecological Impacts
8.12 Environmental Monitoring and
Audit
8.13 Conclusion
8.14 References
9 LANDSCAPE AND
VISUAL IMPACT ASSESSMENT
9.1 Introduction
9.2 Scope and Content of the Study
9.3 Environmental Legislation, Standards and Guidelines
9.4 Assessment Methodology
9.5 Review of Planning Control Framework
9.6 Baseline Study
9.7 Landscape Impact Assessment
9.8 Visual Impact Assessment
9.9 Landscape and Visual Mitigation Measures
9.10 Residual Impacts
9.11 Cumulative Impacts
9.12 Conclusion. 9-65
10 cultural
heritage impact assessment
10.1 Introduction
10.2 Environmental Legislation, Standards and Guidelines
10.3 Assessment Methodology
10.4 Background
10.5 Baseline Conditions
10.6 Identification of Environmental Impacts
10.7 Mitigation Measures
10.8 Conclusion
10.9 References
11.1 Background
11.2 Assessment Criteria
11.3 Assessment Approach
11.4 Description of Assessment Area
11.5 Hazard Identification
11.6 Hazard Occurrence
11.7 Consequence and Impact Analysis
11.8 Risk Evaluation
11.9 Risk Mitigation Measures
11.10 Environmental
Monitoring and Audit Requirement
11.11 Conclusion
11.12 References
12 Environmental
Monitoring and Audit
12.1 Introduction
12.2 Air Quality
12.3 Noise. 12-1
12.4 Water Quality
12.5 Waste Management
12.6 Land Contamination
12.7 Terrestrial Ecology
12.8 Landscape and Visual
12.9 Cultural Heritage
12.10 Hazard
to Life
13 Summary of Environmental Outcomes.. 13-1
13.1 Overview
13.2 Environmental
Benefits of the Project
13.3 Incorporation
of Environmentally Friendly Options
13.4 Environmental
Designs Recommended
13.5 Key
Environmental Problems Avoided and Environmentally Sensitive Areas Protected
13.6 Environmental
Protection Measures Recommended. 13-5
13.7 Estimation
of Population Protected
14.1 Conclusion of EIA Study
List of tables
Table 2.1 Considerations and Constraints for Alignment Option
Selection
Table 2.2 Comparison of Alignment Options
Table 2.3 Comparison of TRB Scheme Options
Table 2.4 Key Public Views and Corresponding Design Considerations
Table 2.5 Key Recommended Mitigation Measures /
Good Site Practices / Enhancement Measures and their Associated Benefits
Table 2.6 List of Concurrent Projects and Potential Cumulative Impacts
Table
3.1 Hong Kong Air Quality Objectives
Table
3.2 The Air Quality Monitoring Data
Recorded at EPD’s Tuen Mun AQMS in Year 2016 – 2020
Table
3.3 PATHv2.1 Model - Air Pollutant
Concentrations in Year 2025
Table
3.4 Representative Air Sensitive
Receivers along TME
Table
3.5 Representative Air Sensitive
Receivers in the vicinity of Offsite
Works Area
Table
3.6 Particle Size Distribution
Table
3.7 Dust Emission Design Control
Measures
Table
3.8 Emission Factors for Dusty
Construction Activities
Table
3.9 Fractions of Particulates for
Construction Dust
Table
3.10 Tentative Construction Programme
Table
3.11 Particle Size Distribution of
Aggregate Handling (equivalent to Heavy Construction Activities and Wind
Erosion)
Table
3.12 Worst Predicted Cumulative Air
Quality Impact at Representative ASRs (Scenario 1 with Dust Mitigation
Measures)
Table
3.13 Worst Predicted Cumulative Air
Quality Impact at Representative ASRs (Scenario 2 with Dust Mitigation
Measures)
Table
4.1 Noise Criteria for Daytime
Construction Noise
Table
4.2 Construction Noise Criteria
during Restricted Hours
Table
4.3 Acceptable Noise Levels for
Airborne Rail Noise
Table
4.4 Acceptable Noise Levels for Fixed Noise Source
Table
4.5 Summary of Measured Prevailing
Background Noise Levels
Table
4.6 Identified NSRs and
Representative Assessment Points within 300m Assessment Area from the Project
Table
4.7 Summary of Unmitigated
Construction Noise Levels
Table
4.8 SWL of QPME adopted for
Construction Noise Mitigation. 4-20
Table
4.9 Summary of Mitigated Construction
Noise Levels (Non-Restricted Hours)
Table
4.10 Summary of Cumulative Noise
Impact
Table
4.11 Maximum Allowable SWL for Planned
Noise Source at A16 Station
Table
4.12 Maximum Allowable SWL for Planned
Noise Source at TMS Station
Table
4.13 Assumptions Adopted in Railway Noise Assessment
Table
4.14 Summary of Unmitigated Rail Noise
Levels
Table
4.15 Summary of Cumulative Rail Noise
Levels (Unmitigated Scenario) 4-43
Table
4.16 Proposed Noise Mitigation
Measures for Rail Operation
Table
4.17 Summary of Mitigated Rail Noise
Levels
Table
4.18 Summary of Cumulative Rail Noise
Levels (Mitigated Scenario)
Table
5.1 Summary of Water Quality
Objectives for North Western WCZ
Table
5.2 WSD Standards at Flushing Water
Intakes
Table
5.3 Summary Statistics of Marine
Water Quality of North Western WCZ Collected by EPD in 2020
Table
5.4 Summary Statistics of River Water
Quality of Tuen Mun River Collected by EPD in 2020
Table
6.1 Summary of Inert and non-inert
C&D Materials Quantities Generated
Table
6.2 Changes in Sampling Location ID
Table
6.3 Summary of Chemical Screening
Results
Table
6.4 Summary of Biological Screening
Results
Table
6.5 Estimated Quantities of Sediment
under each Disposal Option
Table
6.6 Waste Arising, Waste Handling
Procedures and Disposal Outlets 6-16
Table 7.1 Summary of
Historical Land Uses of the Project Area
Table 7.2 Summary of Potential Land Contamination Issues within the Project Area
Table 7.3 Sampling and Testing
Plan
Table 8.1 Baseline Information of Ecological Resources within the
Assessment Area
Table 8.2 Ecological Survey Schedule
Table 8.3 Maximum Number of Nests Recorded at
Tuen Mun Egretry (2017 – 2021) 8-7
Table 8.4 Species of Conservation Importance
Recorded from Literature Review for TME Alignment and the Mong Wing Street
Offsite Works Area
Table 8.5 Habitats Identified within the
Assessment Area
Table 8.6 Number of Nests Recorded at Tuen Mun
Egretry
Table 8.7 Number and Species of Night Roost
Ardeid Recorded during Ardeid Night Roost Survey
Table 8.8 Ecological Evaluation of Modified
Watercourse and Developed Area within the Assessment Area for TME Alignment
Table 8.9 Ecological Evaluation of Mixed
Woodland, Village/Orchard and Plantation within the Assessment Area for TME
Alignment
Table 8.10 Species of Conservation Importance
Recorded within the Assessment Area for TME Alignment
Table 8.11 Ecological Evaluation of Habitats
within the Assessment Area for Mong Wing Street Offsite Works Area
Table 8.12 Direct Loss of Terrestrial Habitats
within Project Footprint
Table 8.13 Evaluation of Potential Ecological
Impacts to Developed Area and Modified Watercourse (Assessment Area of TME
Alignment)
Table 8.14 Evaluation of Potential Ecological
Impacts to Mixed Woodland, Village/Orchard and Plantation (Assessment Area of
TME Alignment)
Table 8.15 Evaluation of Potential Ecological
Impacts to Identified Habitats (Assessment Area of Offsite Works Area)
Table 8.16 Seasonal Sunset Time During Survey
Table 8.17 Summary of Construction
Works/Activities within 100m from Ardeid Night Roost and the Associated Mitigation Measures for the Ardeid Night
Roost
Table
9.1 Relationship between Sensitivity
and Magnitude of Change in Defining Impact Significance
Table
9.2 Relationship between Visually
Sensitive Receivers (VSRs) Sensitivity and Magnitude of Change in Defining
Impact Significance
Table 9.3 Summary of the
Review of Planning and Development Control Framework
Table 9.4 Landscape
Resources and Their Sensitivity. 9-12
Table 9.5 Landscape
Character Areas and Their Sensitivity
Table
9.6 Visually
Sensitive Receivers (VSRs) and Their Sensitivity
Table 9.7 Magnitude of
Landscape Impact during Construction and Operation
Table 9.8 Magnitude
of Visual Impact during Construction and Operational Phases
Table
9.9 Proposed Landscape and Visual
Mitigation Measures for Construction Phase
Table
9.10
Proposed Landscape and Visual Mitigation Measures for Operational Phase
Table
9.11
Significance of Landscape Impact during Construction and Operational
Phases
Table
9.12
Significance of Visual Impact during Construction and Operational Phases
Table
11.1 Population within Consultation
Zone of the LPG Store
Table
11.2 Road Population in Construction
Phase Scenario (Year 2026)
Table
11.3 Road Population in Operational
Phase Scenario (Year 2031)
Table
11.4 Train Population in Operational
Phase Scenario (Year 2031)
Table
11.5 Pedestrian Population
Table
11.6 Definitions of Time Modes
Table
11.7 Stability Category-Wind Speed
Frequencies at HKO Tuen Mun Weather Station
Table
11.8 Weather Class-Wind Direction
Frequencies at HKO Tuen Mun Weather Station
Table
11.9 Identified Failure Cases for the
LPG Store
Table
11.10 Summary
of Identified Failure Cases and Their Associated Failure Rates
Table
11.11 Summary of Identified Failure
Cases and Their Associated Failure Rates
Table
11.12 Summary of Road Ignition Sources
for Construction Phase (Year 2026)
Table
11.13 Summary of Road Ignition Sources
for Operational Phase (Year 2031)
Table
11.14 Societal Risk Data for the LPG
Store covering all Assessed Scenarios
Table
11.15 Breakdown of PLL for the LPG
Store by Major Events (All Assessed Scenarios)
Table 13.1 Summary of Key Environmental Problems Avoided and
Sensitive Areas Protected
Table 13.2 Key Recommended Mitigation Measures / Good Site Practices / Enhancement
Measures and their Associated Benefits
Table 14.1 Summary
of Key Environmental Outcomes and Benefits