TABLE OF CONTENTS

 

 

1         Introduction.. 1-1

1.1        Background. 1-1

1.2        The Project 1-1

1.3        Objectives of the EIA Study. 1-2

1.4        Structure of the EIA Report 1-3

2         PROJECT DESCRIPTION.. 2-1

2.1        Site Location and History. 2-1

2.2        Purpose and Objective of the Project 2-1

2.3        Consideration of Alternatives/Options. 2-3

2.4        Details of the Project 2-12

2.5        Concurrent Projects. 2-23

3         Air Quality impact. 3-1

3.1        Introduction. 3-1

3.2        Environmental Legislations, Standards and Guidelines. 3-1

3.3        Description of the Environment and Future Trends. 3-2

3.4        Identification of Air Sensitive Receivers. 3-4

3.5        Identification of Environmental Impacts during Construction Phase. 3-6

3.6        Assessment Methodology. 3-9

3.7        Dispersion Modelling & Modelling Approach. 3-15

3.8        Prediction and Evaluation of Environmental Impacts. 3-17

3.9        Mitigation of Adverse Environmental Impacts. 3-17

3.10      Evaluation of Residual Impacts. 3-21

3.11      Environmental Monitoring and Audit 3-22

3.12      Conclusion. 3-22

4         noise impact. 4-1

4.1        Introduction. 4-1

4.2        Environmental Legislation, Standards, and Guidelines. 4-1

4.3        Description of Existing Environment 4-4

4.4        Noise Sensitive Receivers. 4-6

4.5        Construction Phase. 4-14

4.6        Operational Phase - Fixed Plant Noise Impact Assessment 4-32

4.7        Operational Phase - Rail Noise Impact Assessment 4-35

4.8        Environmental Monitoring and Audit Requirement 4-50

4.9        Conclusion. 4-51

5         water quality Impact. 5-1

5.1        Introduction. 5-1

5.2        Environmental Legislation, Plans, Standards, and Guidelines. 5-1

5.3        Description of the Environment 5-5

5.4        Water Sensitive Receivers. 5-9

5.5        Assessment Methodologies. 5-10

5.6        Identification and Evaluation of Environmental Impacts. 5-10

5.7        Cumulative Impacts from Concurrent Project 5-14

5.8        Recommended Water Quality Mitigation Measures. 5-14

5.9        Evaluation of Residual Impacts. 5-19

5.10      EM&A Requirements. 5-19

5.11      Conclusions. 5-19

6         waste management implications.. 6-1

6.1        Introduction. 6-1

6.2        Environmental Legislation, Standards and Guidelines. 6-1

6.3        Identification and Evaluation of Wastes Implications. 6-4

6.4        Mitigation of Adverse Environmental Impacts. 6-12

6.5        Evaluation of Residual Environmental Impacts. 6-18

6.6        Environmental Monitoring and Audit Requirement 6-18

6.7       Conclusion. 6-18

7         Land Contamination.. 7-1

7.1        Introduction. 7-1

7.2        Environmental Legislation, Plans, Standards, and Guidelines. 7-1

7.3        Assessment Methodologies. 7-1

7.4        Description of the Environment 7-2

7.5        Identification of Potential Land Contamination Concern. 7-2

7.6        Site Investigation Plan. 7-9

7.7        Evaluation of Environmental Impacts. 7-11

7.8        Mitigation of Adverse Environmental Impacts. 7-11

7.9        Evaluation of Residual Environmental Impacts. 7-12

7.10      Conclusion. 7-13

8         ECOLOGY (TERRESTRIAL) 8-1

8.1        Introduction. 8-1

8.2        Environmental Legislation, Standards and Guidelines. 8-1

8.3        Assessment Methodology. 8-1

8.4        Description of the Environment 8-6

8.5        Survey Findings. 8-11

8.6        Ecological Value of Habitats and Species. 8-16

8.7        Identification of Potential Ecological Impacts. 8-20

8.8        Evaluation of Potential Ecological Impacts. 8-29

8.9        Mitigation of Adverse Environmental Impacts. 8-31

8.10      Cumulative Ecological Impacts. 8-37

8.11      Evaluation of Residual Ecological Impacts. 8-37

8.12      Environmental Monitoring and Audit 8-38

8.13      Conclusion. 8-38

8.14      References. 8-39

9         LANDSCAPE AND VISUAL IMPACT ASSESSMENT. 9-1

9.1        Introduction. 9-1

9.2        Scope and Content of the Study. 9-1

9.3        Environmental Legislation, Standards and Guidelines. 9-2

9.4        Assessment Methodology. 9-3

9.5        Review of Planning Control Framework. 9-8

9.6        Baseline Study. 9-11

9.7        Landscape Impact Assessment 9-27

9.8        Visual Impact Assessment 9-37

9.9        Landscape and Visual Mitigation Measures. 9-45

9.10      Residual Impacts. 9-48

9.11      Cumulative Impacts. 9-64

9.12      Conclusion. 9-65

10      cultural heritage impact assessment. 10-1

10.1      Introduction. 10-1

10.2      Environmental Legislation, Standards and Guidelines. 10-1

10.3      Assessment Methodology. 10-2

10.4      Background. 10-3

10.5      Baseline Conditions. 10-5

10.6      Identification of Environmental Impacts. 10-6

10.7      Mitigation Measures. 10-7

10.8      Conclusion. 10-7

10.9      References. 10-8

11      HAZARD TO LIFE.. 11-1

11.1      Background. 11-1

11.2      Assessment Criteria. 11-1

11.3      Assessment Approach. 11-2

11.4      Description of Assessment Area. 11-3

11.5      Hazard Identification. 11-13

11.6      Hazard Occurrence. 11-19

11.7      Consequence and Impact Analysis. 11-29

11.8      Risk Evaluation. 11-32

11.9      Risk Mitigation Measures. 11-40

11.10   Environmental Monitoring and Audit Requirement 11-43

11.11   Conclusion. 11-43

11.12   References. 11-44

12      Environmental Monitoring and Audit. 12-1

12.1      Introduction. 12-1

12.2      Air Quality. 12-1

12.3      Noise. 12-1

12.4      Water Quality. 12-1

12.5      Waste Management 12-2

12.6      Land Contamination. 12-2

12.7      Terrestrial Ecology. 12-2

12.8      Landscape and Visual 12-3

12.9      Cultural Heritage. 12-3

12.10   Hazard to Life. 12-3

13      Summary of Environmental Outcomes.. 13-1

13.1     Overview.. 13-1

13.2     Environmental Benefits of the Project 13-1

13.3     Incorporation of Environmentally Friendly Options. 13-1

13.4     Environmental Designs Recommended. 13-2

13.5     Key Environmental Problems Avoided and Environmentally Sensitive Areas Protected. 13-3

13.6     Environmental Protection Measures Recommended. 13-5

13.7     Estimation of Population Protected. 13-10

14      Conclusion.. 14-1

14.1      Conclusion of EIA Study. 14-1

 

 

 


 

List of tables

Table 2.1      Considerations and Constraints for Alignment Option Selection  2-5

Table 2.2      Comparison of Alignment Options. 2-6

Table 2.3      Comparison of TRB Scheme Options. 2-7

Table 2.4      Key Public Views and Corresponding Design Considerations. 2-15

Table 2.5     Key Recommended Mitigation Measures / Good Site Practices / Enhancement Measures and their Associated Benefits. 2-18

Table 2.6      List of Concurrent Projects and Potential Cumulative Impacts  2-24

Table 3.1      Hong Kong Air Quality Objectives. 3-1

Table 3.2     The Air Quality Monitoring Data Recorded at EPD’s Tuen Mun AQMS in Year 2016 – 2020. 3-3

Table 3.3      PATHv2.1 Model - Air Pollutant Concentrations in Year 2025  3-3

Table 3.4      Representative Air Sensitive Receivers along TME.. 3-4

Table 3.5      Representative Air Sensitive Receivers in the  vicinity of Offsite Works Area. 3-6

Table 3.6      Particle Size Distribution. 3-10

Table 3.7      Dust Emission Design Control Measures. 3-10

Table 3.8      Emission Factors for Dusty Construction Activities. 3-11

Table 3.9      Fractions of Particulates for Construction Dust 3-11

Table 3.10   Tentative Construction Programme. 3-12

Table 3.11   Particle Size Distribution of Aggregate Handling (equivalent to Heavy Construction Activities and Wind Erosion) 3-16

Table 3.12   Worst Predicted Cumulative Air Quality Impact at Representative ASRs (Scenario 1 with Dust Mitigation Measures) 3-18

Table 3.13   Worst Predicted Cumulative Air Quality Impact at Representative ASRs (Scenario 2 with Dust Mitigation Measures) 3-19

Table 4.1      Noise Criteria for Daytime Construction Noise. 4-1

Table 4.2      Construction Noise Criteria during Restricted Hours. 4-2

Table 4.3      Acceptable Noise Levels for Airborne Rail Noise. 4-3

Table 4.4      Acceptable Noise Levels for Fixed Noise Source. 4-4

Table 4.5      Summary of Measured Prevailing Background Noise Levels  4-5

Table 4.6      Identified NSRs and Representative Assessment Points within 300m Assessment Area from the Project 4-7

Table 4.7      Summary of Unmitigated Construction Noise Levels. 4-16

Table 4.8      SWL of QPME adopted for Construction Noise Mitigation. 4-20

Table 4.9      Summary of Mitigated Construction Noise Levels (Non-Restricted Hours) 4-23

Table 4.10   Summary of Cumulative Noise Impact 4-31

Table 4.11   Maximum Allowable SWL for Planned Noise Source at A16 Station  4-34

Table 4.12   Maximum Allowable SWL for Planned Noise Source at TMS Station  4-34

Table 4.13   Assumptions Adopted in Railway Noise Assessment 4-38

Table 4.14   Summary of Unmitigated Rail Noise Levels. 4-40

Table 4.15   Summary of Cumulative Rail Noise Levels (Unmitigated Scenario) 4-43

Table 4.16   Proposed Noise Mitigation Measures for Rail Operation. 4-45

Table 4.17   Summary of Mitigated Rail Noise Levels. 4-46

Table 4.18   Summary of Cumulative Rail Noise Levels (Mitigated Scenario) 4-49

Table 5.1      Summary of Water Quality Objectives for North Western WCZ  5-1

Table 5.2      WSD Standards at Flushing Water Intakes. 5-5

Table 5.3     Summary Statistics of Marine Water Quality of North Western WCZ Collected by EPD in 2020. 5-6

Table 5.4    Summary Statistics of River Water Quality of Tuen Mun River Collected by EPD in 2020. 5-8

Table 6.1      Summary of Inert and non-inert C&D Materials Quantities Generated  6-6

Table 6.2      Changes in Sampling Location ID.. 6-8

Table 6.3      Summary of Chemical Screening Results. 6-10

Table 6.4      Summary of Biological Screening Results. 6-10

Table 6.5      Estimated Quantities of Sediment under each Disposal Option  6-11

Table 6.6      Waste Arising, Waste Handling Procedures and Disposal Outlets  6-16

Table 7.1      Summary of Historical Land Uses of the Project Area. 7-3

Table 7.2      Summary of Potential Land Contamination Issues within the Project Area. 7-6

Table 7.3      Sampling and Testing Plan. 7-10

Table 8.1      Baseline Information of Ecological Resources within the Assessment Area. 8-2

Table 8.2      Ecological Survey Schedule. 8-6

Table 8.3      Maximum Number of Nests Recorded at Tuen Mun Egretry (2017 – 2021) 8-7

Table 8.4     Species of Conservation Importance Recorded from Literature Review for TME Alignment and the Mong Wing Street Offsite Works Area. 8-10

Table 8.5      Habitats Identified within the Assessment Area. 8-11

Table 8.6      Number of Nests Recorded at Tuen Mun Egretry. 8-13

Table 8.7     Number and Species of Night Roost Ardeid Recorded during Ardeid Night Roost Survey. 8-14

Table 8.8     Ecological Evaluation of Modified Watercourse and Developed Area within the Assessment Area for TME Alignment 8-16

Table 8.9     Ecological Evaluation of Mixed Woodland, Village/Orchard and Plantation within the Assessment Area for TME Alignment 8-17

Table 8.10   Species of Conservation Importance Recorded within the Assessment Area for TME Alignment 8-18

Table 8.11   Ecological Evaluation of Habitats within the Assessment Area for Mong Wing Street Offsite Works Area. 8-20

Table 8.12  Direct Loss of Terrestrial Habitats within Project Footprint 8-21

Table 8.13   Evaluation of Potential Ecological Impacts to Developed Area and Modified Watercourse (Assessment Area of TME Alignment) 8-29

Table 8.14   Evaluation of Potential Ecological Impacts to Mixed Woodland, Village/Orchard and Plantation (Assessment Area of TME Alignment) 8-30

Table 8.15   Evaluation of Potential Ecological Impacts to Identified Habitats (Assessment Area of Offsite Works Area) 8-31

Table 8.16   Seasonal Sunset Time During Survey. 8-32

Table 8.17   Summary of Construction Works/Activities within 100m from Ardeid Night Roost and the Associated  Mitigation Measures for the Ardeid Night Roost 8-33

Table 9.1     Relationship between Sensitivity and Magnitude of Change in Defining Impact Significance. 9-5

Table 9.2     Relationship between Visually Sensitive Receivers (VSRs) Sensitivity and Magnitude of Change in Defining Impact Significance. 9-7

Table 9.3      Summary of the Review of Planning and Development Control Framework. 9-9

Table 9.4      Landscape Resources and Their Sensitivity. 9-12

Table 9.5      Landscape Character Areas and Their Sensitivity. 9-18

Table 9.6      Visually Sensitive Receivers (VSRs) and Their Sensitivity. 9-23

Table 9.7      Magnitude of Landscape Impact during Construction and Operation  9-28

Table 9.8      Magnitude of Visual Impact during Construction and Operational Phases. 9-41

Table 9.9      Proposed Landscape and Visual Mitigation Measures for Construction Phase.

. 9-45

Table 9.10   Proposed Landscape and Visual Mitigation Measures for Operational Phase. 9-47

Table 9.11   Significance of Landscape Impact during Construction and Operational Phases. 9-53

Table 9.12   Significance of Visual Impact during Construction and Operational Phases. 9-59

Table 11.1   Population within Consultation Zone of the LPG Store. 11-9

Table 11.2   Road Population in Construction Phase Scenario (Year 2026) 11-10

Table 11.3   Road Population in Operational Phase Scenario (Year 2031) 11-10

Table 11.4   Train Population in Operational Phase Scenario (Year 2031) 11-10

Table 11.5   Pedestrian Population. 11-11

Table 11.6   Definitions of Time Modes. 11-11

Table 11.7   Stability Category-Wind Speed Frequencies at HKO Tuen Mun Weather Station. 11-12

Table 11.8   Weather Class-Wind Direction Frequencies at HKO Tuen Mun Weather Station. 11-12

Table 11.9   Identified Failure Cases for the LPG Store. 11-19

Table 11.10 Summary of Identified Failure Cases and Their Associated Failure Rates. 11-23

Table 11.11  Summary of Identified Failure Cases and Their Associated Failure Rates. 11-26

Table 11.12  Summary of Road Ignition Sources for Construction Phase (Year 2026) 11-31

Table 11.13  Summary of Road Ignition Sources for Operational Phase (Year 2031) 11-31

Table 11.14  Societal Risk Data for the LPG Store covering all Assessed Scenarios. 11-37

Table 11.15  Breakdown of PLL for the LPG Store by Major Events (All Assessed Scenarios) 11-39

Table 13.1  Summary of Key Environmental Problems Avoided and Sensitive Areas Protected. 13-3

Table 13.2  Key Recommended Mitigation Measures / Good Site Practices / Enhancement Measures and their Associated Benefits. 13-5

Table 14.1  Summary of Key Environmental Outcomes and Benefits. 14-2