TABLE OF CONTENTS Page
1.0 |
1 |
|
2.0 |
|
|
|
2.1 Scope of the
Project |
2 |
|
2.2 Site Description |
2 |
|
2.3 Construction
Programme |
2 |
|
2.4 Project Organization
and Management Structure |
2 |
|
2.5 Contact Details
of Key Personnel |
2 |
3.0 |
3 |
|
4.0 |
|
|
|
4.1 Monitoring
Requirement |
4 |
|
4.2 Monitoring
Equipment |
4 |
|
4.3 Monitoring
Parameters, Frequency and Duration |
4 |
|
4.4 Monitoring
Locations and Schedule |
4 – 5 |
|
4.5 Monitoring
Methodology |
5 – 6 |
|
4.6 Action and Limit
levels |
6 |
|
4.7 Event-Action
Plans |
7 |
|
4.8 Results and
Observation |
7 |
5.0 |
|
|
|
5.1 Monitoring
Requirements |
8 |
|
5.2 Monitoring
Equipment |
8 |
|
5.3 Monitoring
Parameters, Duration and Frequency |
8 |
|
5.4 Monitoring
Locations and Period |
8 |
|
5.5 Monitoring
Procedures and Calibration Details |
8 – 9 |
|
5.6 Action and Limit
levels |
9 |
|
5.7 Event-Action
Plans |
9 |
|
5.8 Results and
Observation |
9 – 10 |
6.0 |
|
|
|
6.1 Monitoring
Requirements |
11 |
|
6.2 Monitoring
Locations |
11 |
|
6.3 Monitoring
Parameters |
11 |
|
6.4 Monitoring
Frequency |
11 |
|
6.5 Monitoring
Methodology and Equipment Used |
12 – 13 |
|
6.6 Action and Limit
Level |
13 |
|
6.7 Event and Action
Plan |
14 |
|
6.8 Monitoring
Duration and Period in this reporting month |
14 |
|
6.9 Marine Water
Monitoring Results |
14 |
7.0 |
|
|
|
7.1 IEC site Audits |
15 – 16 |
|
7.2 Weekly ET Site Inspections |
17 – 18 |
|
7.3 Review of Environmental Monitoring
Procedures |
18 – 19 |
|
7.4 Assessment of Environmental Monitoring
Results |
19 |
|
7.5 Advice on the Solid and Liquid Waste
Management Status |
19 |
8.0 |
20 |
|
9.0 |
|
|
|
9.1 Summary of air quality, noise and marine water quality |
21 |
|
9.2 Summary of
Environmental Complaints |
21 |
|
9.3 Summary of
Notification of Summons and Prosecution |
21 |
10.0 |
|
|
|
10.1 Implementation
Status of Environmental Mitigation Measures |
22 |
|
10.2 Implementation
Status of Event and Action Plan |
22 |
|
10.3 Implementation Status of Environmental Complaint,
Notifications of Summons and Successful Prosecutions Handling |
22 |
11.0 |
23
– 24 |
|
12.0 |
|
|
|
12.1 Construction
Programme for the Coming Month |
25 |
|
12.2 Key Issues for
the Coming Month |
25 – 26 |
|
12.3 Monitoring
Schedule for the Coming Month |
26 |
|
|
|
|
|
|
|
|
Figure 1 |
Air Quality Environmental Monitoring Stations |
Figure 2 |
Noise Environmental Monitoring Station |
Figure 3 |
Water Quality Monitoring Stations |
Tables |
|
2.1 |
Contact Details of Key Personnel |
4.1 |
Air Quality Monitoring Equipment |
4.2 |
Monitoring parameters, duration and frequency
of air quality monitoring |
4.3 |
Air Quality Monitoring Locations |
4.4 |
Monitoring Schedule for air quality monitoring
stations |
4.5 |
Action and Limit levels for 24-hr TSP and 1-hr
TSP |
5.1 |
Noise Monitoring Equipment |
5.2 |
Duration, Frequency and Parameters of noise
monitoring |
5.3 |
Noise Monitoring Locations |
5.4 |
Monitoring Period for noise monitoring
stations |
5.5 |
Action and Limit levels for noise monitoring |
6.1 |
Location of Marine Water Monitoring Stations |
6.2 |
Marine Water Quality Monitoring Parameters |
6.3 |
The monitoring frequency of the marine water |
6.4 |
Summary of testing procedures |
6.5 |
Details of Water Quality Monitoring Equipment
(In-site measurement) |
6.6 |
Water Quality Action and Limit Level |
6.7 |
Time Schedule of Water Quality Monitoring |
6.8 |
Summary of Marine Water Quality Exceedances in this
reporting month |
6.9 |
Daily summary of recorded of marine water quality |
7.1 |
Dates of IEC Site Audits in this reporting month |
7.2 |
Key Findings of Site Audits in this
reporting month |
8.1 |
Summary of environmental licensing and permit
status |
10.1 |
Summary of Environmental Complaints and
Prosecutions |