TABLE OF CONTENTS                                                                                                              Page

 

Executive SUMMARY

 

1.0

INTRODUCTION

1

2.0

PROJECT INFORMATION

 

 

2.1 Scope of the Project

2

 

2.2 Site Description

2

 

2.3 Construction Programme

2

 

2.4 Project Organization and Management Structure

2

 

2.5 Contact Details of Key Personnel

2

3.0

Construction progress in this reporting month

3

4.0

Air Quality Monitoring

 

 

4.1 Monitoring Requirement

4

 

4.2 Monitoring Equipment

4

 

4.3 Monitoring Parameters, Frequency and Duration

4

 

4.4 Monitoring Locations and Schedule

4 – 5

 

4.5 Monitoring Methodology

5 – 6

 

4.6 Action and Limit levels

6

 

4.7 Event-Action Plans

7

 

4.8 Results and Observation

7

5.0

Noise Monitoring

 

 

5.1 Monitoring Requirements

8

 

5.2 Monitoring Equipment

8

 

5.3 Monitoring Parameters, Duration and Frequency

8

 

5.4 Monitoring Locations and Period

8

 

5.5 Monitoring Procedures and Calibration Details

8 – 9

 

5.6 Action and Limit levels

9

 

5.7 Event-Action Plans

9

 

5.8 Results and Observation

9 – 10

6.0

Marine water quality monitoring

 

 

6.1 Monitoring Requirements

11

 

6.2 Monitoring Locations

11

 

6.3 Monitoring Parameters

11

 

6.4 Monitoring Frequency

11

 

6.5 Monitoring Methodology and Equipment Used

12 – 13

 

6.6 Action and Limit Level

13

 

6.7 Event and Action Plan

14

 

6.8 Monitoring Duration and Period in this reporting month

14

 

6.9 Marine Water Monitoring Results

14

7.0

IEC Site audit and weekly ET Site inspections

 

 

7.1 IEC site Audits

15 – 16

 

7.2 Weekly ET Site Inspections

17 – 18

 

7.3 Review of Environmental Monitoring Procedures

18 – 19

 

7.4 Assessment of Environmental Monitoring Results

19

 

7.5 Advice on the Solid and Liquid Waste Management Status

19

8.0

Status of environmental licensing and permitting

20

9.0

Environmenatl non-conformance

 

 

9.1 Summary of air quality, noise and marine water quality

21

 

9.2 Summary of Environmental Complaints

21

 

9.3 Summary of Notification of Summons and Prosecution

21

10.0

Implementation Status

 

 

10.1 Implementation Status of Environmental Mitigation Measures

22

 

10.2 Implementation Status of Event and Action Plan

22

 

10.3 Implementation Status of Environmental Complaint, Notifications of Summons and Successful Prosecutions Handling

22

11.0

Conclusion and Recommentations

23 – 24

12.0

Future key issue

 

 

12.1 Construction Programme for the Coming Month

25

 

12.2 Key Issues for the Coming Month

25 – 26

 

12.3 Monitoring Schedule for the Coming Month

26

 

 

 

 

 

 

 

 

APPENDIX

A

Organization Chart and Lines of Communication

B1

Calibration Certificates for Impact Air Quality Monitoring Equipment

B2

Impact Air Quality Monitoring Results

B3

Graphical Plots of Impact Air Quality Monitoring Data

C1

Calibration Certificates for Impact Noise Monitoring Equipment

C2

Impact Noise Monitoring Results

C3

Graphical Plots of Impact Noise Monitoring Data

D1

Calibration Certificates for Marine Water Quality Monitoring Equipment

D2

Impact Marine Water Quality Monitoring Results

D3

Graphical Plots of Impact Marine Water Quality Monitoring Data

E

Weather Condition

F

Event-Action Plans

G

Construction Programme

H

IEC’s Site Audit Record

I

Weekly ET’s Site Inspection Record

J

Implementation Schedule of Mitigation Measures

K

Site General Layout Plan

L

Monitoring Schedule for the Coming Month

M

Complaint Log

 

 

Figures

 

Figure 1

Air Quality Environmental Monitoring Stations

Figure 2

Noise Environmental Monitoring Station

Figure 3

Water Quality Monitoring Stations

 

 

Tables

 

2.1

Contact Details of Key Personnel

4.1

Air Quality Monitoring Equipment

4.2

Monitoring parameters, duration and frequency of air quality monitoring

4.3

Air Quality Monitoring Locations

4.4

Monitoring Schedule for air quality monitoring stations

4.5

Action and Limit levels for 24-hr TSP and 1-hr TSP

5.1

Noise Monitoring Equipment

5.2

Duration, Frequency and Parameters of noise monitoring

5.3

Noise Monitoring Locations

5.4

Monitoring Period for noise monitoring stations

5.5

Action and Limit levels for noise monitoring

6.1

Location of Marine Water Monitoring Stations

6.2

Marine Water Quality Monitoring Parameters

6.3

The monitoring frequency of the marine water

6.4

Summary of testing procedures

6.5

Details of Water Quality Monitoring Equipment (In-site measurement)

6.6

Water Quality Action and Limit Level

6.7

Time Schedule of Water Quality Monitoring

6.8

Summary of Marine Water Quality Exceedances in this reporting month

6.9

Daily summary of recorded of marine water quality

7.1

Dates of IEC Site Audits in this reporting month

7.2

Key Findings of Site Audits in this reporting month

8.1

Summary of environmental licensing and permit status

10.1

Summary of Environmental Complaints and Prosecutions